Filter Results

2201 to 2225 of 6420
sdot
permits, maintaining trees, and planning and engineering transportation. The six BCLs in this area are: Bridges and ...
0.00216442556 |
a/63060
pspb081022glsection2
buildings, windows at street level shall permit visibility into the business, and visibility shall not be obscured by ...
0.00216442556 |
a/132194
110_preliminaryreport
requirements for institutional uses in LR3 zones are met; In cases where development requirements could not be met, there is the possibility ...
0.00216442556 |
a/59073
sdot
, repairing potholes, issuing permits, maintaining trees, and planning and engineering transportation. The six BCLs in this ...
0.00216442556 |
a/62983
sepachecklistdelridgends101514
Report For 30% Street Improvement Permit (SIP) Submittal, Delridge Natural Drainage Systems, Seattle, Washington. CM ...
0.00216442556 |
a/115445
annualreport2017
(DPD) approved Children’s Master Use Permit (MUP) for Phase 1 of the Project on the western portion of its expanded campus. ...
0.00216442556 |
a/77074
nem
quickly, efficiently, and sustainably, and using app-based systems to make smarter decisions about travel. As one of the first cities to ...
0.00216442556 |
a/158032
02_008450
are controlled and issued from the Operations Control Center in Seattle, but permits are issued by staff within the ...
0.00216442556 |
a/109498
playground equipment options
-LevelActivitiesAccessibleGround-LevelPlay TypesRequiredProvidedADA SCHEDULE959636342-5 ADA5-12 ADALITTLE BROOK PARKColor Option : ...
0.00216442556 |
a/153865
oct25meetingminutes
the building permit for arena excavation and is waiting for the structural permit application, which will ...
0.00216438016 |
a/109052
lb-directors-report
, the Department of Planning and Development (DPD) led a process to evaluate and propose revisions to the Living Building ...
0.00216438016 |
a/53446
spu_water_projects
systems. SCADA measurement data will be used to assist in capacity planning, validating repairs, identifying blockages, assessing DPD ...
0.00216438016 |
a/61158
spu_water_projects
and maintenance information management systems. SCADA measurement data will be used to assist in capacity planning, validating repairs, ...
0.00216438016 |
a/61231
revenueoverviewfromintroduction
governmenue is projectUtil$174Gov'tGrantsTraffic Fines,  $29.9M ,3%2011 A5. Total CitRevenueeneral Subfunis the propertd sales taxes. ...
0.00216438016 |
a/61870
coskcfor-hirerulespackage2forrelease_finaljul24
as defined in Revised Code of Washington (RCW) 46.04.382 and conform to the following standards: 1. Must have seating ...
0.00216438016 |
a/158783
sclcap_000
improves operational efficiencies for scheduling of crews, provides rapid revision of crew schedules during emergencies, ...
0.00216438016 |
a/62353
sclcap
) This project provides mobile communication and computing equipment for City Light field workers. The project improves operational ...
0.00216438016 |
a/62544
1.seattlecitylight
, and improving system reliability. The schedule has been revised, and a portion ofthe contracts will now be encumbered in ...
0.00216438016 |
a/62365
sclcap
system reliability. The schedule has been revised, and a portion ofthe contracts will now be encumbered in 2015 and ...
0.00216438016 |
a/62380
sclcap
projects; and provide capital improvements in response to other customer-requested service needs. Allocation changes reflect ...
0.00216438016 |
a/62706
sclcap
and permits SCL to meet safety and health code requirements. • Workplace and Process Improvement (MC-CL-XF9159): $2,127,000 ...
0.00216438016 |
a/63081
sclcap
generation andtransmission assets, buy and sell energy in shorter-term increments, and use pricing to match loadsand resources across more ...
0.00216438016 |
a/62890
sclcip_000
capitalizes on emergent opportunities to make improvements to City Light's buildings and facilities. The project protects employees and ...
0.00216438016 |
a/63149
compiled_mha_feis_appendices_2017
the following pages, an MHA proposed zoning map for each urban village shows the Draft 1 map and describes how we revised ...
0.00216438016 |
a/65068
11-10-11
, owners; and key external stakeholders • Post the Plan on Seattle Parks’ website • Park Board Review, public hearing, and recommendation to ...
0.00216438016 |
a/92113