Filter Results

1951 to 1975 of 3745
seattle green economy vision & asset analysis
in terms of its concentration of software-related skills, fifth in terms of concentration in architecture and engineering ...
0.00216382649 |
a/162961
dadu_submission161
of Seattle’s pre-approved plans program, will provide homeowners with the simplest turn-key approach to developing an ADU. ...
0.00216382649 |
a/86956
itd
budget is $107.7 million. Details for 2022 are provided in the following table. CIP Program Name 2022 Proposed Planned ...
0.00216382649 |
a/63562
sepa checklist cso 40 41 43 165 outfalls cleaning project ...
. 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this ...
0.00216382649 |
a/131819
11pumpstationsfinalredacted
........................................................................................................... 11-19 11.4.1 Basis of Design ...
0.00216382649 |
a/113595
2018sfgcchapter1
and fire shutters.9.The first sheet of each set of plans and specifications shall show the address of the proposed work and ...
0.00216360018 |
a/97209
spcrecommendationsdec13
spcrecommendationsdec13 City of Seattle Seattle Planning Commission Department of Planning and ...
0.00216360018 |
a/108102
splcap
requirements that were not anticipated during the planning of the levy. As background, the reduction of $820,000 from the ...
0.00216360018 |
a/62546
splcap_000
and community needs or major maintenance requirements that were not anticipated during the planning of the levy. As ...
0.00216360018 |
a/62361
multifamilysepachecklist
of the Land Use Code. 2. Name of Applicant: City of Seattle 3. Address and phone number of applicant and contact person: Mike Podowski ...
0.00216360018 |
a/88004
february92012 _approvedminutes
; Andres Mantilla, OED; Dave LaClergue, Gary Johnson, DPD  IN ATTENDANCE Martha Lester, Rebecca Herzfeld, Council Central Staff; Donald King ...
0.00216360018 |
a/108601
mhcguidelinesjuly122023final
Major Structures and Architectural Elements .............................................................. 15 3.3 Energy ...
0.00216360018 |
a/150295
2011july28_approvedminutes
2011july28_approvedminutes City of Seattle Seattle Planning Commission Josh Brower, Chair Barbara Wilson, Executive ...
0.00216360018 |
a/108270
lpb10-5-16_minutes
. Mr. Luoma asked what type rock is planned for gabion. Ms. Russell said sandstone with maximum size at 6”. 4 Mr. ...
0.00216360018 |
a/74629
gwp_comfortstationfinal-sepa-checklist-signed
2021/227.Do you have any plans for future additions, expansion, or further activity related to or connected with this ...
0.00216360018 |
a/93154
9delectricaldesignchecklist
requirements; requirements for plan review; their preferred level of involvement. ☐ 2.2 Perform an electrical code review ...
0.00216360018 |
a/154296
fas
acquisition process for a new North Precinct facility for the Seattle Police Department. In addition, the architecture and ...
0.00216360018 |
a/62213
seattledesigncommission-2005.05.05safecoinsuranceskybridgeandstre ...
, Commission Coordinator Department of Planning and Development P. O. Box 34019 700 5th Avenue, 19th Floor Seattle, WA ...
0.00216360018 |
a/85359
seattledesigncommission-2003.04.17centercitywayfindingminutes
Use Teresa Platt, Seattle Dept. of Transportation Hadley Greene, EnviroIssues Sarah Brandt, EnviroIssues Peter Smith, HNTB Steve ...
0.00216360018 |
a/85313
dpr_93_120
studies with donors and sponsors to determine the scope and scale of the fundraising efforts. They will then develop and begin ...
0.00216360018 |
a/62099
urmoutreachpilotevaluationreportfinal
urmoutreachpilotevaluationreportfinal ...
0.00216360018 |
a/96924
dsrdesignreviewprogramimprovements
as one of the highest-impact recommendations: RP.1 Reform the Design Review program, which was included as a priority in both the Mayor’s ...
0.00216360018 |
a/118657
seattledesigncommission-2011.06.02udistrictstationminutes
seattledesigncommission-2011.06.02udistrictstationminutes Page 1 of 7 Seattle Light Rail Review Panel Julie Bassuk, Co-chair Design ...
0.00216360018 |
a/84927
2021smcchapter1
shutters. 9. The first sheet of each set of plans and specifications shall show the address of the proposed work and the ...
0.00216360018 |
a/162883
05-13-04_minutes
to the maritime and Scandinavian elements of the park. Project Intent The Pro Parks Levy provided $276,308 to plan, ...
0.00216360018 |
a/91958