Filter Results

9501 to 9525 of 11414
3c. 18-818, district 3 street ends
Costs $ 0 Design Contingency (10% of Design Phase Subtotal) $ 0 Total Design Phase Costs $ 0 Construction Phase Construction Costs (include ...
0.003019525 |
a/78082
dprcap_000
of Parks and Recreation, a new park space will be created for the Ballard neighborhood. The Park Boulevard will provide usable park space ...
0.003019525 |
a/62344
termpermitapplicationformfill
and traffic studies in vicinity of proposed skybridge ADA route if skybridge is removed Cost estimate for removal of ...
0.003019525 |
a/104875
dpr_projects
of the soccer field, installs new fencing between the wading pool and the active railroad tracks due east of the park, installs additional ...
0.003019525 |
a/61250
adoptedbudgetoverview
increased General Fund revenues by transferring $918,000 in 2018, $889,000 in 2019 and $871,000 in 2020 of red light camera fine revenues ...
0.003019525 |
a/63089
seattledesigncommission2013.04.04seattlearenaminutes
of Occidental, the public is losing a piece of functionality of the grid and the City is allowing for a much larger structure that brings ...
0.003019525 |
a/85810
seattle design commission 2013.04.04 seattle arena minutes
a part of Occidental, the public is losing a piece of functionality of the grid and the City is allowing for a much larger structure that ...
0.003019525 |
a/85884
2019_fall_route7_map
visibility (complete)S Rose St• Reduce pedestrian wait time; convert east/west outer lanes from general purpose to right-turn only ...
0.003019525 |
a/105880
dpr_projects
, installs additional fencing to separate the park from automobile traffic on Findlay Street to the north, and performs ...
0.003019525 |
a/61306
lwbdesignconceptsflyer
:Improve access to park amenities through crossing enhancements.Promote safety for all modes of transportation with traffic ...
0.003019525 |
a/159723
04-28-2020 ugm vicinity litter pick
SAFETY/STRUCTURAL CONCERNS Weapons  Yes  No Park  Yes  No Sidewalk  Yes  No Proximity to Bridge  Yes  No Impeding Roadway  Yes  No ...
0.003019525 |
a/66900
18developmentservicesfinal
and, if approved, an amended side sewer permit is issued. Contractors in this situation should: 1. Take all necessary measurements and plate ...
0.003019525 |
a/113612
sw_plan_015860
awareness of private pickup options to minimize self-haul customer traffic at City transfer stations. In 2009, the ...
0.003019525 |
a/113503
solidwasteplanapdxbzwresolution30990
, and increasing public awareness of private pickup options to minimize self-haul customer traffic at City transfer ...
0.003019525 |
a/113174
uwsrhsappa
have a car, you’ll spend in gas, you’ll spend in parking. [You’ll spend] time and you will have more stress. Because if you come from ...
0.003019525 |
a/50656
desrpt_evans_pool
a "traffic roadway, electric railway location, a pleasure drive and a wide walk," and filling the drained portions of the ...
0.003019525 |
a/76331
oe_highlights_2024_final_spanish
* Traffic Shop, 4200 Airport Way S., Seattle 98108, Common Area 3:00 p. m. – 4:00 p. m. 10/23/2024 * HSD Renton Office – ...
0.003019525 |
a/161213
final seattle university mimp report fy24 2024.09.23
, reviews and steps shall be required: 1) A full parking and traffic analysis, a site specific light and glare study and a ...
0.003019525 |
a/162914
add_f_safetyplan
where applicable. Police traffic management of the event On site police presence during the event 7. RISK MANAGEMENT ...
0.003019525 |
a/110063
oneseattleplandeisfrontsections
Exhibit 3.10-27. Citywide Collision Rate, 2010-2020 .......................................................................... 3.10-48 ...
0.003019525 |
a/153566
adoptedufcmeetingnotes040723
against erosion, blossoming trees that delight the eye of every passerby, the muting of traffic noise, homes they provide ...
0.003019525 |
a/143113
2018_0607_loc_presentation
use, traffic volume, coordination opportunities, complaints and claims, and geographic balance across the city.As this ...
0.003019525 |
a/99520
udistrict100
udistrict100 Route 44U-District Segment, NE 45th St and8th Ave NEBeforeAfter8TH AVE NENE 45TH STNConcept benefits:This concept will provide ...
0.003019525 |
a/128350
seattledesigncommission-2017.07.20centercityconnectorminutes
will include a mixed vehicular and cyclist zone in the westbound traffic lane, which will safely cross the transitway, and ...
0.003019525 |
a/84818
adopted040319meetingsummary
onto an arterial. Please provide either a turnaround on site or a provide a safety study which addresses visibility, ...
0.003019525 |
a/118916