Filter Results

2151 to 2175 of 2727
louisa boren k-8 don recommendations final_comments
23.55.020.B. The project calls for the demolition of an existing pole mounted sign and construction of a new ground mounted ...
0.00214708922 |
a/133194
ose-bldg-performance-standards-dnsv5-june2023
or existing building. The proposal does not include any provisions that would create incompatibilities between adjacent uses or lead to the ...
0.00214708922 |
a/143301
readersguideoverview
of Seattle must abide by the City's two National Pollutant Discharge Elimination System (NPDES) permits, one for storm ...
0.00214708922 |
a/62720
uwannualreport2014
. TABLE 4 Amended Development Capacity by Campus Area Campus Area % of Total Campus Development Capacity in Campus Area ...
0.00214708922 |
a/77873
culture_and_recreation
and Roof Repair K732224 532 1,460 0 0 2,425 68 0 0 365Langston Hughes Performing Arts Center - Renovation K732314 200 0 0 0 200 0 0 0 ...
0.00214708922 |
a/61620
culture_and_recreation
and Pier Renovation, Building 30 Sprinkler System, Building 18 demolition, North Shore, Pier and Log Boom, Picnic Shelter ...
0.00214708922 |
a/61431
introduction
System (NPDES) permits, one for storm water and one for combined sewer system. The City is required, for example, to invest ...
0.00214708922 |
a/62705
0.readersguideandoverview
Programs to meet federal and state regulatory requirements. The City of Seattle must abide by the City's two National Pollutant Discharge ...
0.00214708922 |
a/62535
policylinkseattleequityimplementationofcompplan.finalmemo.12.22.2 ...
income people and communities of color. 13 o LU2 should include goals that encourage growth of middle-income jobs by expanding the types ...
0.00214708922 |
a/87064
policylinkseattleequityimplementationofcompplan.finalmemo.12.22.2 ...
income people and communities of color. 13 o LU2 should include goals that encourage growth of middle-income jobs by expanding the types ...
0.00214708922 |
a/87624
adueispresentation
)0500100015002000250005010015020025030019941995199619971998199920002001200220032004200520062007200820092010201120122013201420152016Annual ...
0.00214708922 |
a/108293
constpermitcklistsfaddalt
constpermitcklistsfaddalt 700 Fifth Avenue, Suite 2000 | PO Box 34019 | Seattle, WA 98124-4019 | 206-684-8600 | seattle.gov/sdci ...
0.00214708922 |
a/97917
overview_2530proposedcip
Elimination System (NPDES) permits, one for storm water and one for combined sewer system. The City is required, for ...
0.00214708922 |
a/160788
ediimpplan042916final
– equitably distribute burdens and benefits of rising housing costs and demolition, redevelopment, and conversion of ...
0.00214708922 |
a/87044
ediimpplan042916final
– equitably distribute burdens and benefits of rising housing costs and demolition, redevelopment, and conversion of ...
0.00214708922 |
a/87575
neighborhoodplanningelement2015replacementpages
features. Incentives. Provisions for allowing floor area above the base should not create incentives for the demolition of ...
0.00214708922 |
a/87609
teche
to minimize the construction duration at any given location. Construction of any of the Build Alternatives would consist of the following ...
0.00214708922 |
a/100525
executivesummary(0)
moving on to the next segment to minimize the construction duration at any given location. Construction of any of the Build Alternatives ...
0.00214708922 |
a/100506
spcgsdigital01062020
consequences as well. We continue to see stark racial inequities in homeownership, employment, and health outcomes throughout the city.4 ...
0.00214708922 |
a/108091
spc growth strategy white paper 1072020(0)
, there are negative consequences as well. We continue to see stark racial inequities in homeownership, employment, and health outcomes ...
0.00214708922 |
a/108073
spcgrowthstrategyfinal1072020
, there are negative consequences as well. We continue to see stark racial inequities in homeownership, employment, and health outcomes ...
0.00214708922 |
a/108090
spc growth strategy white paper 1072020
, there are negative consequences as well. We continue to see stark racial inequities in homeownership, employment, and health outcomes ...
0.00214708922 |
a/108074
techb
on to the next segment to minimize the construction duration at any given location. Construction of any of the Build Alternatives would ...
0.00214708922 |
a/100522
metropole
of the Metropole building is an important opportunity to preserve, restore, and return to use this significant historic building which is ...
0.00214708922 |
a/74174
2012sebcintro
failures have resulted during the ini-tial stages of grading, excavation and demolition. During these early stages, poorly ...
0.00214708922 |
a/97125