Filter Results

2251 to 2275 of 2766
fascap
construction work includes, but is not limited to, demolition, complete construction of the interior finishes, including ...
0.00214489433 |
a/62904
administration
) weatherization program, and exterior repairs;SMT elevator controls study;SMT 14 demolition and structural repairs;Roof ...
0.00214489433 |
a/62370
spr_2429adoptedcip
Remediation. • Changes to the Carkeek Bridge project budget reflect the actual project timeline given long timelines for BNSF and shoreline ...
0.00214489433 |
a/153296
dadu_submission116
ON CONSTRUCTION OF PERMIT #6588433-CN IN SUMMER -EARLY FALL OF 2019 WHICH RESULTED IN A CONSTRUCTION COST OF ABOUT $135K. ...
0.00214489433 |
a/86911
seacap2006plan
accelerates the process, it is not a new source of CO2.The City’s role in this project is limited to permit review and ...
0.00214489433 |
a/88486
seattle consumption based emissions inventory 2019
and encourage reuse of these same materials, Seattle requires building salvage assessments for all demolition projects and ...
0.00214489433 |
a/138290
2016_1129 cai hala economic analysis summary memorandum
. In this analysis, demolition costs are not considered. Demolition costs would come out of the residual ...
0.00214489433 |
a/64921
sprcip
and permitting are likely required and which the trail maintenance crew or volunteers are not able to address. Amy Yee ...
0.00214489433 |
a/134215
fascap
, but is not limited to, demolition, complete construction of the interior finishes, including electrical, cabling, HVAC ...
0.00214489433 |
a/62887
columbia-city-hillman-city-plan
options for propertyowners and developers. The NC/R zone encourages residentialuses while still permitting a great variety ...
0.00214489433 |
a/78395
parks
creosote treated wooden piles. An additional benefit is that SPR and the Office of the Waterfront and Civic Projects are working with ...
0.00214489433 |
a/63564
11pumpstationsfinalredacted
. Common modifications that affect the capacity of the existing structure are new openings in the walls or top slab or ...
0.00214489433 |
a/113595
phase1summaryofchangestoproposedamendments
. Original proposal. The draft proposal was to limit the size of a lot permitted for new development to a maximum of ...
0.00214489433 |
a/87321
mo arena at seattle center mou ord
; 22 Anthony Auriemma MO Arena at Seattle Center MOU ORD D2 Template last revised December 1, 2016 4 C. Provide for design, ...
0.00214489433 |
a/56248
harvardbelmont-guidelines
Board, is requiredprior to the issuance of any city building, demolition, street use, or other permits for ...
0.00214489433 |
a/72898
annualreportjuly2013june 2014
Music Building; and 3) augmentation of the building demolition list to include the Crawford Music Building. On June 15, ...
0.00214489433 |
a/77158
annualreportjuly2014june2015
Music Building; and 3) augmentation of the building demolition list to include the Crawford Music Building. On June 15, ...
0.00214489433 |
a/77159
tmpreportjuly2015june2015
Building; and 3) augmentation of the building demolition list to include the Crawford Music Building. On June 15, 2011 the ...
0.00214489433 |
a/77244
overview
Center Master Plan in May 1999. The Planconsists of the following: demolition of the existing Municipal and Public Safety ...
0.00214489433 |
a/60370
context-neighborhood-commercial-properties
(Attachment C) was completed. This form included contextual information,building description and building history based on ...
0.00214489433 |
a/74340
feisscoping-2013-07-01
runoff (quality, quantity) • Noise (short term impacts from site preparation, demolition and construction activity) • ...
0.00214489433 |
a/77393
draft plan housing element
and economic needs of the surrounding neighborhood.  H5.11 Require advance notice to tenants and payment of relocation assistance to extreme ...
0.00214489433 |
a/87413
dr-annie-russell-house-designation
No permit records have been located, but several alterations have been made over the years. • In the 1970s a small ...
0.00214489433 |
a/76353
desrptdrannierussellhouse
reportedly used to sneak many of Dr. Russell’s patients into the house. Just north of the staircase is a large storage room. The final ...
0.00214489433 |
a/75977
solid-waste-moodys-2015
issued nearly $170 million of its $200 million of total debt within the last five years. Theseborrowings have financed the ...
0.00214489433 |
a/107433