Filter Results

1501 to 1525 of 2519
vm2020annreport
will use the Design Guidelines checklist (Appendix E) for evaluation of all planned and potential projects outlined in the MIMP. Virginia ...
0.002136434 |
a/77922
seattledesigncommission-2003.11.06hallerlakemaintenancefacilityim ...
, functional and even elegant; ƒ encourages the Fleets and Facilities Department to find ways to use this project as a ...
0.002136434 |
a/85326
2005-2006_proposed_administration
reviews to fulfill the Office’s mission. Through its work, the Office of City Auditor answers the following types of ...
0.002136434 |
a/60721
2017boilerpressurevesselcode
shall be construed to create or form the basis for any liability on the part of the City, or its officers,  3 ...
0.002136434 |
a/96457
edi-etod-remnantparcels-rfp
with Section 504 of the Rehabilitation Act (Section 504) and the Americans with Disabilities Act (ADA), commits to nondiscrimination on the ...
0.002136434 |
a/153069
nov252013reqfrcustrevpanel
will follow up with the specifics in August August 6 17. Why is there not a fixed charge on wastewater rates? July 15 ...
0.002136434 |
a/111613
seattledesigncommission-2003.05.15jointtrainingfacilityminutes
and maintenance as well as their funding mechanisms are outside of the scope and responsibility of the CIP project or its ...
0.002136434 |
a/85315
2014-04-23_infrastructurefailures
of the United States an overall D grade and estimates it will cost $2.2 trillion to fix. The main concerns for Washington ...
0.002136434 |
a/57135
dec112013requestsfromcustomerreviewpanel
15 Tim Croll will follow up with the specifics in August August 6 17. Why is there not a fixed charge on wastewater rates? ...
0.002136434 |
a/111189
draft_2025_aap
in the King County Regional Homelessness Authority (KCRHA) as it enters its second full year of operations. Of the ...
0.002136434 |
a/163380
jan132014requestsfromcustomerreviewpanel
15 Tim Croll will follow up with the specifics in August August 6 17. Why is there not a fixed charge on wastewater rates? ...
0.002136434 |
a/111432
2021-26strategicpriority_sw_continueefforts_divertwaste
at the cart, through customer reported behaviors, and as reported from the contracted recyclables and compost processors.  Evaluate the ...
0.002136434 |
a/112073
local 27 cba effective through 123121
within Local No. 27. At the hearing, both sides shall present their positions. The Grievance Board shall issue its ...
0.002136434 |
a/64438
pdocmeetingsummary102419aa
the final 2020 year of the current PD 6yr spending plan. This would allow for the collection of additional revenue that would otherwise not ...
0.002136434 |
a/92490
pdocmeetingsummary102419a
the final 2020 year of the current PD 6yr spending plan. This would allow for the collection of additional revenue that would otherwise not ...
0.002136434 |
a/92489
jan292014requestsfromcustomerreviewpanel
Tim Croll will follow up with the specifics in August August 6 17. Why is there not a fixed charge on wastewater rates? ...
0.002136434 |
a/111444
scl binoculars spotting scope sir draft - for public comment ...
, alterations to the City Light-owned electrical system by a third-party in order to consume electric power without its ...
0.002136434 |
a/117179
scl check meter device sir draft - for public comment 2019-02-05
mission is fixed. Additional changes would require review the Current Diversion Coordinator. Law enforcement, as mentioned ...
0.002136434 |
a/117181
gl_new_structures
because of a combination of its size and non-contributing character. The Board may require that a building proposal be ...
0.002136434 |
a/74147
tab_administration
audits to fulfill the Office’s mission. Through its work, the Office of City Auditor answers the following types of ...
0.002136434 |
a/60708
scl sensorlink amp fork sir draft - for public comment ...
is fixed. Additional changes would require review the Current Diversion Coordinator. Law enforcement, as mentioned in 6.3, ...
0.002136434 |
a/117183
sepa_checklist_murraycanyon_illicitdischarge-061520
. In this case, the underdrain appears to have been cross-connected to the adjacent 12-inch diameter storm drainage system when that ...
0.002136434 |
a/113155
duwamish-matrix
to establish its work programin response to the recommended activities proposed in the specific neighborhood planand to ...
0.002136434 |
a/78363
2018sbcchapter9
(PRV) are required, each hose connection shall be provided with its ownPRV.9.The system shall be designed to provide a ...
0.002136434 |
a/97455
seattle_2013-15_domestic_violence_strategic_plan
technology fixes to ensure that patrol officers have routine access to protection order information SPD Explore expansion ...
0.002136434 |
a/69745