Filter Results

1176 to 1200 of 1291
cen_projects
and $194,000 in 2008 for construction cost escalation for all Seattle Center CIP projects. The funds will be used in cases where final ...
0.002142034 |
a/61104
spab2017decembermeetingminutes
to address complaints. oJanine: Why are there three companies? A: For a pilot, hard to limit number of companies (bidding, ...
0.002142034 |
a/107911
draftofficefundrule
, but is not limited to, making application, quoting a price, submitting a proposal and responding to a bid request. 2. ...
0.002142034 |
a/129940
minutesaugust2013
to be approved, provide a one‐pager with their services, and then the principal chooses from those programs and uses it to bid
0.002142034 |
a/69965
2022_dvworkgroup_rfq
be considered included with or incidental to other Bid/Cost items.CONTACT INFORMATION Procurement Contact:Caedmon Magboo ...
0.002142034 |
a/51934
2018_0501stakeholdermeetingminutes
A presentation was given to share updates on the Magnolia Bridge Planning Study. This presentation provided the results of ...
0.002142034 |
a/100812
2014prejob_meeting
Contractors ask for clarification(s) or guidance as needed o Attendees discuss jobsite conditions and proposed trade assignments ...
0.002142034 |
a/58702
20140110prejob_meeting
plans o Contractors ask for clarification(s) or guidance as needed o Attendees discuss jobsite conditions and proposed trade assignments ...
0.002142034 |
a/58700
desrpttownhall
brick.” The building committee awarded construction and plumbing contracts early in August 1916. Neil McDonald received the construction ...
0.002142034 |
a/76280
town-hall-designation
-colored brick.” The building committee awarded construction and plumbing contracts early in August 1916. Neil McDonald received the ...
0.002142034 |
a/76565
fourth-church-christ-designation
with cream-colored brick.” The building committee awarded construction and plumbing contracts early in August 1916. Neil McDonald received ...
0.002142034 |
a/76393
meetingnotes_20180823
the infiltration capacity of the field and results indicate that we will not be doing pervious concrete for pathways. The ...
0.002142034 |
a/92967
seattledesigncommission-2009.03.19northgateurbancenterparkminutes ...
% construction documents, 95% by May. The project will go out to bid in July with construction in late fall. A MUP will ...
0.002142034 |
a/85471
2019_0305_loc_marchminutes
. The materials were translated into seven languages and notifications were targeted to reach historically underserved communities. This ...
0.002142034 |
a/99536
seattle ibc steel reason statement 23 0120
. Design, construction, and product manufacturers must work together to achieve and report the embodied carbon results. ...
0.002142034 |
a/138681
2021_0922_dcplanregularmeetingminutes
the previous survey. Nationwide is currently analyzing the results of the survey, which will be presented at the next ...
0.002142034 |
a/68742
construction-work-sites-training-rfp-q-a
pay until remedied or issuing a deficient performance rating which may affect future bidding on City projects. In ...
0.002142034 |
a/58777
loc_bridgeseismicmemo_november2020
loc_bridgeseismicmemo_november2020 Page 1 of 3 700 Fifth Avenue, Suite 3800 | PO Box 34996 | Seattle, WA 98124-4996 | 206-684-ROAD ...
0.002142034 |
a/99619
fire marshals letter - 2018 sfc section 510 and new forms
Provisions, Testing Forms and Preview of PSERN Transition, Page 2 • Annual testing and maintenance reports – updated form Continue to use ...
0.002142034 |
a/64194
swac_notes_20190904
to find efficiencies between all these projects, which may result in cost savings. SPU Solid Waste Advisory Committee ...
0.002142034 |
a/112406
seattle ibc concrete reason statement 23 0120 (1)
for reporting material GHG emissions be provided at the time of permit. Design, construction, and product manufacturers must work together ...
0.002142034 |
a/138680
2024 fas responsible contractor policy - signed
compliance, within applicable bidding thresholds, to the adopted policies and guidelines detailed below. 2. Responsibility ...
0.002142034 |
a/163178
fccstudy_rfp_2018_qa_021218
fccstudy_rfp_2018_qa_021218 FCC Study RFP Q/A Updated: February 9, 2018 Date Question Answer 2/2 Have there been many inquiries into this ...
0.002142034 |
a/55774
wmbe-advisory-committee-meeting-notes-2022.02.16
and City updates - Elisa Young – 10 minutes a. Elisa gave an update on 2021 WMBE performance, the 2022 goals planning process and the ...
0.002142034 |
a/128523
wmbe-advisory-committee-meeting-notes-11-17-21
with City about how to best work to support WMBEs • Phase 3: Have meetings to connect and get feedback with decisionmakers • Early scan of ...
0.002142034 |
a/59018