You just searched for:
Search
Filter Results
176 to 200 of 1915
seattle-sewer-pos-2014
https://www.seattle.gov/documents/departments/seattlegovportals/business/in ...
and “forward-looking statements.” No assurance can be given that the future results shown herein will be achieved, and ...
0.002230049 |
a/107403
seattle-sewer-pos-2014
https://www.seattle.gov/documents/departments/investorrelations/delete/seat ...
and “forward-looking statements.” No assurance can be given that the future results shown herein will be achieved, and ...
0.002230049 |
a/58550
basin 69 engineering report 12.20.2019_final signed
https://www.seattle.gov/documents/departments/spu/documents/projects/vineba ...
ProjectPage ixEngineering ReportDecember 2019Seattle Public UtilitiesTable 8-3 Transfer Alternatives Scoring ...
0.002229995 |
a/154324
c3_delivery_assessment_10312023
https://www.seattle.gov/documents/departments/sdot/streetcar/c3_delivery_as ...
..........................313.3.2 Schedule Projections by Scenario ..............................343.3.2.1 Design-Bid-Build ...
0.00222942838 |
a/151747
seattle-water-rev-2017-pos
https://www.seattle.gov/documents/departments/investorrelations/delete/2017 ...
in this Official Statement do not reflect historical facts, but rather are forecasts and “forward-looking statements.” No assurance can be ...
0.00222918554 |
a/58579
seattle-solid-waste-pos-2014
https://www.seattle.gov/documents/departments/seattlegovportals/business/in ...
-looking statements.” No assurance can be given that the future results shown herein will be achieved, and actual ...
0.00222899 |
a/107413
seattle-solid-waste-pos-2014
https://www.seattle.gov/documents/departments/investorrelations/delete/seat ...
-looking statements.” No assurance can be given that the future results shown herein will be achieved, and actual ...
0.00222899 |
a/58562
2007-2012_adopted_cip_book
https://www.seattle.gov/documents/departments/financedepartment/0712adopted ...
. Funds are appropriated in the Adopted 2006 Budget at the Budget Control Level. O&M Costs (Savings): Estimate of significant increases ...
0.002228279 |
a/61098
2019wadohwatersystemdesignmanual-4thedition331-123
https://www.seattle.gov/documents/departments/spu/engineering/2019wadohwate ...
to soliciting bids, the water system may have to solicit new bids or deal with significant change orders ...
0.00222744839 |
a/113670
5e2019wadohwatersystemdesignmanual
https://www.seattle.gov/documents/departments/spu/engineering/dsg/2024/5e20 ...
, the water system may have to solicit new bids or deal with significant change orders or contract amendments. If the ...
0.00222744839 |
a/154276
ccac_073014_appendices
https://www.seattle.gov/documents/departments/fas/purchasingandcontracting/ ...
, with a similar number oftotal hours in most years; and WHEREAS, the City of S~attle will continue major construction project ...
0.00222699321 |
a/58771
appendix_ccac_report_7-21-14
https://www.seattle.gov/documents/departments/fas/purchasingandcontracting/ ...
does not fit all. Another contractor noted that some contractors won’t bid on City jobs with targeted hiring policies or ...
0.00222699321 |
a/58713
2007-2012_proposed_cip_book
https://www.seattle.gov/documents/departments/financedepartment/0712propose ...
as a result of a capital project. ‘N/C’ denotes that operations and maintenance costs are not calculated. Spending Plan: ...
0.00222677621 |
a/61167
oneseattleplanfinaleisappendices2025
https://www.seattle.gov/documents/departments/opcd/seattleplan/oneseattlepl ...
environment in general. Washington State Hydraulic Code WAC 220-660 Minimize project-specific and cumulative impacts to fish life as a ...
0.00222595432 |
a/165058
oneseattleplanfeis-chapter6-appendices
https://www.seattle.gov/documents/departments/opcd/seattleplan/feis2025/one ...
environment in general. Washington State Hydraulic Code WAC 220-660 Minimize project-specific and cumulative impacts to fish life as a ...
0.00222595432 |
a/165728
2025-2030 adopted cip
https://www.seattle.gov/documents/departments/financedepartment/2530adopted ...
that a project be assigned a CIP ID number before spending may occur on a project. As a result, Stage 1 project cost ...
0.0022249585 |
a/166663
uw-culturalresourcesreport_finaldeliverable_august-2017
https://www.seattle.gov/documents/departments/neighborhoods/historicpreserv ...
The Artists ............................................................................................................................... ...
0.002224898 |
a/76616
2025-2030 proposed cip
https://www.seattle.gov/documents/departments/financedepartment/2530propose ...
. As a result, Stage 1 project cost estimates/budgets are “Rough Order of Magnitude” estimates based on previously ...
0.00222433847 |
a/160787
2007appendiceswatersystemplan
https://www.seattle.gov/documents/departments/spu/documents/archive/2007app ...
Reservoir: 1710’ Treatment/Transmission capacity: 120 MGD • Seattle Well Fields: 10 MGD withdrawn for 14 weeks as needed from ...
0.002224238 |
a/112544
2008-2013_adopted_cip_book
https://www.seattle.gov/documents/departments/financedepartment/0813adopted ...
Costs (Savings): Estimate of significant increases or decreases in operations and maintenance costs as a result of a ...
0.00222242018 |
a/61236
seattle-city-light-2016a-and-b-os
https://www.seattle.gov/documents/departments/seattlegovportals/business/in ...
contained in this Official Statement do not reflect historical facts, but rather are forecasts and “forward-looking statements.” No ...
0.00222203252 |
a/107377
seattle-city-light-2016a-and-b-os
https://www.seattle.gov/documents/departments/investorrelations/delete/seat ...
contained in this Official Statement do not reflect historical facts, but rather are forecasts and “forward-looking statements.” No ...
0.00222203252 |
a/58500
2008-2013_proposed_cip_book
https://www.seattle.gov/documents/departments/financedepartment/0813propose ...
at the Budget Control Level. O&M Costs (Savings): Estimate of significant increases or decreases in operations and maintenance costs as a ...
0.002221719 |
a/61292
4-5_commentsa-f_marked_mha_feis_2017
https://www.seattle.gov/documents/departments/hala/policy/mha_feis/4-5_comm ...
, impacts tohistoric and cultural resources in the City will result from future development. Stating otherwise would ...
0.00222142646 |
a/65046
dww200stormwatermanual
https://www.seattle.gov/documents/departments/spu/services/drainagesewer/dw ...
combined sewer, or public sanitary sewer in the public right-of-way shall comply with Section 22.805.060 (Minimum Requirements for Roadway ...
0.002220853 |
a/111214