Skip to main content
This is an official government website.

Search Results

Search

Filters
Departments [27]
Documents [535]

Filters

Departments [27]
Documents [535]

Results

101 to 125 of 562
  1. seattle-go-2014-pos B&O tax on the City-owned drainage utility and solid waste utility at the rate of 11.5%, on the City-owned ...
  2. seattle city light 2024 os with errata submitted, OFFICIAL STATEMENT New Issue Moody’s Rating: Aa2 Book-Entry Only S&P Rating: AA (See “Other ...
  3. 2006_entire_adopted_budget_document decision to raise the tax rate from 10% to 11.5% for water, drainage, wastewater, the City’s solid waste ...
  4. entire_2007-2008_proposed_budget Rate = 8.8%NOTE: Rate is 9.3% for food and beverages sold in restaurants and bars.General ...
  5. seattle-ltgo-utgo-os-2014 utility and solid waste utility at the rate of 11.5%, on the City-owned wastewater utility at the ...
  6. seattle-ltgo-utgo-os-2014 utility and solid waste utility at the rate of 11.5%, on the City-owned wastewater utility at the ...
  7. 2012-2017_adopted_cip previously used by the City. Funding for Solid Waste capital projects comes predominantly from rates ...
  8. 2012-2017_adopted_cip_000 landfills previously used by the City. Funding for Solid Waste capital projects comes predominantly from ...
  9. entire_2007_adopted_&_2008_endorsed_budget will be used on additional transit services. The exception to the 8.8% rate is a 9.3% rate that is ...
  10. 1996commercialandselfhaulwastestreamscompositionstudy , not generation. (Waste generationequals the sum of disposed and recycled amounts.) The samples were taken from loads ...
  11. 2012-2017_proposed_cip policy will • Raise the minimum required green building rating to LEED Gold; • Set minimum requirements for energy and ...
  12. 2013-2018_proposed_cip green building rating is LEED Gold; o There are minimum requirements for energy and water efficiency, construction ...
  13. 2013-2018_adopted_cip , and plumbing o The minimum required green building rating is LEED Gold; o There are minimum requirements for water ...
  14. 2013-2018_adopted_cip_000 , and plumbing o The minimum required green building rating is LEED Gold; o There are minimum requirements for water ...
  15. entire_2008_proposed_budget County 0.15%Metro 0.90%Criminal Justice Levy 0.10%Sound Transit 0.40%State of Washington 6.50%Total Rate = 8.9%NOTE: ...
  16. 2006_proposed_budget increases resulting from the City Council’s decision to raise the tax rate from 10% to 11.5% for water, drainage, ...
  17. financial-statements-federal-single-audit-2011 bonds; and $45.8 million to finance certain capital improvement projects of the City’s solid waste system. The City’s bond ...
  18. fap_communityleaderinterviews_2022 System – All the activities involved in food creation, including production, processing, distribution, consumption, and ...
  19. seattle_public_utilities to one of the two household hazardous waste sites. The City contracts with a private company to pick up and dispose of ...
  20. seattle_public_utilities . The Solid Waste CIP is funded through solid waste rates and revenue bonds. Overhead ...
  21. utilitiestransportation_2012adoptedbudget_000 . Rates adopted in 2010 for the period 2011-2012 inform the 2012 budgets for solid waste and drainage ...
  22. utilitiestransportation_2012adoptedbudget inform the 2012 budgets for solid waste and drainage and wastewater included in this document. Because 2012 is the second ...
  23. utilitiestransportation_2012adoptedbudget_001 . Rates adopted in 2010 for the period 2011-2012 inform the 2012 budgets for solid waste and drainage ...
  24. financial-audit-2012 for price reductions every two years beginning in 2003. The City renegotiated a new long-term yard waste ...
  25. seattle-solid-waste-2018-financials garbage, yard waste, food waste, and recycling. Independent vendors ...