Filter Results

9076 to 9100 of 14950
encampment-combined
adverse impact to environmental health as an element of the environment. b. Noise 1) What types of noise exist in the area which may ...
0.00310286274 |
a/59890
2021_streetcar_operations_report_online ready
% by property owners along the alignment and the remainder by federal, state, and local funds.The SLU line is 1.3 miles long and operates ...
0.00310286274 |
a/135510
2021_streetcar_operations_report_final
% by property owners along the alignment and the remainder by federal, state, and local funds.The SLU line is 1.3 miles long and operates ...
0.00310286274 |
a/136440
2018.05.24_capitolhill_dg_package_capitolhill_dg
of the restaurants and clubs in Pike Pine entertainment district where the volume of people and traffic on week-end nights ...
0.00310286274 |
a/86449
dcpresentation1ballard-roadside-raingardensagendaid2854
with community traffic calming goals Why Here? 17 • Alternate parking options (alley access and driveways) •Soil ...
0.00310286274 |
a/85149
lpb08062925fremonttrolleybarnpp
or flake and is not affected by sunlight.** This process produces a harder, more durable finish that makes this a perfect choice for ...
0.00310286274 |
a/171612
little saigon landmark project feasibility study
. Others named more frequent community festivals and a monthly night market as activities that would benefit residents and draw additional ...
0.00310286274 |
a/86584
seattledesigncommission-2009.12.03admiralwaysafewaypresentation
, 2009Page31411 Fourth Ave., Suite 1306Seattle, WA 98101Tel. 206.682.6170Traffic and Parking Analysis Questions to Address 1. How much ...
0.00310286274 |
a/85511
ae 0046-17 seattle design commission sodo package 3 20241107
in the station area.•Concern about construction impacts, including event traffic and road closures for freight movement and ...
0.00310286274 |
a/167239
seattledesigncommission-2017.02.02onecentercitypresentation
open to traffic*A TIMING CHALLENGE2020Fall 20182021202220232020201920172018* -Alaskan Way Viaduct Replacement Program ...
0.00310286274 |
a/85059
judkinspark_tab_oct2017
ramp visibilityOff ramp visibilityOff ramp visibilityOff ramp visibility3I-90 on and off ramps•Short term: better mark crossings and calm ...
0.00310286274 |
a/117626
phase1staffreport
will be evaluated in terms of the visual context of the surrounding neighborhood and other impacts to the community, including ...
0.00310286274 |
a/88164
seattledesigncommission-2021.06.20130thstlightrailstationpresenta ...
-Stationaccesspoints-Paratransitand Bus stoplocations-Traffic analyses-Streetandaccessimprovements•MakesureKCMetrois ...
0.00310286274 |
a/85026
3-0analysis121814
are expected. There is nothing to suggest the volume-based rate of vehicle-to-vehicle collisions would increase under Alternatives 1B and ...
0.00310286274 |
a/87755
presentation20180613
, bulk and scale of structures, character of development, transportation (such as increased vehicle and other traffic, and ...
0.00310286274 |
a/77562
sandpoint-nomination-report
five months and cost $160,000.57 According to a WPA press release, the NAS caused such an increase in traffic and activity ...
0.00310286274 |
a/74280
seattledesigncommission-2019.06.06willowcrossingstreetvacationpre ...
that can house long term and temporary tenants. There is also retail space in ground floor which allow for pedestrian ...
0.00310286274 |
a/86111
project_copper_sdci_mup_comments
this road for Service and Fire Access only, the intent was to reduce theimpact of traffic, noise, light, and glare on the ...
0.00310286274 |
a/77140
2017bikeshareevaluationreport
, vibrant, affordable, and innovative city for all. We value:A Safe CityWe will not accept traffic deaths as an inevitable ...
0.00310286274 |
a/99897
2017_bikeshare_evaluation_report_113018
, interconnected, vibrant, affordable, and innovative city for all. We value:A Safe CityWe will not accept traffic deaths ...
0.00310286274 |
a/99900
sdotbikeshareevaluationreport2017
, interconnected, vibrant, affordable, and innovative city for all. We value:A Safe CityWe will not accept traffic deaths ...
0.00310286274 |
a/100207
sdot bike share evaluation report 2017
, interconnected, vibrant, affordable, and innovative city for all. We value:A Safe CityWe will not accept traffic deaths ...
0.00310286274 |
a/104273
mastec_set
WAY- 25514126-M-158722'73'46' CONTRACTOR NOTES1.PROTECT CURB AND SIDEWALK, RESTORE IF DAMAGED PERCURRENT COS STANDARD ...
0.00310286274 |
a/74166
sdot_gline_oh_boards_print
doors and allow riders to board from both side with new center-running stations (between 9th Ave and 13th Ave)• New ...
0.00310286274 |
a/106222
subareaplanningpresentation_8.8.24
and varying levels of access to capital▶ There is a strong sense of community support among business owners▶ Foot-traffic ...
0.00310286274 |
a/160772