Filter Results

2026 to 2050 of 4097
lpbminutes_2-2-22
the “gate house” at the beginning of the loop is inserted into plans and doesn’t reference the site; she suggested it be ...
0.00221229368 |
a/131134
lhes sdci decision-recommendation
Architectural Review Committee. According to the District the landmark designation limits the District’s choices to provide ...
0.00221229368 |
a/76820
idminutes3-28-17
installation of a split air conditioning system to be installed on top of the canopy above the storefront. Exhibits included ...
0.00221229368 |
a/73126
seattledesigncommission-2006.07.06presbyterianretirementhousingal ...
Hoffman Karen Kiest Anindita Mitra Sheri Olson Nic Rossouw Dennis Ryan Darrell Vange Guillermo Romano Executive Director Layne Cubell, ...
0.00221229368 |
a/85385
copyofseattledesigncommission-2015.08.06cedarfallsminutes
) is developing a master plan for it’s Cedar Falls Watershed Headquarters located in North Bend, WA. The project consists ...
0.00221229368 |
a/85138
itdcip
is $107.7 million. Details for 2022 are provided in the following table. CIP Program Name 2022 Proposed Planned Spending ...
0.00221229368 |
a/132994
opcdpreapproveddadusurveysummary
opcdpreapproveddadusurveysummary 1Pre-approved Plans for Accessory Dwelling Units Survey ResultsIn July 2019, the City of ...
0.00221229368 |
a/86965
may9-2013approvedminutes
disclosed that her firm, SvR Design, works on projects that could be impacted. ‐ Commissioner Matt Roewe disclosed that his firm, Via 
0.00221228227 |
a/108989
rainierbeachinnovationdistrictreport
Architecture,  under  contract  with  DPD,  has  worked  with  these  partners  to  develop ...
0.00221228227 |
a/87369
pspbminutes_7-17-24
architectural details. They discussed that the artwork should align with the other architectural features ...
0.00221228227 |
a/163987
constpermitcklisttenantimprovecomm
surface.SCREENING & SUBMITTAL CHECKLIST Commercial Tenant Improvement Additions & Alterations ARCHITECTURAL ...
0.00221228227 |
a/97920
greenhomeguide-salvage
. With careful planning, you can create a home that combines beauty, efficiency, comfort and convenience with health and ...
0.00221228227 |
a/88409
maplewoodplayfielddns-signed
(June 15, 2023). Written comments must be submitted by ____June 29, 2023______. Responsible official: Mike Schwindeller Position/title: ...
0.00221228227 |
a/143667
commercialandselfhaulwastestreamscompositionstudy2012
. Please see Appendix B for a detailed description of the methodology. Step 1: Develop Sampling Plan  A total 270 ...
0.00221228227 |
a/112789
december2024ctabminutes
Maritza Rivera will be leading the committee on that. She chairs the Department of Neighborhoods, and DEAL, the Department of Early ...
0.00221228227 |
a/164245
culturalresourceselement
they are located. ASeattle’s Comprehensive Plan | Toward a Sustainable Seattle January | 200510.5 cultural resource ...
0.00221222336 |
a/87552
seattledesigncommission-2013.10.03northtransferstationminutes
seattledesigncommission-2013.10.03northtransferstationminutes APPROVED MINUTES OF THE MEETING Mike McGinn Mayor Diane Sugimura ...
0.00221222336 |
a/85749
sixth-church-christ-designation
: D. It embodies the distinctive visible characteristics of an architectural style, period, or of a method of ...
0.00221222336 |
a/76545
desrptsixthchurchofchristformer
: D. It embodies the distinctive visible characteristics of an architectural style, period, or of a method of ...
0.00221222336 |
a/76261
fn2-12-20 maple wood meeting notes
Architecture: Phoebe Bogert, Katherine Goodrich, Tori Halligan Project Maple Wood Playfield and Play Area Renovation: ...
0.00221222336 |
a/93390
lpbminutes3-20-19
the historic doors below. She said they looked at a switchback stair plan, but it would block the doors, and a donut stair ...
0.00221222336 |
a/75020
march222012approvedminutes
Vote Chair Miller called for any disclosures and recusals. Disclosures: - Commissioner Matt Roewe disclosed that his firm, VIA ...
0.00221222336 |
a/108912
pspb081022glsectionhistoryintro
, quoted in Link, 2005. MAKERS architecture and urban design Page 5 P Sq History - 5/14/21 Planning ...
0.00221222336 |
a/132190
2016 seattle it annual report (read only)
will allow for more efficient usage and will create capacity to invest in other services not currently available, such as ...
0.00221222336 |
a/107666
pres_brief_17
pres_brief_17 PRESERVATION BRIEFS 17 Close-up of stone wall, showing craftsmanship. Photo: NPS files. Architectural ...
0.00221222336 |
a/74190