Filter Results

2176 to 2200 of 2790
2023 levy to move seattle annual report
significant maintenance needs; use racial equity assessment findings. • Add equity-related data layers into all ...
0.00159757177 |
a/155497
adoptedufcmeetingnotes040721
the trees. Site Plan 178 KB 02/07/17 3027149-LU Master Use Permit The existing ...
0.00159754825 |
a/119163
cam2110
: • If your project triggers the State Environmental Policy Act (SEPA) through the Master Use ...
0.00159752427 |
a/101600
2021-04-10.cemp.annexiv.evacuation.sop
of evacuation. Provide maps or diagrams to the media. • Provide a clear message to the public. Utilize the Mayor and/or ...
0.00159748073 |
a/57062
2022_stm_performance_report
on the RapidRide C, RapidRide E lines, as well as Routes 40, 62 and 70.The Seattle Transit Measure (STM) is helping us ...
0.00159748073 |
a/144724
stm_2022_performance_report
on the RapidRide C, RapidRide E lines, as well as Routes 40, 62 and 70.The Seattle Transit Measure (STM) is helping us ...
0.00159748073 |
a/144723
11jan27_jigglescomplaint
is attached to this complaint. Failure to obtain a Master Use Permit Violation 4.10 SMC ...
0.0015974472 |
a/50415
isrd011023_hr_701
historic district. It contains two buildings – a 1927 service garage and a relocated 1946 gas station. The property is currently ...
0.0015973897 |
a/137240
701_historic_report
historic district. It contains two buildings – a 1927 service garage and a relocated 1946 gas station. The property is currently ...
0.0015973897 |
a/73307
2023_0510_beacon-15thave_faq
if this work will be done in the interim project this summer, or with the larger capital project next summer. 2. We live in Rainier Beach ...
0.00159738574 |
a/144322
scc_sac_draftmimpcommentsfinal
4. When a Master Use Permit (MUP) application impacting a structure or place that is 50 ...
0.0015973819 |
a/77043
seattledesigncommission-2005.07.21seattlecentergarageminutes
, and the master use permit process. The proponents thank the Commission for their ...
0.0015973819 |
a/85364
spr
event facilities, Amy Yee Tennis Center (AYTC), athletic fields, and for revocable use permits. Through ...
0.00159727025 |
a/160719
streetvacationfaq
, request additional time. The City Council will determine whether an extension of time is appropriate. May I apply for a ...
0.00159719051 |
a/104873
seattleindustrialfeisch3.3
by the US Army Corps of Engineers (USACE), provides for permitting of any work in, over, or under ...
0.00159718911 |
a/134525
spu
toilets) and the Automatic Public Toilets program. Provide funds for payment to the Department of Design, Construction and Land ...
0.00159710215 |
a/60515
appendix_b_route_40_transportation_tech_report
travel time, not dissimilar to right-turning vehicles using a bus lane (as discussed Section 3.6). The Route 40 operates ...
0.00159708422 |
a/142744
itsstrategicplan20102020
Stations for collecting traffi c data which • may be used to provide a real-time traffi c conditions fl ow ...
0.0015970635 |
a/105858
itsstrategicplan20102020
Stations for collecting traffi c data which • may be used to provide a real-time traffi c conditions fl ow ...
0.0015970635 |
a/117134
route_8_corridor_study_final_report_20250207
is conducting a master planning study2 of I-5 throughout Washington State. This study is expected to include an analysis of ...
0.00159706292 |
a/173443
transportation
Street and 103rd Street. Northgate South Lot developer, Lorig Associates, is expected to fund approximately one third of the cost to ...
0.00159704965 |
a/60924
q4_2022_sbp_report
unsheltered populations including trash, sharps, (i.e., used needle collection) and recreational vehicle servicesAnnual ...
0.00159700878 |
a/139635
2015-oisgrantapp-gograntsfinal
of the geographic boundaries of your neighborhood business district and the area in which your work will focus.(Maximum characters allowed ...
0.001596997 |
a/56461
2015-oisgrantapp-gograntsfinal
your work will focus. (Maximum characters allowed 1,000) MAP OF DISTRICT If you have a map of your ...
0.001596997 |
a/56462
sdot_projects
to install the traffic signal as a condition of its Master Use Permit. The project ...
0.00159694813 |
a/61205