Filter Results

326 to 350 of 1913
scl salvage unit fraud risk audit report 6_5_14
implemented changes or is in-progress to the following areas: • City Light and the Department of Finance and Administrative Services (FAS) ...
0.002194292 |
a/50627
introduction
a program to negotiate with existing vendors for rebates, resulting in $75,000 in anticipated savings and more competitive ...
0.002194128 |
a/61846
2017-2022proposedcipbook
(Savings): Estimate of significant increases or decreases in operations and maintenance costs as a result of a capital ...
0.002194128 |
a/62713
2017-2022adoptedcip
in operations and maintenance costs as a result of a capital project. “N/C” denotes that operations and maintenance costs ...
0.002194128 |
a/62698
2011-2016_adopted_cip
of significant increases or decreases in operations and maintenance costs as a result of a capital project. “N/C” denotes ...
0.00219408819 |
a/61786
adu_feis_2018_appendices
potentially cause a shift from owner-occupancy to renter-occupancy. This appendix summarizes the methodology and results of ...
0.00219408819 |
a/53195
m-appadu_feis_2018_appendices
potentially cause a shift from owner-occupancy to renter-occupancy. This appendix summarizes the methodology and results of ...
0.00219408819 |
a/53204
seattle drainage os 2021
are forecasts and “forward-looking statements.” No assurance can be given that the future results shown herein will be ...
0.00219408819 |
a/58485
final_2011-2016_cip
of significant increases or decreases in operations and maintenance costs as a result of a capital project. “N/C” denotes ...
0.00219366164 |
a/61799
nepadce
Power System Substation EMF and Noise Measurements Results Appendix R Corridor Concept Design Layout Appendix S Errata ...
0.00219366164 |
a/106201
appdxb_culturalresourcesdr_redacted_noisevibration_tsl
............................................................................................................................................ ...
0.00219355943 |
a/100828
spog cba 2021 - 2023 moas w links
of the shift bid results being announced. Paid time off requests submitted within that two-week period ...
0.00219341484 |
a/157431
fepp_ie_plan_amended_v5cb_120398_ord_att 2
the city to inform development of the I&E Plan. The result of the many conversations, advisory groups, workgroups, and ...
0.00219324534 |
a/146240
fepp_levy_implementationandevaluationplan
across the preschool to post-secondary continuum and throughout the city to inform development of the I&E Plan. The result ...
0.00219324534 |
a/78991
fepp levy implementation and evaluation plan
across the preschool to post-secondary continuum and throughout the city to inform development of the I&E Plan. The result ...
0.00219324534 |
a/55374
1_080600
of option’s values 6) Pairing of option’s values with life cycle costs The results of the value modeling process showed ...
0.00219324534 |
a/113524
fepp_levyimplementationandevaluationplan_adopted 2018
stakeholders across the preschool to post-secondary continuum and throughout the city to inform development of the I&E Plan. The ...
0.00219324534 |
a/55908
fepp_levyimplementationandevaluationplan
across the preschool to post-secondary continuum and throughout the city to inform development of the I&E Plan. The result ...
0.00219324534 |
a/55907
2017annualwastewatercollectionsystemreport
Arterial Street Sweeping Program .............................................................................. 49 Section 5 Monitoring ...
0.0021932316 |
a/114367
lund_golfstudy_final
resulted in downgrading the quality of the course. Public Perceptions about Seattle’s Municipal Golf CoursesStakeholder ...
0.00219315523 |
a/92554
k - 6 earthquake cirriculum tremor troop
in this unit.Unit II, Why and Where Earthquakes Occur, pre-sents the modern scientific understanding of theEarth’s structure and ...
0.00219290284 |
a/57221
2016annualwastewatercollectionsystemreport
Streetsweeping Program ...............................................................54 Section 5 Monitoring Programs and Monitoring ...
0.00219290284 |
a/114366
2016-2021proposedcapitalimprovementprogram9-23-15
increases or decreases in operations and maintenance costs as a result of a capital project. “N/C” denotes that operations ...
0.00219248887 |
a/62334
2014annualwastewatercollectionsystemreport
................................................................................ 4-20 Section 5 Monitoring Programs and Monitoring ...
0.00219248887 |
a/114334
201621adoptedcip
funds at the Budget Control Level. O&M Costs (Savings): Estimate of significant increases or decreases in operations and maintenance ...
0.00219248887 |
a/62537