Filter Results

1101 to 1125 of 1611
seattledesigncommission-2003.01.16jointtrainingfacilityminutes
that currently housing is not permitted, but they are hoping to create a pattern that can respond to a number of different ...
0.00155474909 |
a/85308
seattledesigncommission-2005.03.17burkegilmantrailextensionminute ...
design guidelines to be used during the permitting process. Applicants are required to demonstrate ...
0.00155474909 |
a/85356
4186-preliminaryreport11102017
to be heard by the Seattle Design Commission during the Master Use Permit (MUP) process ...
0.00155466981 |
a/59345
sbab_oct2015meetingminutes-final
Levy  Campaign:  Nicole  Freedman  advised  the  SBAB  that  City  staff  and  board  members  are  not ...
0.00155459659 |
a/107100
sbab_oct2015meetingminutes-final
Levy  Campaign:  Nicole  Freedman  advised  the  SBAB  that  City  staff  and  board  members  are  not ...
0.00155459659 |
a/107196
tableofcontentsordinance123495readingaid
of structures (in Northgate Overlay District) Amend to change names of LR zones 172 75 23.76.004 Land use decision ...
0.00155450846 |
a/88032
sdot_06-11
the traffic signal as a condition of its Master Use Permit. The project supports the ...
0.00155450846 |
a/60972
2021-04-10.cemp.annexiv.evacuation.sop
of evacuation. Provide maps or diagrams to the media. • Provide a clear message to the public. Utilize the Mayor and/or ...
0.00155442429 |
a/57062
11jan27_jigglescomplaint
is attached to this complaint. Failure to obtain a Master Use Permit Violation 4.10 SMC ...
0.00155439321 |
a/50415
isrd011023_hr_701
historic district. It contains two buildings – a 1927 service garage and a relocated 1946 gas station. The property is currently ...
0.00155433989 |
a/137240
701_historic_report
historic district. It contains two buildings – a 1927 service garage and a relocated 1946 gas station. The property is currently ...
0.00155433989 |
a/73307
2023_0510_beacon-15thave_faq
if this work will be done in the interim project this summer, or with the larger capital project next summer. 2. We live in Rainier Beach ...
0.00155433628 |
a/144322
scc_sac_draftmimpcommentsfinal
4. When a Master Use Permit (MUP) application impacting a structure or place that is 50 ...
0.00155433267 |
a/77043
seattledesigncommission-2005.07.21seattlecentergarageminutes
, and the master use permit process. The proponents thank the Commission for their ...
0.00155433267 |
a/85364
spr
event facilities, Amy Yee Tennis Center (AYTC), athletic fields, and for revocable use permits. Through ...
0.00155422941 |
a/160719
streetvacationfaq
, request additional time. The City Council will determine whether an extension of time is appropriate. May I apply for a ...
0.00155415549 |
a/104873
seattleindustrialfeisch3.3
by the US Army Corps of Engineers (USACE), provides for permitting of any work in, over, or under ...
0.00155415421 |
a/134525
spu
toilets) and the Automatic Public Toilets program. Provide funds for payment to the Department of Design, Construction and Land ...
0.00155407377 |
a/60515
transportation
Street and 103rd Street. Northgate South Lot developer, Lorig Associates, is expected to fund approximately one third of the cost to ...
0.001554025 |
a/60924
11-03-11
was given to repairs that directly impacted safety and recreational opportunities. Crews were provided color maps and ...
0.00155401451 |
a/92112
q4_2022_sbp_report
unsheltered populations including trash, sharps, (i.e., used needle collection) and recreational vehicle servicesAnnual ...
0.00155398727 |
a/139635
2015-oisgrantapp-gograntsfinal
of the geographic boundaries of your neighborhood business district and the area in which your work will focus.(Maximum characters allowed ...
0.00155397633 |
a/56461
sdot_projects
to install the traffic signal as a condition of its Master Use Permit. The project ...
0.001553931 |
a/61205
transportation_projects
of the cost to install the traffic signal as a condition of its Master Use Permit. The ...
0.001553931 |
a/61165
seattledesigncommission-2004.12.16firestation10minutes
); 15 January 2004, 6 June 2000 (Pre-Design: Ballard Civic Center Master Plan); 7 October 1999 (Briefing) Presenters: ...
0.001553931 |
a/85351