Filter Results

276 to 300 of 2655
2024floodplainregulationssepadns
the review of permit applications and determining compliance of the regulations through issuing or denying ...
0.002265637 |
a/158929
adoptedufcmeetingnotes100720
quality Exceptional trees removed. 5. Compounding the harm from wholesale elimination of trees and building demolition, ...
0.002265545 |
a/119045
2016-2021proposedcapitalimprovementprogram9-23-15
Elimination System (NPDES) permits, one for storm water and one for combined sewer system. The City is required, for ...
0.00226486078 |
a/62334
201621adoptedcip
. The City of Seattle must abide by the City's two National Pollutant Discharge Elimination System (NPDES) permits, one ...
0.00226486078 |
a/62537
streettreemanuaweb
and Penalties 10 Street Tree Permitting 12 Street Tree Planting 15 Planting Guidance 17 Street Tree Pruning 19 Pruning ...
0.002264807 |
a/106618
streettreemanualweb
and Penalties 10 Street Tree Permitting 12 Street Tree Planting 15 Planting Guidance 17 Street Tree Pruning 19 Pruning ...
0.002264807 |
a/99224
streettreemanualweb
and Penalties 10 Street Tree Permitting 12 Street Tree Planting 15 Planting Guidance 17 Street Tree Pruning 19 Pruning ...
0.002264807 |
a/99145
udistrictfeiscomments
city wide some 50,000 units of new market rate espensive units (counting those going thru permitting). That correlates with ...
0.00226479163 |
a/87835
vol_4_sourcecontrol_jan2026draft_redlines
● Phase I National Pollutant Discharge Elimination System (NPDES) Municipal Stormwater General Permit ● Washington State ...
0.00226477836 |
a/176462
4-5_commentsn-z_marked_mha_feis_2017
blocks surrounding my home be demolished and replaced by $700K townhouses. There are four formerly-affordable houses in the process of ...
0.00226449547 |
a/65048
opcdregionalcentersplandowntownseattledraftplansummaryappendices
Waterfront Pier.  …†ƒŒ12345Regularly review, simplify, and optimize permitting regulations and processes that aff ect ...
0.00226426544 |
a/176270
oneseattleplancomparisoncrosswalktable
in H 2.4. H 5.11 Require advance notice to all tenants and payment of relocation assistance to tenants with household incomes below ...
0.002264054 |
a/169156
c3_delivery_assessment_10312023
through the City’s permitting process, the issue of the eligibility of an existing structure on the site for designation as ...
0.002264053 |
a/151747
seattlemayorsrecommendedplan
to tenants with household incomes below established thresholds before issuing permits for housing ...
0.002264053 |
a/87660
2006-2011_entire_adopted_cip
or infrastructure improvements. The project may include flow monitoring, modeling, property acquisition, preliminary engineering, design, ...
0.00226402236 |
a/60879
2016stormwatercode
; 4. To meet the requirements of state and federal law and the City's municipal stormwater National Pollutant Discharge Elimination System ...
0.002263618 |
a/96456
2006-2011_pdf_cip
monitoring, modeling, property acquisition, preliminary engineering, design, permitting, public works contracting, ...
0.00226339651 |
a/60933
seattle drainage 2023 pos
of the successful bidder’s bid, in sufficient quantities to permit the successful bidder to comply with Rule 15c2-12. By ...
0.00226288754 |
a/142585
proposedecaseparegulations
Zone Residential uses Permit applications for additions, modifications, demolition, or Margaret Glowacki ...
0.002262713 |
a/96795
vol4_sourcecontrol_july2025draft_redlines
) Municipal Stormwater General Permit ● Washington State Department of Ecology (Ecology) Stormwater Management Manual for ...
0.002262713 |
a/170617
fundingurmretrofits
-pertise could be an essential ingredient in moving a project forward. Additionally, creating a separate internal team at SDCI to expedite ...
0.00226260326 |
a/96872
southdowntowndrafteis
. However, similar to Pioneer Square, intentional disinvestment or litigation could potentially lead to the eventual granting of ...
0.00226260326 |
a/88168
public meeting #2 table of changes_jan2026
Review Draft Stormwater Code ● Added and updated definitions and requirements for clarity and to be consistent with the 2024 Phase I ...
0.00226257928 |
a/176479
seattle drainage 2023 os
of principal of or interest on the Bonds, or any notice which is permitted or required to be given to Registered Owners ...
0.00226249988 |
a/143033
finalstormwatermanualvolume2
C1.15: Material Delivery, Storage, and Containment ................. 5-3 5.1.2. BMP C1.20: Use of Chemicals During ...
0.00226238486 |
a/96547