Filter Results

2251 to 2275 of 2668
masterplanannualreport-2013
Building; and 3) augmentation of the building demolition list to include the Crawford Music Building. On June 15, 2011 the ...
0.002092428 |
a/77174
spcparkingrecommendations_3feb2010
to prohibit: demolition of buildings for use as parking lots; parking as an interim use on sites where buildings have ...
0.002092428 |
a/109269
idminutes2-14-17
was required. A Certificate of Approval for Demolition, Use and Preliminary Design was issued on January 24, 2017. ...
0.002092428 |
a/73116
pspb1-6-21
of three new RapidRide Stations on Alaskan Way. Prior to Alaskan Way Viaduct Demolition, Metro routes serving West Seattle ...
0.002092428 |
a/73821
introduction
Seattle to Capitol Hill and the University of Washington. SDOT is managing the City’s design review and permitting process ...
0.002092428 |
a/61700
lpbminutes_6-26-24
no concerns and that there were no negative impacts. Action: I move that the Seattle Landmarks Preservation Board retroactively approve the ...
0.002092428 |
a/163997
spucap2
:  Regulatory Mandates, Legal Agreements: The degree to which the project is driven by federal, state, and local laws, ...
0.002092428 |
a/62386
2021sfctableofcontents
and Powers of the Fire Code Official. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ...
0.002092428 |
a/162466
3037700-sd decision
in the electronic file at http://www.seattle.gov/SDCI/. Previous SEPA Related Actions Prior to application for a Public School Departure ...
0.002092428 |
a/129378
transportation
to the replacement of State Route 99 along the Seattle waterfront. The program includes the City's involvement in the viaduct ...
0.002092428 |
a/61982
seattledesigncommission-2011.04.14alaskanwayviaductandseawallminu ...
regarding working with the Army Corps of Engineers specifically regarding costs and habitat restoration. A: The advantage of working with ...
0.002092428 |
a/85616
lpb101624websterschoolagmt
. n. Installation or removal of artwork located at designated areas of the building interior, when fastened to gypsum wallboard surfaces. o. ...
0.002092428 |
a/161391
adopted061318meetingsummary
-family house since 1994 and in backyard since 2010. - Less than 2% of Seattle’s 135,000 single-family lots have an ADU. - Since their ...
0.002092428 |
a/118822
lpb3-3-21
030321.31 Gas Works Park 1901 N Northlake Way Proposed site improvements, and proposed demolition and replacement ...
0.002092428 |
a/74659
lpbminutes_4-20-22
there is no permit on record and it may have been built in the 1930s. Ms. Doherty said the photo link and letter from the ...
0.002092428 |
a/131136
general_government
); demolition of the Municipal Building and Public Safety Building; acquisition of the SeaPark Garage; development of open ...
0.002092428 |
a/60904
seattledesigncommission-2003.01.16jointtrainingfacilityminutes
that currently housing is not permitted, but they are hoping to create a pattern that can respond to a number of different ...
0.002092428 |
a/85308
orientation
of an amendment; and4.Provide comments on any project developed under the provisions of the adopted plan that requires a Master Use ...
0.002092428 |
a/76748
parks_detail
, leaving foundations and other structuresfor the City to remove. The City's demolition work and additional restoration ...
0.002092428 |
a/61519
seattledesigncommission-2002.11.21montlakelibraryminutes
negotiating with SDOT, but is almost through this process. They will be ready to start demolition of a nearby building and ...
0.002092428 |
a/85305
general_government
improvements at Seattle Municipal Tower; tenant improvements at Airport Way Center (formerly Park 90/5); demolition of the ...
0.002092428 |
a/61256
seattledesigncommission2008.01.17firestation30minutes
with this and this project will enhavalue of his work. 3rd and Thomas are • Uptown Alliance: demolition of the ...
0.002092428 |
a/85804
seattledesigncommission-2008.01.17thomasstreetpedestrianbridgemin ...
Heizer is fine with this and this project will enhavalue of his work. 3rd and Thomas are • Uptown Alliance: demolition of ...
0.002092428 |
a/85416
parks_projects
. The City's demolition work and additional restoration work will be done under a separate project (K731242 -- Discovery ...
0.002092428 |
a/61455
lpb1-20-21
and this site is unique. He said the board denied designation in 2014. He said the new project has been designed and ...
0.002092428 |
a/74622