You just searched for:
Search
Filter Results
9226 to 9250 of 14950
february 2026 levy oversight committee meeting
http://www.seattle.gov/documents/departments/sdot/about/funding/levy/transp ...
february 2026 levy oversight committee meeting February 3, 2026Seattle Transportation Levy Oversight CommitteeAgenda•Welcome & Introducing ...
0.00310286274 |
a/177300
2022-solid-waste-plan-update_chapter-9_education-outreach-enforce ...
http://www.seattle.gov/documents/departments/spu/aboutus/plans/solidwaste/2 ...
program and Seattle’s collection contractors to partner on education and enforcement with nonresidential customers that need additional ...
0.00310286274 |
a/146061
2024.10.23_stab_mlk signal reprioritization pilot
http://www.seattle.gov/documents/departments/sdot/boardscommittees/tab/pre- ...
traffic.7Pilot ApproachSignal timing changes were implemented in three phases, with SDOT and ST staff on-site and in the ...
0.00310286274 |
a/163623
04052022_cost effective approaches case study_loc
http://www.seattle.gov/documents/departments/sdot/boardscommittees/loc/move ...
Considerations•Traffic volume on the road that needs to be crossed•Vehicularspeeds•Pedestrian generators and attractors ...
0.00310286274 |
a/126497
new sidewalks and crossing improvements
http://www.seattle.gov/documents/departments/sdot/boardscommittees/loc/move ...
and Opportunities•Looking Ahead•Q&A3Levy Program Funding 4•New Sidewalks -$96.3M•Levy to Move Seattle: $45.1M•Local: $42.8M•School Safety ...
0.00310286274 |
a/136487
pacejan2026-citygov101
http://www.seattle.gov/documents/departments/neighborhoods/pace/pacejan2026 ...
Services, Labor, & Economic DevelopmentSeattle City Attorney•Criminal Division •Prosecutes misdemeanors, gross misdemeanors, and ...
0.00310286274 |
a/177115
aurora ave n planning study
http://www.seattle.gov/documents/departments/sdot/boardscommittees/sbab/pre ...
for traffic collisionsRapidRide E Line is the busiest frequent bus route in WAHigh priority for sidewalks and pedestrian ...
0.00310286274 |
a/163593
2022-solid-waste-plan-update_chapter-3_solid-waste-data-trends
http://www.seattle.gov/documents/departments/spu/aboutus/plans/solidwaste/2 ...
neighborhoods increases collection truck traffic, as different types of trucks are needed to service dumpsters versus ...
0.00310286274 |
a/146063
04052022_srts program_loc
http://www.seattle.gov/documents/departments/sdot/boardscommittees/loc/move ...
school safety projects per year•At least one safety project for every public school•$5.6M total Levy funding ($600k-$800k/year)•$1M-$6M per ...
0.00310286274 |
a/126499
linkconnectionsprogram_tab_20230628
http://www.seattle.gov/documents/departments/sdot/boardscommittees/tab/pre- ...
joints•Multiple, extended, parallel lane closures•Use of Express Lanes to serve mainline traffic•Regional diversion and ...
0.00310286274 |
a/144011
q2-2024-sbp-progress-report
http://www.seattle.gov/documents/departments/spu/aboutus/plans/sbp/strategi ...
costs through shared pavement restoration, mobilization, and traffic control costs. This consists of three different ...
0.00310286274 |
a/163157
tpmc_tab 4-27-22
http://www.seattle.gov/documents/departments/sdot/boardscommittees/tab/pre- ...
with trolley wire•Five miles of protected bike lanes•Intersections with Upgraded Traffic Signals Including TSP or Transit ...
0.00310286274 |
a/127420
q3 2023 quarterly report
http://www.seattle.gov/documents/departments/spu/aboutus/plans/sbp/strategi ...
, and traffic control costs. This consists of three different investment projects:•Water System Overall Asset ...
0.00310286274 |
a/151529
q3 2023 quarterly report
http://www.seattle.gov/documents/departments/spu/aboutus/plans/sbp/strategi ...
, and traffic control costs. This consists of three different investment projects:•Water System Overall Asset ...
0.00310286274 |
a/158750
checkoutreusereport2021
http://www.seattle.gov/documents/departments/spu/aboutus/reports/solid-wast ...
packaging.There are multiple convenient return locationsin high traffic areas.High accessAccessibility for FSBReusable ...
0.00310286274 |
a/112780
q3-2024-sbp-progress-report
http://www.seattle.gov/documents/departments/spu/aboutus/plans/sbp/strategi ...
service; and replace failing infrastructure at reduced costs through shared pavement restoration, mobilization, and traffic ...
0.00310286274 |
a/163954
2025-07-15_rainier ave bikeability_sbab subcommittee
http://www.seattle.gov/documents/departments/sdot/boardscommittees/sbab/202 ...
beacons at 2 previously unmarked ramps.●"Tuff curbs" to visually and physically narrow ramp entrances/exits and slow ...
0.00310286274 |
a/172947
spu_sbp_appendixf_riskandresilience_councilsubmittal
http://www.seattle.gov/documents/departments/spu/aboutus/plans/sbp/strategi ...
significantly increased the cost of housing and worsened traffic congestion. Recent surveys found that 75% of SPU field ...
0.00310286274 |
a/112330
stp implementation plan and levy delivery plan
http://www.seattle.gov/documents/departments/sdot/boardscommittees/sbab/202 ...
years (2015-2024)•2024 Transportation Levy: $1.55B over 8 years (2025-2032)SDOT has many additional funding sources that support our ...
0.00310286274 |
a/169058
2022-solid-waste-plan-update_chapter-7_solid-waste-transfer-proce ...
http://www.seattle.gov/documents/departments/spu/aboutus/plans/solidwaste/2 ...
system helps spread solid waste transfer activity across geographic areas, balancing neighborhood impacts, such as noise and increased ...
0.00310286274 |
a/146062
leafline trails coalition update_sbab
http://www.seattle.gov/documents/departments/sdot/boardscommittees/sbab/202 ...
, joggers, and other non-motorized users. ? Cycle tracks (Protected Bicycle Lanes) - facilities physically separated from motor vehicle ...
0.00310286274 |
a/174990
energyperformancereport_2014_with_benchmarking
http://www.seattle.gov/documents/departments/ose/energyperformancereport_20 ...
2013-2014DetaileD BuilDing Performance04introductionbenchmarkingportfolio overviewperformanceappendixOperations SupportAIRPORT WAY CENTER - ...
0.00310286274 |
a/88343
duwamishvalleyactionplan_june2018
http://www.seattle.gov/documents/departments/ose/duwamish/duwamishvalleyact ...
a festival street on 12th Ave. S between S Vale and S Bailey streets (by All-City Coffee). It is a public place designed to support ...
0.00310286274 |
a/90418
2023-redline-markups-of-revised-standard-plans
http://www.seattle.gov/documents/departments/spu/construction-resources/sta ...
TRAFFIC AREAS. 2. COVER THICKNESS IS MEASURED FROM THE BOTTOM OF THE PATTERN. 3. FRAMES MUST BE MANUFACTURED FROM CAST IRON ...
0.00310286274 |
a/163835
20081210m
http://www.seattle.gov/documents/departments/council/issues/oparb/agendas_m ...
some of his background: He is a sergeant with SPD, and has been with SPD 28 years. He started on the 1st & Pike night shift; served on the ...
0.00310286274 |
a/53542
Previous
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
Next