Filter Results

9851 to 9875 of 18026
seattlerecreationdemandstudy2016
future demand for a variety of recreation activities. The study combines data from three methodologies: •Participation ...
0.0031062148 |
a/92570
6.13.2019_8thaves-and-sothellost-rv
Photos to HSD? Yes  NoSITE OCCUPANCY DATA Date of Inspection Tents Structures Bed Rolls Vehicles TOTAL COUNT 7/9/2019 2 2 ...
0.0031062148 |
a/66605
upcoming_opps_2019_3.12
to Move Seattle workplan: 1) project management and coordination; 2) data collection and analysis; 3) transportation ...
0.0031062148 |
a/99801
2022_annual-levy-report_final
have revised our 2021 data to include Delridge Way SW paving mileage. We are no longer counting Delridge Way SW paving ...
0.0031062148 |
a/140586
upcoming_opps_2019_3.11
Multimodal Plus corridor development in Seattle as outlined in the Levy to Move Seattle workplan: 1) project management and coordination; 2) ...
0.0031062148 |
a/99800
4.11.2019-leary-triangle-8th-ave-nw-nw-43rd
. Shepard SERIS # 19-00044002 Field Coordinator: Bruce Bentley Photos to FAS? ☒ Yes ☐ No Referred by: CSR, ...
0.0031062148 |
a/66579
6.3.2019_ne120th-and-31stavene-behind-la-fitness
By: Community, CSR Photos to FAS? ☒ Yes ☐ No SITE OCCUPANCY DATA Date of Inspection Tents Structures Bed Rolls ...
0.0031062148 |
a/66610
03-25-20 8th and s weller obstruction
, storage, and before/after photos. SITE OCCUPANCY DATA Date of Event Tents Structures Bed Rolls Vehicles TOTAL COUNT ...
0.0031062148 |
a/66796
oneseattleplanpresentation
areas)•Include certain data on transportation, housing, facilities and services5New Comp Plan Requirements since 2016HB ...
0.0031062148 |
a/165687
uw-annual-report-2020
in the report; The following information was provided by the City of Seattle. Please contact Gordon Clowers (Gordon.Clowers@seattle.gov) for ...
0.0031062148 |
a/77866
09-26-2017-canal-st
☐  No  SITE OCCUPANCY DATA Date of Inspection Tents Structures Bed Rolls Vehicles TOTAL COUNT 9‐20‐17 2 1 0 0 3             ...
0.0031062148 |
a/66353
03-25-20 8th ave s and s weller st
. This includes pictures of site conditions, tents, storage, and before/after photos. SITE OCCUPANCY DATA Date of Event ...
0.0031062148 |
a/66797
11-7-17-mercer-harrison
By: Community, SERIS, and Contractors Photos to FAS? ☒  Yes     ☐  No  SITE OCCUPANCY DATA Date of Inspection Tents Structu ...
0.0031062148 |
a/66402
11-7-17-mercer-harrison(0)
By: Community, SERIS, and Contractors Photos to FAS? ☒  Yes     ☐  No  SITE OCCUPANCY DATA Date of Inspection Tents Structu ...
0.0031062148 |
a/66401
10-9-2018-occidental-ave-s
to FAS? ☒Yes ☐ NoSITE OCCUPANCY DATA Date of Inspection Tents Structures Bed Rolls Vehicles TOTAL COUNT 10/04/2018 1 1 ...
0.0031062148 |
a/66390
11-04-2019 myers way obstruction
conditions, tents, storage, and before/after photos. SITE OCCUPANCY DATA Date of Event Tents Structures Bed Rolls ...
0.0031062148 |
a/66571
10-5-17-kinnear-place-park
to FAS? ☒  Yes     ☐  No  SITE OCCUPANCY DATA Date of Inspection Tents Structures Bed Rolls Vehicles TOTAL COUNT 9/28/17 2  ...
0.0031062148 |
a/66388
5-15-18-4th-yesler-underpass
OCCUPANCY DATA Date of Inspection Tents Structures Bed Rolls Vehicles TOTAL COUNT 05/10/2018 7 0 3 0 10 SITE CHARACTERISICS ...
0.0031062148 |
a/66469
300_pine_spectaxscope_unit1
(Final).xlsx II. Application & Narrative a. 300 Pine – Unit 1 Scope of Work (Final).pdf b. 300 Pine (Unit 1) App & Certification of Special ...
0.0031062148 |
a/75093
09-23-17-i-90-eb
OCCUPANCY DATA Date of Inspection Tents Structures Bed Rolls Vehicles TOTAL COUNT 9/13/17 4 1 0 0 5                         ...
0.0031062148 |
a/66352
lpb040225wildestreatfieldnom
in early 20th century publications, such von Holst, 1915, with construction costs of $3,000 to $6,000. The builder, F. M. Barnes, advertised ...
0.0031062148 |
a/167362
lpb050725wildestreatfieldnom
in early 20th century publications, such von Holst, 1915, with construction costs of $3,000 to $6,000. The builder, F. M. Barnes, advertised ...
0.0031062148 |
a/168397
lpbwildestreatfieldhousenom
in early 20th century publications, such von Holst, 1915, with construction costs of $3,000 to $6,000. The builder, F. M. Barnes, advertised ...
0.0031062148 |
a/166401
lpbcurrentnom_franklinapartments2014
.............................................................................................................1 2. PROPERTY ...
0.0031062148 |
a/74469
2016_finditfixit_belltown_updates_report
(PMP) for public comment in early July. The Plan identifies priority loca-tions for pedestrian improvements throughout the city over the ...
0.0031062148 |
a/72565