You just searched for:
Search
Filter Results
9001 to 9025 of 11414
pspbminutes_8-2-23
https://www.seattle.gov/documents/departments/neighborhoods/historicpreserv ...
not impede the flow of pedestrian traffic. Movable structural elements that can be brought back against the building wall ...
0.003019525 |
a/152048
pspbminutes_12-7-22
https://www.seattle.gov/documents/departments/neighborhoods/historicpreserv ...
acknowledged that there was a high volume of traffic on this street and a bus stop along the areaway. The applicant also ...
0.003019525 |
a/139593
2012sbcchapter3
https://www.seattle.gov/documents/departments/sdci/codes/seattlebuildingcod ...
, but not be limited to, the follow-ing:Airport traffic control towersAmbulatory care facilities Animal hospitals, kennels ...
0.003019525 |
a/97362
2022_0526_eastlakepbl_factsheet
https://www.seattle.gov/documents/departments/sdot/bikeprogram/eastlake ...
, parking lanes, and sidewalks. Protected bike lanes help: ■Improve safety ■Calm traffic ■Increase ridership ■Maintain ...
0.003019525 |
a/129052
2017opa-0932ccs02-22-18
https://www.seattle.gov/documents/departments/opa/closedcasesummaries/2017o ...
, Criminal Citation, or Traffic Contact Report (TCR).” (SPD Policy 16.090-POL-7.) Here, it is undisputed that video was ...
0.003019525 |
a/82017
route44_construction_notice
https://www.seattle.gov/documents/departments/sdot/transitprogram/tpmc ...
closures• Temporarily relocated bus stops• Traffic delays NE 65TH STNW54THSTEASTGREENLAKEWAYN24THAVENW15THAVENENW LEARY ...
0.003019525 |
a/129058
5e_19-182
https://www.seattle.gov/documents/departments/neighborhoods/participatorybu ...
& markings, traffic control, layout or construction staking as necessary) $65,000 Drainage Costs $7,000 Estimating ...
0.003019525 |
a/78260
7f_19-290
https://www.seattle.gov/documents/departments/neighborhoods/participatorybu ...
Phase Costs $4,500 Design Contingency (10% of Design Phase Subtotal) $500 Total Design Phase Costs $5,000 Construction Phase Construction ...
0.003019525 |
a/78279
capitolhilludfworkshop2orangenotes
https://www.seattle.gov/documents/departments/opcd/ongoinginitiatives/capit ...
Notes of Discussion Related to building facades and design First floor retail along Broadway – retail likes corner (intersection) lots - ...
0.003019525 |
a/86515
administration
https://www.seattle.gov/documents/departments/financedepartment/0910adopted ...
of current radio technology with a new switch for voice and data traffic with consoles for dispatching and managing the ...
0.003019525 |
a/61396
ffd_projects
https://www.seattle.gov/documents/departments/financedepartment/0712propose ...
of the City’s critical computing operations, including the computers that run the financialsystem, all the traffic lights ...
0.003019525 |
a/61190
nationalfreightdevelopmentsfall2015presentation
https://www.seattle.gov/documents/departments/seattlefreightadvisoryboard/n ...
Marine Highway routes. These overlap the principal inland waterways (managed by USACE) on which moves the majority of commercial waterborne ...
0.003019525 |
a/107277
ffd_projects
https://www.seattle.gov/documents/departments/financedepartment/0712adopted ...
computing operations, including the computers that run the financialsystem, all the traffic lights in the City, and public ...
0.003019525 |
a/61121
sprucestsecondonlinesurveyresults-october2020
https://www.seattle.gov/documents/departments/parksandrecreation/projects/s ...
equipment and putting them under shadewherever possible. Option B seems to do these things more.10/24/2020 12:53 PM9This seems like the best ...
0.003019525 |
a/93573
nsngw_construction_notice_100th.aurora_dec2018
https://www.seattle.gov/documents/departments/sdot/greenways/nsngw_construc ...
nsngw_construction_notice_100th.aurora_dec2018 December 2018 Construction at N 100th St and Aurora Ave N will resume as early as January ...
0.003019525 |
a/102139
sbabannualreport2014(0)
https://www.seattle.gov/documents/departments/seattlebicycleadvisoryboard/c ...
Track Complete Streets SDOT Traffic Management Budget UpdateApril 2014 Director’s Introduction (Goran Sparman) Construction ...
0.003019525 |
a/107021
sbabannualreport2014(1)
https://www.seattle.gov/documents/departments/seattlebicycleadvisoryboard/c ...
Track Complete Streets SDOT Traffic Management Budget UpdateApril 2014 Director’s Introduction (Goran Sparman) Construction ...
0.003019525 |
a/107022
sbabannualreport2014
https://www.seattle.gov/documents/departments/seattlebicycleadvisoryboard/c ...
Complete Streets SDOT Traffic Management Budget UpdateApril 2014 Director’s Introduction (Goran Sparman) Construction ...
0.003019525 |
a/107023
2023opa-0015ccs090823
https://www.seattle.gov/documents/departments/opa/closedcasesummaries/2023o ...
the details required by the department’s policy, like lighting, weather, traffic, and roadway conditions, the number of ...
0.003019525 |
a/149851
slis
https://www.seattle.gov/documents/departments/financedepartment/04adoptedbu ...
constructing sidewalks at locations with high pedestrian traffic. SDOT's proposed program plan should include, at a ...
0.003019525 |
a/60632
may2017sbabagenda
https://www.seattle.gov/documents/departments/seattlebicycleadvisoryboard/a ...
may2017sbabagenda SBAB Monthly Meeting Wednesday, May 3, 2017 Seattle City Hall, Room 370 600 4th Avenue, Seattle 6:00 to 8:00 p.m. 6:00 ...
0.003019525 |
a/106939
2021_0322_eastlakepbl_facts
https://www.seattle.gov/documents/departments/sdot/bikeprogram/2021_0322_ea ...
, parking lanes, and sidewalks. Protected bike lanes help: ■Improve safety ■Calm traffic ■Increase ridership ■Maintain ...
0.003019525 |
a/99950
sanctuaryhotelcommentletter_final_20190919
https://www.seattle.gov/documents/departments/neighborhoods/majorinstitutio ...
circulation: “The property’s proximity (within walking distance) to the central campus makes it an ideal location for a hotel use to serve ...
0.003019525 |
a/77590
2017opa-1055ccs04-06-18
https://www.seattle.gov/documents/departments/opa/closedcasesummaries/2017o ...
with NE#2, NE#1 effectuated a traffic stop of the subject vehicle. NE#2 did not come to the scene of the stop, but instead ...
0.003019525 |
a/82076
harborview iac meeting minutes draft 05162024
https://www.seattle.gov/documents/departments/neighborhoods/majorinstitutio ...
Klainer: The EIS (Environmental Impact Studies) document is currently in process. This document summarizes traffic studies ...
0.003019525 |
a/160023
Previous
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
Next