Filter Results

3726 to 3750 of 5716
stcfinallayout
opportunities for people to start relatively low-cost small businesses. The City recently streamlined the permitting ...
0.00219586631 |
a/109276
lpbcurrentnom_hk foods
to be the original aluminum sash. Permitted changes to the subject property are as follows: 1958: Construction completed ...
0.00219586631 |
a/74485
22-0721_fs 31_sdc dd review
DESIGN DEVELOPMENT REVIEW | 4SCHEDULE ...
0.00219586631 |
a/131893
cedarrivermunicipalwatershedforestmanagementplanfinal
and sale of surplus logs as road access permits. The projects will be monitored to track understory development and to ...
0.00219586631 |
a/150338
lpbcurrentnom_bryantmarina
report prepared in November – December. Sources of historic research materials included the following:  City of Seattle Department of ...
0.00219586631 |
a/74436
route_8_corridor_study_final_report_20250207
left turn lane and a shared through/right turn lane. The westbound approach of E John Street was also revised to include a ...
0.00219586631 |
a/173443
lpb111523battellebp
Architects hired to work with Site Workshop to assess project, revise campus site plan, bring more emphasis and context ...
0.00219586631 |
a/149546
spd alpr (patrol) - final sir
ALPR may be used during routine patrol or any criminal investigation. 4. Only Employees With ACCESS Level 1 Certification May Access ALPR ...
0.00219586631 |
a/117369
psb080223citylighthatchpp
. The vaultis an areaway vault, and the structure supporting the vault ceiling (which is also the sidewalk) is in poor condition, so we are ...
0.00219586631 |
a/145047
south-park-green-space-vision-plan_6.17.14_final-with-appendix
of habitat for juvenile salmon,while maintaining the shoreline in a form that protects adjacentland use and allows full use of the ...
0.00219586631 |
a/57485
grand_central_presentation
improvements6714121-CN 3035920-LU410949 (SIP)OUTLINE OF PROPOSED WORK:PERMIT NUMBERS:DESCRIPTION OF WORK :BUILDING ...
0.00219586631 |
a/74152
gc_pres
3035920-LU410949 (SIP)OUTLINE OF PROPOSED WORK:PERMIT NUMBERS:DESCRIPTION OF WORK :BUILDING ...
0.00219586631 |
a/74144
2023_0224 - presentation_ t6 public trust_dc#2_final
also revised the graphic illustrations for the no alley vacation option, to make for a clearer comparison between options. ...
0.00219586631 |
a/139741
pspb100522westlandpp
Architects of record, engineering by Perbixengineering; building maintains exterior character and condition.•Other permits ...
0.00219586631 |
a/134388
isrd510_briefing
SEDU B1 277 SF 7236 REGISTERED ARCHITECT DAVID NEIMAN STATE OF WASHINGTON No. Date Revision Designer's Stamp 701 S JACKSON ...
0.00219586631 |
a/127844
4-5_publichearingmarked_mha_feis_2017
to the beginning of --·4· ·mid-November of 2016, we provided building permits for·5· ·over 23,000 units of just housing, ...
0.00219586631 |
a/65049
south-park-green-space-vision-plan_6.17.14_final-with-appendix
of habitat for juvenile salmon,while maintaining the shoreline in a form that protects adjacentland use and allows full use of the ...
0.00219586631 |
a/90421
11icsoreductionprogramodormanagementguidelines
Article 5.03, PSCAA currently requires registration of regulated air emission sources and grants operating permits. ...
0.00219586631 |
a/154310
august 2023 sfab minutes approved
and able to be able to answer that, but it's where we actually get special permits to get vehicles through an area. So, ...
0.00219586631 |
a/147926
2010semi_annual_report
police chief, and • Distribute revised, updated brochures describing the OPA system and how to make a complaint or register ...
0.00219586631 |
a/53822
oparb_strat_plan_2013 - 2014_01-17-13
). A. Seek OPARB member appointment to the CPC; B. Present to the CPC OPARB’s Policy Report to the City Council, ...
0.00219586631 |
a/53832
2026_february_pscsc-signed
schedule of the Commission staff shall be Monday through Friday, excluding official City holidays, as staffing permits. ...
0.00219586631 |
a/178007
cip_fas
development and execution. Every year, FAS revises the list of facility asset preservation projects that must be addressed. ...
0.00219586631 |
a/178172
northgateregionalcenterdraftplanappendix04_housingfinancialfeasib ...
Date: September 20, 2024 Re: REVISED Northgate Regional Center Real Estate Development Financial Feasibility Analysis ...
0.00219586631 |
a/178272
shapeourwater-aquatichabitat
for SPU’s instream capital projects (planning, design, implementation, permitting and performance monitoring), and for ...
0.00219586631 |
a/133737