Filter Results

2526 to 2550 of 11044
constructionlist_082523
constructionlist_082523 Date(s) and TimesProject /LocationDescription of Traffic ImpactsLocationAugust 25 - 27SR 520 EB ...
0.0030355968 |
a/146089
2020opa-0068ccs102620
in the first person. EXECUTIVE SUMMARY: The Complainant alleged that Named Employee #1 was rude to her during a traffic ...
0.0030355968 |
a/83125
2018opa-1148ccs052219
are written in the first person. EXECUTIVE SUMMARY: It was alleged that the Named Employee retaliated against the Subject when she ...
0.0030355968 |
a/82732
light rail review panel letter on ne 130th st station
traffic volumes, planned bicycle facilities, and opportunity for bus route restructuring, NE 130th St is a superior ...
0.0030355968 |
a/55978
2019opa-0027ccs062519
the misconduct alleged and therefore sections are written in the first person. EXECUTIVE SUMMARY: The Complainant alleged that the Named ...
0.0030355968 |
a/82758
mpac minutes 05.08.2024
to this general topic. 3 Event Classification & Traffic Control • De Abreu explains that, for the most part, large events ...
0.0030355968 |
a/157578
admiralexecsummary
ones.• There is not enough parking provided for new developments.• Need better transit, traffic calming and pedestrian ...
0.0030355968 |
a/107973
draftsaccomments18thave
bollards should be maintained and strengthened, particularly as the courtyard entry creates the possible intersection of pedestrian, bicycle ...
0.0030355968 |
a/77390
healthystreets_2022_faq
neighborhoods throughout the city. Healthy Streets are open for people walking, rolling, biking, and playing, and closed to pass-through ...
0.0030355968 |
a/137854
constructionlist_062323
constructionlist_062323 Date(s) and TimesProject /LocationDescription of Traffic ImpactsLocationJune 23 - 25EB SR 520 ...
0.0030355968 |
a/143888
2018opa-1056ccs043019
he effectuated a traffic stop. It was further alleged that the stop may not have been supported by reasonable suspicion and ...
0.0030355968 |
a/82693
19-61
SDOT approves project ☐ Yes ☐ Yes, with revisions ☒ No Comments: On August 6th, 2019, the Levy to Move Seattle Oversight Committee selected ...
0.0030355968 |
a/78301
june2016_sstsc_minutes
june2016_sstsc_minutes ...
0.0030355968 |
a/96163
draft_dag_19_minutes
the bridge is being built? What will the response time be for emergency vehicles? P.Smith: This information is in the ...
0.0030355968 |
a/101092
dag15_summary drft
a T intersection. There is a signalized intersection and a 2-way ramp that goes to the north. The bridge today does not provide for ...
0.0030355968 |
a/101068
2018opa-0747ccs030919
driver, drives in a manner that is outside of normal traffic restrictions.” The policy explains that eluding exists when: ...
0.0030355968 |
a/82568
wedgwooddns_analysis
; increased dust caused by construction activities; potential soil erosion and disturbance to subsurface soils during site work; increased ...
0.0030355968 |
a/93631
dns-analysis_littlesaigon
; increased dust caused by construction activities; potential soil erosion and disturbance to subsurface soils during site work; increased ...
0.0030355968 |
a/128288
spplaza_dns-analysis
caused by construction activities; potential soil erosion and disturbance to subsurface soils during site work; increased noise and ...
0.0030355968 |
a/93564
dns_analysisbgpg-improvements
; increased traffic from construction equipment and personnel; increased noise and displaced recreational users. Burke ...
0.0030355968 |
a/93033
3e_19-77
# 19-77 Project Title: Traffic calming Location: Neighborhood: Leschi, 98144 Area: 30th and 31st Avenue immediately north ...
0.0030355968 |
a/78244
morganjunctionexpansiondns-analysis
and disturbance to subsurface soils during site work; increased noise and traffic from construction equipment and ...
0.0030355968 |
a/93412
georgetownflume_dns_analysis
and traffic from construction equipment and personnel. Several adopted codes and/or ordinances provide mitigation for some ...
0.0030355968 |
a/93160
healthystreets_2023_faq
neighborhoods throughout the city. Healthy Streets are open for people walking, rolling, biking, and playing, and closed to pass-through ...
0.0030355968 |
a/139713
dag_19_minutes
. Smith: What about public safety while the bridge is being built? What will the response time be for emergency vehicles? P.Smith: This ...
0.0030355968 |
a/101079