Filter Results

101 to 125 of 973
uptownrezoneordinance
-use development and that does not exceed 12,000 square feet in size is categorically exempt from the State Environmental ...
0.00225473032 |
a/87903
seattleindustrialfeischapter4
responses to comments refer to relevant discussions. 4.2.1 Economic & Market Analysis Comment Theme: Request for economic feasibility, ...
0.00225419458 |
a/134322
lightrailamendmentsordinanceapril2025
has been submitted to the Director, the 10 demolition permit application and the building permit application are categorically ...
0.00225366722 |
a/168160
2023sepachecklist
for these spaces as either exempt or non-exempt floor area. It may create a new extra amount of usable ...
0.00225366722 |
a/167710
su-mimp-2013-part2
, 105 160 to MIO 37, 65, 90, 105, 160) SEPA – Environmental Determination – SMC Chapter 25.05. SEPA ...
0.00225271867 |
a/77310
draftenvironmentalimpactstatement-2012-07-19
Policy Act (SEPA) of 1971 (Chapter 43.21C, Revised Code of Washington); the SEPA Rules, effective April 4, ...
0.0022524572 |
a/77895
8cgsimanual
pavement marker SCL Seattle City Light SDCI Seattle Department of Construction and Inspections SDOT Seattle Department of Transportation ...
0.00225235871 |
a/154376
seattleuniversityfinaleis060211
Environmental Policy Act (SEPA) of 1971 (Chapter 43.21C, Revised Code of Washington); the SEPA Rules, ...
0.00225235661 |
a/77301
mimpdraftdirectorsreport-2015-01-16
) – SMC Chapter 23.34.124 SEPA – Environmental Determination – SMC Chapter 25.05. SEPA DETERMINATIONS: ...
0.002252262 |
a/77407
oneseattleplandeisenviornment
the precontact and historic periods. Additionally, Washington SEPA allows some projects to be exempt from ...
0.00225178362 |
a/153551
sepa-checklist-waterway-1-full-line-sewer-repair_12-04-25
are categorically exempt from SEPA threshold determination requirements as established by WAC 197-11-800 ...
0.00225173542 |
a/175666
environmentallycriticalareasdirectorsreport
to high habitat function from 85 feet to 110 feet.  Remove the City requirement for State Environmental Policy Act (SEPA) ...
0.00225154776 |
a/96793
lowriseamendmentordinance
, that are subject to SEPA solely as a result of the provisions of Section 25.05.908, Environmentally Critical Areas, are ...
0.002251247 |
a/87993
sepa-checklist-southparkwaterqualityfacilitydeconstruction_021125 ...
sepa-checklist-southparkwaterqualityfacilitydeconstruction_021125 South Park Water Quality Facility Site Deconstruction ...
0.00225109421 |
a/165764
ohaffordablehousingomnibusdraftordinance
by Ordinance 5 126741, is amended as follows: 6 23.41.004 Applicability 7 A. Design review required 8 1. Subject to the ...
0.00225109421 |
a/141193
5_comments_responses_adu_feis_2018
characteristics of each neighborhood in its analysis of potential impacts. Impacts to each neighborhood should be examined individually.This ...
0.00225103786 |
a/53180
seattlefullcpdeis
exempts projects below certain sizes from review under the pro-visions the State Environmental Policy Act ...
0.00225099758 |
a/87659
sdcirecommendationnov2017
Institution Master Plan – SMC 23.69.006.B 2. Amendments to the MIO Height Designations –SMC 23.34 3. Substantive SEPA ...
0.00225085346 |
a/77860
swedishcherryhillmimpfinaldirectorsreport
Chapter 23.34.124 SEPA – Environmental Determination – SMC Chapter 25.05. SEPA DETERMINATIONS: [ ] ...
0.00225056056 |
a/77595
beps_directors_report
......................................................................... 47 5.1.9.6 District campus decarbonization compliance plan. ...
0.00224969024 |
a/150907
regreformmayorsrecommendedordinance
development that is subject to SEPA environmental review per SMC Chapter 25.05 is exempt from this ...
0.00224909233 |
a/88137
sdci design review exemption ord
, or deny, based on SEPA policies, a permit 21 for a project determined to be consistent with a planned action ordinance; ...
0.00224886 |
a/161023
attachment b draft recommendation summaries 090919 v1215am
: Raise Seattle Environmental Policy Act (SEPA) Thresholds ............................................................. 4 ...
0.002248725 |
a/72131
compiled_mha_deis_2017
. These projects may be exempt from project-level SEPA review.Alternative 2Alternative 2 estimates ten ...
0.0022485028 |
a/65025
oneseattleplanpermanentstatezoningcomplianceordinance
dwelling units, will not be considered 2 grounds for an exemption from the prohibition of master metering. 3 2. This ...
0.0022483503 |
a/169148