Filter Results

1176 to 1200 of 1652
landuseapplicationfees2022
‐submittal hours will be billed at the hourly rate. Master Use Permit applications are reviewed on an hourly basis. The min ...
0.00214708922 |
a/96559
q3&q4-2018strategicplantrackingreport-v1
included: • Replacement at Arroyo Beach is 25% complete; • Brace Point UG Permit is in the review process; • Civil ...
0.00214708922 |
a/51356
07.16.2020 ddr2020-13
of structures, access, utilities and a consideration of the intensity and location of land disturbance activities on the site during land ...
0.00214708922 |
a/119443
desrptjohn b. allen school
, it did not get listed for demolition under the subsequent building program. Around this time, the district changed its ...
0.00214708922 |
a/76115
desrptjohnballenschool
, it did not get listed for demolition under the subsequent building program. Around this time, the district changed its ...
0.00214708922 |
a/76116
allen-johnb-designation
, it did not get listed for demolition under the subsequent building program. Around this time, the district changed its ...
0.00214708922 |
a/75808
arts_culture_recreation
increases for 2006. Also, four demolition and restoration capital projects will be completed in Discovery Park, which ...
0.00214708922 |
a/61024
notes-2015-02-05
was polled by show of hands. The motion passes unanimously. Comments to DPD Recommended Conditions to Master Plan Approval #2 – TMP Goal ...
0.00214708922 |
a/77466
4391-ohevaluation
the demolition of the existing structure. Therefore, the future redevelopment of the property will require a change of use ...
0.00214708922 |
a/59452
landuseapplicationfeerequirements
a minimum initial fee of $860.00 (for 2 hours of meeting and review time). Additional pre‐submittal hours will be billed at the hourly rate. ...
0.00214708922 |
a/98099
landuseapplicationfees2023
initial fee of $860.00 (for 2 hours of meeting and review time). Additional pre‐submittal hours will be billed at the hourly rate. Master Us ...
0.00214708922 |
a/137804
pspb3-17-21
the 1949 earthquake, demolition of one building and new construction in targeted areas. The work will include façade ...
0.00214708922 |
a/73825
policylinkseattleequitymemoupdatefall2015
of businesses permitted to locate within the urban villages and urban centers. o New Policy: Ensure land use codes ...
0.00214708922 |
a/87065
seattledesigncommission-2007.11.01broadstreetgreenstreetminutes
for relocating the demolished park. In August, the Council passed an ordinance requiring the demolition of Seattle ...
0.00214708922 |
a/85410
introcap
Improvement Programs to meet federal and state regulatory requirements. The City of Seattle must abide by the City's two National Pollutant ...
0.00214708922 |
a/62350
ose_btu_waivers
• Buildings scheduled to be demolished within three years of the tune-up compliance date.• Demolition or deconstruction ...
0.00214708922 |
a/145205
lpbminutes_8-3-22
would like to see 2 better spatial design and more architectural character in line with the existing site. She said ...
0.00214708922 |
a/139572
overview
must abide by the City's two National Pollutant Discharge Elimination System (NPDES) permits, one for storm water and one ...
0.00214708922 |
a/63400
isrdminutes_5-28-24
goals and objectives SMC 23.66.308 – International District preferred uses east of Interstate 5 SMC 23.66.318 - Demolition ...
0.00214708922 |
a/159042
isrdminutes_5-28-24
goals and objectives SMC 23.66.308 – International District preferred uses east of Interstate 5 SMC 23.66.318 - Demolition ...
0.00214708922 |
a/159047
05-10_proposed_cip_ffd_project_detail
related to the sale of the Alaska Building - $450,000, expected completion 2005; demolition costs for the Municipal ...
0.00214708922 |
a/60833
05-10_ffd_adopted_project_detail_final
; transaction costs related to the sale of the Alaska Building - $450,000, expected completion 2005; demolition costs for ...
0.00214708922 |
a/60784
psbminutes2-5-20
-restaurant format ARC report: Change of use not reviewed at ARC. Jim Brown proposed a market hall concept for the ground floor and noted ...
0.00214708922 |
a/74229
lpb4-21-21
to secure Waterway 4 continued. The permit process would take another three years to complete. Soon after their ...
0.00214708922 |
a/74666
lpb9-2-20
Board opinion, and #2 - Obtained a SEPA Determination of Significance (DS) for the ' subdivision, construction of housing, change of use, ...
0.00214708922 |
a/74702