Filter Results

1476 to 1500 of 9052
2018sfcchapter33
be provided in accordance with therequirements of Section 1023.9.1.[S] 3311.5 Flammable or explosive substances or equipment for repairs or ...
0.0021972768 |
a/97721
lpbminutes8-16-17
’ the campus. She noted changes and pointed out the roof on Building 100, thickened with insulation. She said the school ...
0.0021972768 |
a/75049
cheventsurveycommresultsdata
Seattle get sketchier and less safe. We need more police patrolling on foot to not only keep an eye out but also build ...
0.0021972768 |
a/110159
financial-statements-federal-single-audit-2008
with a significant increase in cable franchise fees and street use permit fees. Revenues for various recreational ...
0.0021972768 |
a/58369
1.seattlecitylight
with build out of the Denny network andconstruction of transmission lines to the new substation.Broad Street Substation – ...
0.0021972768 |
a/62365
sclcap
the electrical system to serve new development and existingload, and supports development of an underground network. Funding for the new ...
0.0021972768 |
a/62380
2018_1_26-report-squarefeet2017
of inclusion and racial equity were at the forefront of our thoughts. We can’t build the city we want if we don’t center ...
0.0021972768 |
a/49631
lightrailamendmentsdirectorreportapril2025
Rail Transit Facilities Code Amendments Introduction The Seattle Department of Construction and Inspections (SDCI) is proposing ...
0.0021972768 |
a/168159
director's report
SDCI accepts a completed MUP or building permit application; 4. Maintain current allowances for applicants ...
0.00219726283 |
a/161022
2024designreviewexemptiondirector'sreport
comprehensive plan update. Mike Podowski/Gordon Clowers SDCI Design Review Exemption REP D7 2 3. Allow applicants to vest to the Land Use ...
0.00219726283 |
a/155317
spucap_000
• 5.5 miles of wastewater force mains • 87 City-owned and permitted Combined Sewer Overflow points • 38 Combined Sewer ...
0.00219726283 |
a/62363
backgroundreportmay2007
to another use. However, this is based on a small number of permits representing just 6% of all industry-to-other-use ...
0.00219726283 |
a/86724
seattlesindustriallandsbackgroundreport
% of the permits were for a change from some other use to industrial, resulting in a net gain.Average ...
0.00219726283 |
a/87986
cucac report august 2017_1
% reviewed biannually. If the University does not achieve 18% SOV campus trips by 2022, 16% by 2024, 14% by 2026, and 12% by 2028, master ...
0.00219723675 |
a/77703
treeregsconstitutentemailsthrough031920
the developer between now and the time that GEM starts applying for building permits; we don’t want GEM to ...
0.00219722139 |
a/119484
leg-tree-regulation-updates-ord-d5b
proposals associated with a tree permit shall: 7 a. Consider tree protection opportunities in the design and location of 8 ...
0.0021971527 |
a/54098
wa_st_proposed_amend_510-2019
of the electrical permit. 10. Acceptance test reporting to fire code official. At the conclusion of the testing, and ...
0.00219706865 |
a/64284
2021secreschapter5
. Hazardous materials shall not be used where the code for new construction would not permit their use in ...
0.00219706865 |
a/162733
4.2015-08-13_eop.emergencyoperationsplan.revisedmay2015
representative in the EOC. IV. THE CITY EMERGENCY OPERATIONS CENTER The City Emergency Operations Center (EOC) is built to exceed by 50% ...
0.00219706865 |
a/57016
facilitiesmasterplan
neighborhoods with odor, dust, noise, traffic,and other problems. The buildings require relatively high maintenance and ...
0.00219698832 |
a/113458
2021swmanualapxbsubmittalreqclean
, Building Permit, or a Seattle Department of Transportation (SDOT) Street Improvement Plan (SIP) ...
0.00219695945 |
a/96976
muplifespandirectorsreport
) or are recently in MUP land use review, but have not yet received building permit approvals, which is th ...
0.00219695945 |
a/148671
multifamilyconceptreport
, limited commercial uses permitted*Th e stated building type is primarily what is intended, although ...
0.00219693058 |
a/87999
desrptywca
Post-Intelligencer, March 7, 1913. “Citadel is Dedicated to Battle of Woman” Seattle Post-Intelligencer, May 1, 1914. Public Records : ...
0.002196892 |
a/76322
ywca-building-designation
. “YWCA” Seattle Post-Intelligencer, March 7, 1913. “Citadel is Dedicated to Battle of Woman” Seattle Post-Intelligencer, May 1, 1914. ...
0.002196892 |
a/76599