Filter Results

4001 to 4025 of 5513
isrd21424
. Frestedt, referencing the site plan, noted that the bulk of other activation work planned for under I-5 ...
0.002189566 |
a/166849
seattledesigncommission-2011.01.20sr520improvementprojectminutes
seattledesigncommission-2011.01.20sr520improvementprojectminutes APPROVED MINUTES OF THE MEETING Mike McGinn Mayor Diane Sugimura ...
0.002189566 |
a/85600
24.10.09 meeting summary
that they found 5 or 6 different certified GFAs for the same building – between the King County assessor, State database, ...
0.002189566 |
a/161682
5983camhighpiledstorage
and the storage arrangement, regardless of pre-existing conditions. 5. Architectural plans for new ...
0.002189566 |
a/64061
dadu_submission004
WITH STUDS, OVER WRB, OVERWALL FRAMING PER STRUCT, OVER PAINTEDAND PRIMED GWBEXTGWB EDGE OVER BLACK PAINTED BOTTOMPLATE; CONC SLAB PER ...
0.002189566 |
a/86798
surveyofhumanservicesudistirct
). (I mentioned here that I had heard discussion in the past regarding planning of the UDECC facility that there was an ...
0.002189566 |
a/87809
2021sfcchapter2
, or the time any person is present, whichever time period is less. [S][BG] AWNING. ((An architectural projection that ...
0.002189566 |
a/162446
urmfinalrecommendations
LLC Christchurch, NZ recovery Bob Freitag University of Washington Urban and Hazard Mitigation Planning David Gonzalez ...
0.002189566 |
a/96918
dcpresentation1fire-station-20---queen-anne-interbayagendaid3369
of Systems—Lighting1ffdConstruction IAQ Management Plan—Before OccupancyMaterials and Resources, ContinuedWater ...
0.002189566 |
a/85181
seattledesigncommission-2016.05.05southtransferstationiipresentat ...
facilities are past useful life. •Current South Transfer Station was not planned to accommodate all solid waste needs. SRDS ...
0.002189566 |
a/85948
2022.12.01_north 130th street station_presentation
•Locatedat5thAveNE andNE 130thSt•Included in 2016 ST3 Plan asinfillstation•Timingin ST3Plan-start2024, open2031•Current ...
0.002189566 |
a/140881
psb0903252001sgrandpp2
FOR REHABILITATION AND NEW CONSTRUCTIONNew construction must be visually compatible with the predominant architectural ...
0.002189566 |
a/172563
psb0903252001srgrandpp
FOR REHABILITATION AND NEW CONSTRUCTIONNew construction must be visually compatible with the predominant architectural ...
0.002189566 |
a/172560
copyofseattledesigncommission-2014.06.05centercityconnectorpresen ...
Framework Plan •Existing Conditions Analysis •Guiding Principles Definition Makers Architecture and ...
0.002189566 |
a/84812
2012sbcintro
better understanding of the code.AcknowledgementThe Department of Planning and Development (DPD) thanks the members of the ...
0.002189566 |
a/97377
guidelines for the treatment of cultural landscapes
,archeology,architecture,engineering(e.g.civil,structural,mechanical,traffic),culturalgeography,wildlife,ecology,ethnograph ...
0.002189566 |
a/74353
2020.04.02seattledesigncommission-freewayparkimprovements_present ...
PLAZABUILDINGSUPPER LAWNS SENECA PLAZA PROGRAMGeneral Design Approach:The design team hoped to build upon the original park’s design, ...
0.002189566 |
a/84838
seattledesigncommission-2018.08.02scl_broadstreetsubstation_vacat ...
briefing.SUMMARY OF REVIEWSSDC Meeting 3/15/18• Concern about placement, height and materiality of enclosure/wall• ...
0.002189566 |
a/85859
lpb030426seattlebrewmaltofficebp
character of the period. In contrast to the adjacent production facilities, the General Offi ce Building is architecturally ...
0.002189566 |
a/178064
ordinanceresolution-2008
to balance a number of policies and objectives, and the master plan process is an important element of the Major ...
0.002188811 |
a/77286
spu_cac_bios_august_2020
in the private sector maritime industry managing vessel and cargo operations in Puget Sound. Eric recently retired from the Port of Seattle ...
0.002188811 |
a/77205
designandenvironmentalreview
designandenvironmentalreview Design Review focuses on urban and architectural design.The Design Review process focuses on ...
0.002188811 |
a/88131
king street station - design fact sheet
, professional development and other services. The plan also calls for meeting rooms and gathering space available for city ...
0.002188811 |
a/49213
seattle_pacific_university_cac_bios_august_2020_crd
. Eric spent ten years working in the private sector maritime industry managing vessel and cargo operations in Puget Sound. Eric recently ...
0.002188811 |
a/77198
lpb7-1-15-minutes
, and is compatible with the massing, size and scale and architectural features of the landmark, as per Standard #9 of the ...
0.002188811 |
a/74683