Filter Results

3476 to 3500 of 9618
sli
, and successful completion of probation, as well as early release from probation. The audit should also identify gaps in the collection, ...
0.002176512 |
a/63324
051413_loc
and Approve Minutes from April 9, 2013 Council Member Tim Burgess Review Agenda Holly Miller Mid-Year Report Data Team ...
0.002176512 |
a/78996
fortlawton_scoping_report
advantage of the opportunity to increase recreational and open space. Specifically, the City envisions a mix of affordable ...
0.002176512 |
a/151015
2020_2024_pmp_implemplan_v8_main_report_opt
and reinforces our need to continue building dedicated pedestrian spaces and crossings prioritized based on safety data. ...
0.002176512 |
a/103806
seattledesigncommission-2015.02.19dennysubstationminutes
retained. It also allows for the creation an open space along Minor Ave N. The project includes an elevated interpretive ...
0.002176512 |
a/85773
2020_2024_pmp_implemplan_v3_main_reportopt
building dedicated pedestrian spaces and crossings prioritized based on safety data. To more quickly complete the sidewalk ...
0.002176512 |
a/103876
2020_2024_pmp_implemplan_v3_main_report_opt[2][3]
to continue building dedicated pedestrian spaces and crossings prioritized based on safety data. To more quickly complete ...
0.002176512 |
a/103684
2021swmanualvol2constructionstormwatercontrolclean
, or after they are no longer needed—whichever is later. 16 Minimize Open Trenches Required BMP: In the construction of ...
0.002176512 |
a/96985
130145th_planforpublicreview
walking and biking connections.For more than a year, we have used traditional and innovative means to engage with you on this work. Our 2019 ...
0.002176512 |
a/87251
urbandesigncontextanalysis
side street. to the northwest on Yale Place E are 3-story commercial structures (Hart crowser ➏, Wci voice and data ...
0.002176512 |
a/96374
finalstormwatermanualvolume2
final site stabilization is achieved, or after they are no longer needed—whichever is later. 16 Minimize Open Trenches ...
0.002176512 |
a/96547
presentation_uw dssg_7.25.19
the permitting process?Where should support or interventions focus? ►What areas are most viable for financing support? ►Where are ADUs most ...
0.002176512 |
a/108136
lpbcurrentnom_117 n yale rodgers tile
of the building from this period, it is unknown to what extent the drawings match what was actually constructed. The drawings appear to show ...
0.002176512 |
a/74398
neighborhoods - participatory budget
, by building relationships with these communities and organizations through this process, the intent is to develop partnerships to better ...
0.002176512 |
a/148924
2008summaryofsurveyresults
and sewer rates. A complete set of this data by wholesale customer and by year is of critical importance in Seattle Public ...
0.002176512 |
a/110575
2015residentialrecyclingstreamcompositionstudy
Step 1: Develop Sampling Plan 5 Step 2: Schedule and Collect Recycling Samples 5 Step 3: Capture and Sort Samples 5 Step 4: Analyze ...
0.002176512 |
a/112689
scc_sac_draftmimpcommentsfinal
. 8. The committee is open to further discussion with the college about the addition of a building at the corner of ...
0.00217636279 |
a/77043
2008_arts_culture_recreation
components: an increase of $88,000 related to operations of expanded and remodeled libraries opened in 2007, an increase ...
0.00217636279 |
a/61366
2008_proposed_title_page_ada
components: an increase of $88,000 related to operations of expanded and remodeled libraries opened in 2007, an increase ...
0.00217636279 |
a/61382
suffolk_county_tech_asst
the previous year, broken down by race, religion, ethnicity, sexual orientation, disability, and “non bias.” However, it does not appear ...
0.00217636279 |
a/53131
suffolk county_tech_asst
the previous year, broken down by race, religion, ethnicity, sexual orientation, disability, and “non bias.” However, it does not appear ...
0.00217636279 |
a/53129
24.12.09 cre notes final anonymous
: Compliance with private building portfolios 10 mins Review: Custom decarbonization plans 5 mins Open discussion 25 mins ...
0.00217636279 |
a/163975
oneseattleplanengagementhubopenendedsummary
oneseattleplanengagementhubopenendedsummary What We’re Hearing: Summary Analysis of Engagement Hub Comments and Open-Ended ...
0.00217636279 |
a/132296
06.20.19 minutes_lgbtqc
(HSD), Andrea, Anne Marie Welcome and Introductions Public Open Comment 1. Andrea: Not real support for intersex rights ...
0.00217636279 |
a/72009
05-10_scl_adopted_project_detail_ final
are appropriated in the budget at the Budget Control Level. Amounts in thousands of dollars.2005-2010 Adopted Capital Improvement ...
0.00217636279 |
a/60790