Filter Results

8751 to 8775 of 11414
2022opa-0286ccs-3-7-2023
-minute lunch break. The Complainant noted, since it was Torchlight Saturday and construction on I-5, traffic was heavy. ...
0.003019525 |
a/140864
tab response to levy amendments june 2024
working on tests of road sharing with pedestrians, bikes, buses, and freight in congested corridors while already planning solutions for the ...
0.003019525 |
a/158970
faqs - 5g and small wireless facililties (swf) on seattle poles ...
wireless services are deploying more wireless antennas with smaller coverage areas (“small cells”) and using new spectrum channels to give ...
0.003019525 |
a/137621
2020opa-0511ccs050521
), the North Precinct (his home precinct), the Traffic Section (which tracked some overtime), SPOC (which manages staffing ...
0.003019525 |
a/83381
electionscodeamendments
Voucher)) democracy 10 voucher if the person attempts to traffic in a stolen ((Democracy Voucher)) democracy voucher, 11 ...
0.003019525 |
a/129700
pspbminutes_1-17-24
, constructed in and near the Pioneer Square area, and the traffic and activities that they generate have resulted in ...
0.003019525 |
a/154529
tempwisetermsconditions
APPLICATION TO BE RECEIVED BY UTILITY PILOT PARTIES DUE TO TECHNICAL PROBLEMS, TELEPHONE SERVICE PROBLEMS, PRINTING ERRORS, HUMAN ERRORS, OR ...
0.003019525 |
a/140727
delridgeph1notesthemes
have been working on restoration along the greenbelt  26th Ave SW: Our cars have been hit due to speeding cars – ...
0.003019525 |
a/86696
jac 11-5-24
percentage increased by two points from the previous month. Pike Pine Streetscape Project is about 98% complete. Currently working on ...
0.003019525 |
a/163332
nsngw_construction_notice_100th.aurora_dec2018_updated
nsngw_construction_notice_100th.aurora_dec2018_updated January 2019 Construction at N 100th St and Aurora Ave N will resume as early as ...
0.003019525 |
a/102141
2016opa-0580ccs03-08-17
. The subject was walking in traffic and appeared to be in crisis. Initially contacted by Named Employee #1 and Named ...
0.003019525 |
a/81463
approvedapr112024meetingminutes
Emissions • Study the impacts of locating sensitive uses near additional high-volume traffic roadways beyond freeways. ...
0.003019525 |
a/155720
23rdavecorridorsepadns
23rdavecorridorsepadns SEPA DETERMINATION OF NON-SIGNIFICANCE (DNS) SEATTLE DEPARTMENT OF TRANSPORTATION (SOOT) 23R0 A VENUE CORRIDOR ...
0.003019525 |
a/102743
adopted090716meetingsummary
mentioned that she has learned that Richmond, B.C. has been breaking grid streets to add plantable areas, increase open space and calm ...
0.003019525 |
a/118601
lpbminutes2-21-18
and Social Justice Initiative through design, construction and operations; and, keep it moving to mitigate impacts of ...
0.003019525 |
a/75015
2023opa-0520ccs5-27-24
orders. WS#1 categorized the incident as phase 5 under the crowd management, intervention, and control concepts strategies (CMIC) matrix ...
0.003019525 |
a/158798
capitolhilludfworkshop2greennotes
at E Denny (roadway redesign) there is concern that traffic would go faster as opposed to slower.  Consider a roof over ...
0.003019525 |
a/86512
2018_yvyc_district_7_postcards
Queen AnnePlayfieldNew marked crosswalkNew marked crosswalkUpgrade curb rampsNew curb bulbP.O. Box 34996Seattle, WA 98124-4996We’re calming ...
0.003019525 |
a/103674
fs22-report(0)
Jeremiah Combs Carpenter 178904 AIRFLOW MECHANICAL 373.0 1,399.0 1,772.0 21.1% 21.3% 63.4% Michelle Wilson Sheet Metal Worker 180257 ALTUS ...
0.003019525 |
a/58807
desrptjapaneselangschool
to the southwest and toward Rainer Avenue South, a major traffic arterial connecting the Rainier Valley, the International ...
0.003019525 |
a/76112
desrptjapanese language school
to the southwest and toward Rainer Avenue South, a major traffic arterial connecting the Rainier Valley, the International ...
0.003019525 |
a/76111
japanese-language-school-designation
downhill to the southwest and toward Rainer Avenue South, a major traffic arterial connecting the Rainier Valley, the ...
0.003019525 |
a/76431
edgpacketrequirements
stops, unusual traffic patterns, applicable SDOT Streetscape Concept Plan overlays and design standards, etc.  5.7: Site ...
0.003019525 |
a/98080
fs22-report
180257 ALTUS TRAFFIC MANAGEMENT 0.0 55.0 55.0 0.0% 0.0% 0.0% AMERICA DISASTER SERVICES 0.0 178.5 178.5 0.0% 0.0% 2.2% ...
0.003019525 |
a/58808
psb16620165w
Square area, and the traffic and activities that they generate have resulted in adverse impacts upon the social, cultural, ...
0.003019525 |
a/74200