You just searched for:
Search
Filter Results
2476 to 2500 of 2621
1financeandadministrativeservices
http://www.seattle.gov/documents/departments/financedepartment/1419proposed ...
Harbor Patrol Bulkhead project designs a new bulkhead to replace the existing, failing bulkhead at the Harbor Patrol Building. Design is ...
0.002186792 |
a/62172
originalvanasseltschool_ci_agreement
http://www.seattle.gov/documents/departments/neighborhoods/historicpreserva ...
materials, field lights, field drainage, ground source wells, and other track/field equipment. r. Demolition of the 1950 ...
0.002186792 |
a/75385
introduction_000
http://www.seattle.gov/documents/departments/financedepartment/1217adoptedc ...
Programs to meet federal and state regulatory requirements. The City of Seattle must abide by the City's two National Pollutant Discharge ...
0.002186792 |
a/61910
subcommittee 3 investing for the future
http://www.seattle.gov/documents/departments/parkdistrict/planning/subcommi ...
examples include Magnuson Community Center, Magnuson Building 406, and South Park Community Center (in permitting)). ...
0.002186792 |
a/126392
lpb2-17-21
http://www.seattle.gov/documents/departments/neighborhoods/historicpreserva ...
, and deemed to be a safety threat and unable to be reused. The SDCI Director conferred with the DON Director, and the Landmarks Board and ...
0.002186792 |
a/74648
july13docketpresentation
http://www.seattle.gov/documents/departments/seattleplanningcommission/minu ...
center.” This would be a permitted use under the current zoning and would therefore not need a Comprehensive Plan ...
0.002186792 |
a/108793
march222012approvedminutes
http://www.seattle.gov/documents/departments/seattleplanningcommission/minu ...
on temporary uses is not on the worksheet. Commissioner Persons wondered about the demolition of housing. Ms. Sheehy ...
0.002186792 |
a/108912
cap final executive summary
http://www.seattle.gov/documents/departments/economicdevelopment/arena ...
, potentially including NBA and NHL events, to Seattle and the region. • Provide for design, permitting, development, ...
0.002186792 |
a/56226
seattle questions aeg response finance and legal final1
http://www.seattle.gov/documents/departments/economicdevelopment/arena ...
include permitting and other fees that aren’t included in Exhibit 1. 6. The proposal states that one of the sources for ...
0.002186792 |
a/56280
general_govt_06-11
http://www.seattle.gov/documents/departments/financedepartment/0611proposed ...
this project are: tenant improvements at Seattle Municipal Tower; tenant improvements at Airport Way Center (formerly Park 90/5); ...
0.002186792 |
a/60951
introduction
http://www.seattle.gov/documents/departments/financedepartment/1419proposed ...
Programs to meet federal and state regulatory requirements. The City of Seattle must abide by the City's two National Pollutant Discharge ...
0.002186792 |
a/62184
introduction
http://www.seattle.gov/documents/departments/financedepartment/1217proposed ...
Pollutant Discharge Elimination System (NPDES) permits, one for stormwater and one for combined sewer system. The City is ...
0.002186792 |
a/61921
3039304-sd decision
http://www.seattle.gov/documents/departments/neighborhoods/majorinstitution ...
No. 3039304-SD Previous SEPA Related Actions Prior to application for a Public School Departure Permit, the District ...
0.002186792 |
a/142816
introduction
http://www.seattle.gov/documents/departments/financedepartment/1217adoptedc ...
Programs to meet federal and state regulatory requirements. The City of Seattle must abide by the City's two National Pollutant Discharge ...
0.002186792 |
a/61909
seattledesigncommission-2005.06.16interurbanexchangeivampvalleyva ...
http://www.seattle.gov/documents/departments/opcd/designcommission/projecta ...
the funding is for the public benefits package and does it include everything proposed o The public benefits are tied to the master use ...
0.002186792 |
a/85362
introduction
http://www.seattle.gov/documents/departments/financedepartment/1318proposed ...
. The City of Seattle must abide by the City's two National Pollutant Discharge Elimination System (NPDES) permits, one ...
0.002186792 |
a/61989
4185_preliminary_report_9082014
http://www.seattle.gov/documents/departments/fas/realestateservices/propert ...
on the property would be compatible with Chef ‘n’s use. Daniel Bretzke September 8 2014, Page 3 of 11 Any development of the ...
0.002186792 |
a/59338
spu_water_projects
http://www.seattle.gov/documents/departments/financedepartment/1015proposed ...
to be built on schedule. The project is part of SDOT's Bridging the Gap program and needs to be completed prior to ...
0.002186792 |
a/61731
seattledesigncommission-2004.03.04woodlandparkzoodiscoveryvillage ...
http://www.seattle.gov/documents/departments/opcd/designcommission/projecta ...
to add an educational component to the building that explains the history of the primate building on the site, and how the ...
0.002186792 |
a/85334
fascap
http://www.seattle.gov/documents/departments/financedepartment/1419adoptedc ...
, failing bulkhead at the Harbor Patrol Building. Design is funded in 2014 and permitting and construction will be ...
0.002186792 |
a/62158
sch10222025pp
http://www.seattle.gov/documents/departments/neighborhoods/majorinstitution ...
,LoadingandTransit3TMP Goal Prior to First Issuance of Building Permits.The goal for the TMP in the Master Plan will be to achieve an ...
0.002186792 |
a/174531
4186-preliminaryreport11102017
http://www.seattle.gov/documents/departments/fas/realestateservices/propert ...
to be heard by the Seattle Design Commission during the Master Use Permit (MUP) process to ensure that the proposed 8th Ave ...
0.002186792 |
a/59345
4185-revised-preliminary-report
http://www.seattle.gov/documents/departments/fas/realestateservices/propert ...
some of the condominium units. Expansion of Chef’n on the property would be compatible with Chef ‘n’s use. Any development of the property ...
0.002186792 |
a/59333
seattledesigncommission-2017.01.05portagebayparkminutes
http://www.seattle.gov/documents/departments/opcd/designcommission/portageb ...
team continues to develop refinements for park programming. SPR and the design team will hold four public meetings throughout the design ...
0.002186792 |
a/85081
light_projects
http://www.seattle.gov/documents/departments/financedepartment/0813adoptedc ...
in the 1970's and 1980 are reviewed, updated, and evaluated as a first phase. This first phase study includes review of construction costs, ...
0.002186792 |
a/61264