Search Results
Results
1776 to 1800 of 1904
- cen Public Gathering Space Improve 1,260,734 305,000 529,000 Full Time Equivalents Total 0.96 0.96 0.96 Utility Infrstr MP and Repairs The ... 0.00182102923 | | a/63432
- cen Infrastructure Master Plan and Repairs Program is to provide for renovation, repair, replacement, and ... 0.00182102923 | | a/63498
- 20191204 nodo map for sbab Arena at Seattle Center2Department of TransportationBackground and Purpose•Oak View Group (OVG) is required to construct or contribute to ... 0.00182102923 | | a/99911
- 07282016_levy_oversight_ppt Department of Transportation Levy to Move Seattle Planned Accomplishments - Safe RoutesAnnual target has been met0Annual ... 0.00182102923 | | a/99501
- 2018sfcchapter2 hazardous materials. Pipes, piping systems, engines and engine fuel tanks are not considered to be containers. [S] CONTAINER ... 0.00182050175 | | a/97706
- 2018_0515_q1_financememo to School$2,977,000$11,171,533$701,9586%$800,000$806,419$623,84377%Ped Master Plan-School ... 0.00182050164 | | a/99516
- nickersonrechannelizationfaq eastbound and westbound. · Freight needs – Major Truck Street (5.2% of the traffic is trucks) · Bicycle needs – corridor ... 0.00181990548 | | a/99435
- map-of-impact-fee-eligible-projects_draft ImprovementsFauntleroy Way/California Transit Corridor21Figure 2. Proposed Projects The following projects are not mapped:•Bike ... 0.00181990548 | | a/138523
- spabnovembermeetingminutes to design, manage, and build ROW—inspired by NACTO and Boston Complete Streets Guide 2012 • 10 year update • Reflect Modal ... 0.001819815 | | a/107932
- 151209 - spab responsibilities and guidelines - rev dec 2015 . The Board shall assist City departments in the implementation of the Pedestrian Master Plan, Seattle ... 0.001819815 | | a/176651
- cucac u district waterfront priorities_draft feb2023 for the University District’s south waterfront area. Background As a part of a 2019 Campus Master Plan, ... 0.001819815 | | a/143293
- march1016agenda(0) letter 3:25 – 3:45 PM 2015/16 Comprehensive Plan Amendments 3:45 – 4:20 PM Kristian Kofoed, Office of ... 0.001819815 | | a/108886
- march1016agenda letter 3:25 – 3:45 PM 2015/16 Comprehensive Plan Amendments 3:45 – 4:20 PM Kristian Kofoed, Office of ... 0.001819815 | | a/108887
- sfab_mtg_minutes_20190924 usesIn-City development and integration with existing freight routesWarehousing and distribution in the Green River ... 0.001819815 | | a/101825
- resolution_17 planning documents, investing in bicycle, pedestrian, freight mobility and transit enhancements and ... 0.001819815 | | a/116726
- october 2023 minutes october 2023 minutes 700 Fifth Avenue, Suite 3800 | PO Box 34996 | Seattle, WA 98124-4996 | T 206.684.ROAD (7623) | ... 0.001819815 | | a/176513
- timeline_2013_stadiumstudy actions- Streetscape concepts- Other strategiesSubmit Recommendations to City CouncilCouncil ConsidersComp. Plan / Zoning ... 0.001819815 | | a/87748
- alaskan way pbl_sbab_2022-04-06 )Department NamePage Number4Seattle Bicycle Advisory Board –April 6, 2022Existing ConditionsStreet design•4 lanes with parking bays•No bike ... 0.001819815 | | a/126480
- sbabjune2016agenda :05 Approval of Minutes & Advisory Letter Minutes for May, 2016 Meeting SBAB Advisory Letter on Sound Transit 3 Plan< ... 0.00181959686 | | a/106977
- final_oversight committee 2018 annual report letter (SBAB) called to our attention the lack of progress being made toward both overall Levy goals and the adopted 2017-21 Bicycle ... 0.00181959686 | | a/99586
- georgetowndowntown_factsheet_20230804 bike route in SODO by the end of 2024 • Provide better access to jobs and Link light rail • Maintain access for freight, ... 0.00181959686 | | a/145269
- cbo-overview-of-the-proposed-budget •Continued investments in paving and resurfacing (~$17M)•Further implementation of both the Pedestrian Master ... 0.00181959686 | | a/53254
- 2018proposedbudget9-28-17 investments in paving and resurfacing (~$17M)•Further implementation of both the Pedestrian Master Plan ... 0.00181959686 | | a/63857
- georgetowndowntown_factsheet_april2024 on project route, visit website)Visit the project webpage for more information on planned ... 0.00181959686 | | a/154990
- 150803rainiersbab between motor vehicles and bicycle traffic •Maintain access and improve choices for residents •Accommodate oversized vehicles •Implement ... 0.00181959686 | | a/107104