Filter Results

1951 to 1975 of 4261
appendix_000
)This project adds a building to house landscape crew staff and volunteers for the ongoing care of Magnuson Park.7636500 Sand Point WAY ...
0.00220021512 |
a/61900
appendix
)This project adds a building to house landscape crew staff and volunteers for the ongoing care of Magnuson Park.7636500 Sand Point WAY ...
0.00220021512 |
a/61916
utilities_and_transportation
to the International District/Chinatown Station and Capitol Hill Station at Broadway and John Street. ...
0.00220021512 |
a/61785
utilities_and_transportation
Station and Capitol Hill Station at Broadway and John Street. Program Summary This budget is increased ...
0.00220021512 |
a/61755
appendices
. Operations and maintenance costs are not expected to change as a result of this project. The Capitol ...
0.00220021512 |
a/63394
light_projects
are not expected to change as a result of this project. The Capitol Hill Underground Ordinance area does ...
0.00220021512 |
a/61135
scl_projects
. Operations and maintenance costs are not expected to change as a result of this project. The Capitol ...
0.00220021512 |
a/61201
seattle_city_light
. Operations and maintenance costs are not expected to change as a result of this project. The Capitol ...
0.00220021512 |
a/61268
seattle_city_light
to change as a result of this project. The Capitol Hill Underground Ordinance area does not have capacity ...
0.00220021512 |
a/61326
sdot
system, including but not limited to the International District/Chinatown Station and Capitol Hill Station ...
0.00220021512 |
a/63060
transportation
various pedestrian improvements at Broadway and Roy streets on Capitol Hill. The improvements are made in ...
0.00220021512 |
a/60553
appendixa_2429adoptedcip
will become increasingly difficult and O&M will increase as the system continues to age. Operations and maintenance costs are not expected ...
0.00220021512 |
a/153299
transportation
FUNDS8031,093000001,89600O&M Costs (Savings)000000Type:Start Date:End Date:This project makes various pedestrian improvements at Broadway ...
0.00220021512 |
a/60572
appendix_cip
as the system continues to age. Operations and maintenance costs are not expected to change as a result of this project. The ...
0.00220021512 |
a/147698
seattle_public_utilities
quality treatment facilities for the Minor Avenue drainage basin, which includes much of First Hill and ...
0.00220021512 |
a/61140
generalgovernment
firefighters in the event of an earthquake and allows them to provide high-quality emergency services to the Capitol ...
0.00220021512 |
a/61801
sdotcip
District/Chinatown Station and the Capitol Hill Station (at Broadway and John Street). The system will ...
0.00220021512 |
a/63261
sdot
to the regional Link light rail system, including but not limited to the International District/Chinatown Station and ...
0.00220021512 |
a/62983
appendixcip
to change as a result of this project. The Capitol Hill Underground Ordinance area does not have capacity ...
0.00220021512 |
a/63410
pikepineexistingdesigncharacteristics
eastward‐rising slope. From Pine Street on Capitol Hill, there is a direct view downtown to the Paramount  ...
0.00220021512 |
a/87330
counciladopted2021amendments
Open Space00%By Urban Centers/Villages:Inside Urban Centers96,86243%Downtown33,51215%First Hill/Capitol ...
0.00220021512 |
a/87550
2019_freefloat_bikesharepermit_evaluation
locations but ended their trips in more dispersed areas� Like last year, bike share trip starts and ends were focused in north and central ...
0.00220021512 |
a/99924
mha-ord
6.25 145 7 200 8.252 Footnotes to Table A for 23.47A.013 1 Except that zones without a mandatory housing affordability suffix have a ...
0.00220021512 |
a/53418
190613_bmp_imp_plan_final
• Ballard Bridge • Connection between Capitol Hill and Beacon Hill through 12th Avenue • ...
0.00220021512 |
a/99151
isrd112222traffic1032sjackson_3
below. • SDOT’s First Hill Streetcar has the nearest stop to the project site located along S Jackson Street east of 12th ...
0.00220021512 |
a/136060