Filter Results

9351 to 9375 of 15999
arts
Descriptions of Incremental Budget Changes Baseline Changes Citywide Adjustments for Standard Cost Changes - ($70,566) ...
0.002217641 |
a/62553
deel
opportunity gap for children is eliminated. The levy funded a demonstration phase of the Seattle Preschool Program, which began in 2015 and ...
0.002217641 |
a/63186
edi-advisory-board-minutes-october2021
of funding for capacity-building and noted that it is often an entry point for newer organizations to develop and plan for ...
0.002217641 |
a/87027
2016opa-0462ccs10-26-16ma
to officers and public safety, coordinate the actions and placementof officers and resources, and fcrrmt¡late plans to ...
0.002217641 |
a/81422
oh
, provides home repair and weatherization assistance, funds permanently affordable homeownership opportunities, and leads Citywide ...
0.002217641 |
a/173353
spl
of Trustees "exclusive control of library expenditures for library purposes." The Library Board adopts an annual Operation ...
0.002217641 |
a/62874
ppen
for Standard Cost Changes - $22,712 Citywide technical adjustments made in the initial planning phase ...
0.002217641 |
a/62782
alkiesdepartureresponse
flexibility for changing program needs and demographics, and provides students with a safe and positive learning environment. SPS’s ...
0.002217641 |
a/138678
spl
for downtown residents and workers, it is also the hub for planning and developing system-wide programs and services and ...
0.002217641 |
a/134176
spl
for a lease of shop and storage space to replace an expiring lease. Citywide Adjustments for Standard Cost Changes - ...
0.002217641 |
a/62796
industriallandsbenefitsandchallenges
industriallandsbenefitsandchallenges City of Seattle Department of Planning and Development Industrial Lands Survey ...
0.002217641 |
a/87982
2021srcchapter2
. [RB] BOND BEAM. A horizontal grouted element within masonry in which reinforcement is embedded. [RB] BRACED WALL LINE. A straight line ...
0.002217641 |
a/162766
20250924_irpadvisorymeeting
20250924_irpadvisorymeeting WE POWER SEATTLE2026 Integrated Resource Plan (IRP): External Advisory Panel Meeting ...
0.002217641 |
a/173561
2013.07.18bikemasterplandesigncommissionpresentation
2013.07.18bikemasterplandesigncommissionpresentation seattle bicycle master plan Seattle Design Commission July 18, 2013 2 ...
0.002217641 |
a/85101
cpi-08-progress-report
Bicycle Master Plan was finalizedl 40 percent reduction in fuel use by Seattle Centerl Launched Green Building Initiative ...
0.002217641 |
a/88280
kubotastormwatermp
circulation, support educational opportunities, and promote the Kubota Garden’s unique sense of place. This Stormwater Master ...
0.002217641 |
a/93245
fhwahop13028
contained in this document. This report does not constitute a standard, specification, or regulation.The United States ...
0.002217641 |
a/117086
23rd ave stabilization packet
, and  Setup a payment plan with Puget Sound Energy You can receive direct financial assistance up to $25,000 for the ...
0.002217641 |
a/56137
seattle design commission - 2016.06 presentation to council
◦(CIP)◦◦Right-of-Way◦projects◦(ROW)––Street–and–alley–vacations––Skybridges––Long-term–street–use–permits◦◦Major◦transportation◦projects◦(M) ...
0.002217641 |
a/84744
t18bathroomstudyfinal
. ................................................................................... 32 Figure 35. Concept floor plan for ...
0.002217641 |
a/101689
t18bathroomstudyfinal
. ................................................................................... 32 Figure 35. Concept floor plan for ...
0.002217641 |
a/99464
seattledesigncommission-2015.03.199thlenorapresentation
with Parks) is to provide a more S-shaped division of property once vacated that would provide 175 more sf for Parks than the ...
0.002217641 |
a/85778
2021srcchapter4
of cementitious materials specified in Section 19.3.3.4 of ACI 318. Materials used to produce concrete and testing thereof shall comply with ...
0.002217641 |
a/162772
ratedesignfinalreportapr2019
in January 2019, this final report sets forth our rate design priorities at a policy level, and our preferred rate design tools to ...
0.002217641 |
a/51367
sparc061124spnasbldg11pp
WASHINGTONBUILDING1112345UP1234UP1234567891011121314151617181920212223UP12345FFNO WORKAREANO WORKAREA12345UPSCALE: 1" =100'2SITE ...
0.002217641 |
a/156929