Filter Results

8726 to 8750 of 14230
checkoutreusereport2021
packaging.There are multiple convenient return locationsin high traffic areas.High accessAccessibility for FSBReusable ...
0.00308650546 |
a/112780
usingspreadsheetmodelsforestimatingcollectioncosts
according to speed limits and distances. These time estimateswere adjusted to consider traffic by determining an ...
0.00308650546 |
a/113303
finalshrrchapter240_updated_10082024_ada
was unanticipated (e.g., the app-based worker’s vehicle breaks down or is in an accident during performance of the offer, road closures or ...
0.00308650546 |
a/177271
rup application v2026 fillable _ada
SAFETY PLAN?(also attach aerial map showing routes, pedestrian/traffic control plans)WHERE SPECIFICALLY WILL YOU NEED TO ...
0.00308650546 |
a/93697
february 2026 levy oversight committee meeting
february 2026 levy oversight committee meeting February 3, 2026Seattle Transportation Levy Oversight CommitteeAgenda•Welcome & Introducing ...
0.00308650546 |
a/177300
q1-2023-sbp-report
, by initiating water infrastructure projects to improve service; and replace failing infrastructure at reduced costs through shared ...
0.00308650546 |
a/143536
q2-2024-sbp-progress-report
costs through shared pavement restoration, mobilization, and traffic control costs. This consists of three different ...
0.00308650546 |
a/163157
q3 2023 quarterly report
, and traffic control costs. This consists of three different investment projects:•Water System Overall Asset ...
0.00308650546 |
a/158750
q3-2024-sbp-progress-report
service; and replace failing infrastructure at reduced costs through shared pavement restoration, mobilization, and traffic ...
0.00308650546 |
a/163954
designpackagedeliverablesfinal
Traffic Control Plans (if necessary) ☐ Final Project permits list with conditions. ☐ FinalGeotechnical Interpretive ...
0.00308650546 |
a/154251
designpackagedeliverables60
Traffic Control Plans (if necessary) ☐ Draft copies of specifications or catalog cut sheets of major elements not covered ...
0.00308650546 |
a/154250
designpackagedeliverables90
Sheet ☐Basis of Design Report ☐Class 1 Capital Cost Estimates. Follow Cost Estimating Guidelines. ☐O&M Cost Estimates developed by the O&M ...
0.00308650546 |
a/154257
8ecoretapprocedures
to the tap location and providing alternate power and alternate water source. 4.2Traffic Control The contractor is responsible for ...
0.00308650546 |
a/154292
9astandardspecificationsforelectricaldesign
and Pull Boxes Subject to Light-Duty Pedestrian Traffic Only: Fiberglass-reinforced polyester resin, structurally tested ...
0.00308650546 |
a/154294
fauntleroy-creek-culverts-replacement-program_faq
will experience more noise, light, road closures, dust, and traffic than usual. SPU will take steps to lessen potential ...
0.00308650546 |
a/153351
queen-anne-site-fact-sheet
tunnelConstruction areaSouth Ship Canal Trail detourSouth Ship Canal TrailWhat to Expect During Construction• Construction-related noise, ...
0.00308650546 |
a/173848
wallingford-site-fact-sheet
-related noise, traffic, dust, and vibrations • Sidewalk closure on the east side of Interlake Ave N• Long-term road ...
0.00308650546 |
a/173849
fremont-site-fact-sheet
Construction• Construction-related noise, traffic, dust, and vibrations• Full closure of NW 36th St between Leary Way NW ...
0.00308650546 |
a/173850
artistic_dividend
the resourcesand amenities she uses for her business andpersonal life are easily accessible, with little,ifany, traffic ...
0.00308650546 |
a/49541
sfab_agenda_may 2025
of Minutes 3. Announcements and Chair’s Report Dan Kelly, SFAB Chair 3:45 4. Opening Public Comment 3:50 5. School ...
0.00308650546 |
a/168930
approved sfab minutes october 2023
workers out of the City, which pedestrian and traffic does. So, I think that should be highlighted a little bit better this ...
0.00308650546 |
a/153908
sfab february 2022 minutes approved
of policy and planning, traffic operations, transit and mobility and urban design, and others that are working on some ...
0.00308650546 |
a/131633
sfab january 2022 minutes approved
, to get out of where we're located, depending on what they do with the Burke-Gilman Trail, we have to cross with the WB67s, three lanes of ...
0.00308650546 |
a/131632
2022-02-23_sbab_e-bikesubsidysupportletter
of Seattle. E-bikes help solve the problems of car traffic and air pollution. They make it easy to climb the hills of the ...
0.00308650546 |
a/100717
2024february7_sbab_minutes
is inadequate for bike traffic coming from the U District on NE 45th St. and wishes to continue to the intersection of Ston ...
0.00308650546 |
a/156435