Filter Results

1901 to 1925 of 6125
forecast council 2024-10-22 - october forecast
in the national labor market continue to move back to balance, thus easing price pressures. •With national housing market cooling as well, ...
0.00222433219 |
a/161755
general_fund_revenue_overview
. In 2017, the City issued building permits valued at a record $5.0 billion (see Figure 6). Figure 6. Value of Building ...
0.00222433219 |
a/63355
seattle industrial deis ch 3.2 2021_12
on Beacon Hill. Puget Sound Clean Air Agency The PSCAA has local authority for setting regulations and permitting of ...
0.00222433219 |
a/87151
generalfundrevenueoverview
. Initially construction was focused in new apartments and public construction, but over time activity has broadened to include more office ...
0.00222433219 |
a/63294
1-0summary121814
to height and density in the U District study area. Revisions to this summary section prepared since issuance of the Draft ...
0.00222433219 |
a/87750
sdottreessidewalksoperationsplan120814
implementation of the revised Street Tree Ordinance and the walkable zone (as defined in the Pedestrian Master Plan)8 | ...
0.00222433219 |
a/118299
cam2601
cam2601 PAVEMENT RESTORATION FOR UTILITY SERVICE CONNECTIONS | 1 2601CLIENT ASSISTANCE MEMOSEATTLE PERMITS - Part of a ...
0.00222432031 |
a/101634
submittalrequirementsforelectricalplanreview
; (7) electrical equipment repaired or installed in connection with an elevator, dumbwaiter, or similar conveyance when the equipment work ...
0.00222432031 |
a/98136
2012seattlefirechapter3
and maintenance of all structures and premises forprecautions against fire and the spread of fire and generalrequirements of fire ...
0.00222432031 |
a/97582
2017opa-1246ccs05-22-18
& Director’s Findings Named Employee #1 Allegation(s): Director’s Findings # 1 5.120 - Secondary Employment IV. Secondary Employment ...
0.00222432031 |
a/82151
monitoring_plan_year_3
and revising, where needed, what has worked and what has not worked. Following each review, the Monitor will file any ...
0.00222432031 |
a/52966
2020 mimp annual report final(0)
’s Major Institution Master Plan (MIMP) for its Hospital Expansion Project. On November 29, 2010, the Department of Planning and ...
0.00222432031 |
a/77069
2023sepachecklist
. None. 10. List any government approvals or permits that will be needed for your proposal, if known. Approval of the ...
0.00222432031 |
a/167710
seattlepublicutilities-drainageandwastewater
of wastewater force mains•87 City-owned and permitted Combined Sewer Overflow points•38 Combined Sewer Overflow control ...
0.00222432031 |
a/62356
spucap1
Pump Stations • 5.5 miles of wastewater force mains • 87 City-owned and permitted Combined Sewer Overflow points • 38 ...
0.00222432031 |
a/62385
culture_and_recreation
for this project to comply with new accounting procedures, therefore life to date and 2009 revised dollar amounts do not ...
0.00222432031 |
a/61620
seattledesigncommission-2009.02.19uwstationminutes
development? The design permitting process will probably be started at the end of 2009. The driveway between the two ...
0.00222432031 |
a/84937
seattledesigncommission-2009.02.19rosestreetwolcottavesvacationmi ...
frame known for its development? The design permitting process will probably be started at the end of 2009. The driveway ...
0.00222432031 |
a/85466
gl_intro
Code for the District. A Certificate of Approval is required before a project can be permitted. These guidelines are ...
0.00222432031 |
a/74146
cam2116
in this CAM.Seattle Department of Transportation700 Fifth Avenue, Suite 2300 | P.O. Box 34996Seattle, Washington 98124-4996 | (206) ...
0.00222432031 |
a/101604
prelimdraftmimp-2014-02-04
entitlement work is to permit institutional growth while mitigating its impact on surrounding neighborhoods. The MIMP ...
0.00222432031 |
a/77560
lpbcurrentnom_harvey_funeral_home
or demolition of the subject building described within this report will require a permit from DCI, the owner is providing ...
0.00222432031 |
a/74483
harveyfuneralhome_nomination_application
” for commercial projects over 4,000 square feet in area. As any proposed alterations or demolition of the subject building described within ...
0.00222432031 |
a/75280
2020 mimp annual report final
Major Institution Master Plan (MIMP) for its Hospital Expansion Project. On November 29, 2010, the Department of Planning and Development ...
0.00222432031 |
a/77070
mo major institutions and school program ord
mo major institutions and school program ord Jennifer Breeze MO Major Institutions and School Program ORD D1 Template last ...
0.00222426048 |
a/173778