Filter Results

1226 to 1250 of 2790
matrixdraftreport7-15
Park Condition Summary of Public Interviews Regarding Park Condition Summary of Comparative Survey Results Assessment of Maintenance Stan ...
0.00163137482 |
a/118558
lpbcurrentnom_bryantmarina
it within a stipulated time frame. There is no local ordinance requiring an owner to nominate its property. Such a step may occur if an ...
0.00163117738 |
a/74436
little brooksepa dns
? The site is designated as City‐Owned Open Space according to the City’s 2035 Comprehensive Plan Future Land Use M ...
0.00163105235 |
a/151364
psbminutes8-16-17
in the area designated on Map B for 23.66.130: a. Any use occupying more than 50 percent of any block ...
0.00163101335 |
a/73817
techc
of Shilshole Avenue NW are not formally organized and have not been expressly approved or permitted by the City. Unstriped ...
0.0016309577 |
a/100523
birt_multimodal_needs_assessment
) ▪ Seattle Transit Master Plan (2016) ▪ Ballard to Downtown Transit Expansion Study (2014) Land Use and ...
0.00163091673 |
a/103960
dpd_245_268
; Seattle Shoreline Master Program; Seattle Tenant Relocation Assistance Ordinance; Seattle Tree Protection Ordinance; ...
0.00163090846 |
a/62097
sdotcap
million is eligible for use anywhere in Seattle. • The Pedestrian Master Plan – School Safety project ...
0.00163086725 |
a/62909
transportation
. The remaining $4 million is eligible for use anywhere in Seattle. • The Pedestrian Master Plan – School ...
0.00163086725 |
a/62919
sdot
, and speed limit signs. • The Bike Master Plan Protected Bike Lanes project includes $9.2 million in 2022 to provide a ...
0.00163079065 |
a/63567
lpbcurrentnom_lakecourt_final
Apartments; 4) Anhalt Apartments Source: Google Maps (2024) Figure 4: Site Plan (as prepared by H. Todd Kilburn, ...
0.00163078133 |
a/161994
lpbcurrentnom_lakecourt
; 4) Anhalt Apartments Source: Google Maps (2024) Figure 4: Site Plan (as prepared by H. Todd Kilburn, Architect (2018)) ...
0.00163078133 |
seattle_ccc_lpa_rpt_final_9-2014
(Seattle TMP Concept) Source: Map adapted from Seattle Transit Master Plan Summary Report, 2012, Figure ...
0.00163055921 |
a/99457
lpbcurrentnom_spu_southtransferstation
LIMITATIONS ON USE OF THE LAND AND THE REQUIREMENT FOR MONETARY COMPENSATION PRIOR TO TRANSFER OF JURISDICTION TO SEATTLE ...
0.00163040357 |
a/74544
lpbcurrentnom_blackford
and date from October 2019. Sources used in this report include: • Copies of the original drawing set and historic building ...
0.001630401 |
a/75352
lpbcurrentnom_blackford
and date from October 2019. Sources used in this report include: • Copies of the original drawing set and historic building ...
0.001630401 |
a/74431
sdotcip
$161 million in 14 master projects in current year (2023) capital resources that will not be used prior to ...
0.00163034175 |
a/147702
sdotcip_000
walk zones. The remaining funding is eligible for use anywhere in Seattle. 266Seattle Department of Transportation ...
0.0016302322 |
a/63153
adoptedufcmeetingnotes070820
Construction Permit Site Photos 60 MB 11/14/16 3026408-LU Master Use ...
0.00163018133 |
a/119040
uwannualreport2008
in this July 2005 report. Approximately 342 of these units were reported to UW in prior reports. Table 3 shows the date of application for ...
0.00163016445 |
a/77870
261planningdevelopment
); Stormwater Code; and Rental Housing and Registration. DPD reviews land use and construction-related ...
0.00163014734 |
a/62008
261planningdevelopment_000
(SEPA); Stormwater Code; and Rental Housing and Registration. DPD reviews land use and construction-related ...
0.00163014734 |
a/62009
existingconditionsreportrdhct_appendices
of a complete streets ordinance that directs the City to build transportation projects that support and encourage walking, bicycling, and ...
0.00163013092 |
a/106317
sdot_birt_report_appendices_110220_d
or Document Transit Expansion Sound Transit West Seattle and Ballard Link Extensions (2019) METRO CONNECTS (2017) Seattle Transit ...
0.00163010519 |
a/103979
sepa checklist - mha dtslu implementation final
zones to determine which project is first. Currently, this decision is generally based on which project receives a Master ...
0.00163008738 |
a/65082