Filter Results

8676 to 8700 of 11044
seattledesigncommission-2011.06.16fredhutchinsonskybridgeminutes
; and develop bike amenities along Eastlake to make a stronger connection to the campus. Perhaps the public benefit package could include ...
0.003019525 |
a/85636
yvyc-idea-collection-form_english
don’t stop for other cars or pedestrians Turning pocket, traffic circle, signage, channelization, street light CHOOSE AN ...
0.003019525 |
a/78184
6d. 18-695, 15th and market
Phase Construction Costs (include urban forestry, signs & markings, traffic control, layout or construction staking as ...
0.003019525 |
a/78136
drive clean seattle 2019 equity outreach final report.docx
quality. It would also reduce traffic congestion and travel time. Our community have learned from the news that we have ...
0.003019525 |
a/90401
pspbminutes_8-2-23
not impede the flow of pedestrian traffic. Movable structural elements that can be brought back against the building wall ...
0.003019525 |
a/152048
pspbminutes_12-7-22
acknowledged that there was a high volume of traffic on this street and a bus stop along the areaway. The applicant also ...
0.003019525 |
a/139593
2012sbcchapter3
, but not be limited to, the follow-ing:Airport traffic control towersAmbulatory care facilities Animal hospitals, kennels ...
0.003019525 |
a/97362
2022_0526_eastlakepbl_factsheet
, parking lanes, and sidewalks. Protected bike lanes help: ■Improve safety ■Calm traffic ■Increase ridership ■Maintain ...
0.003019525 |
a/129052
2017opa-0932ccs02-22-18
, Criminal Citation, or Traffic Contact Report (TCR).” (SPD Policy 16.090-POL-7.) Here, it is undisputed that video was ...
0.003019525 |
a/82017
route44_construction_notice
closures• Temporarily relocated bus stops• Traffic delays NE 65TH STNW54THSTEASTGREENLAKEWAYN24THAVENW15THAVENENW LEARY ...
0.003019525 |
a/129058
5e_19-182
& markings, traffic control, layout or construction staking as necessary) $65,000 Drainage Costs $7,000 Estimating ...
0.003019525 |
a/78260
7f_19-290
Phase Costs $4,500 Design Contingency (10% of Design Phase Subtotal) $500 Total Design Phase Costs $5,000 Construction Phase Construction ...
0.003019525 |
a/78279
capitolhilludfworkshop2orangenotes
Notes of Discussion Related to building facades and design First floor retail along Broadway – retail likes corner (intersection) lots - ...
0.003019525 |
a/86515
administration
of current radio technology with a new switch for voice and data traffic with consoles for dispatching and managing the ...
0.003019525 |
a/61396
ffd_projects
of the City’s critical computing operations, including the computers that run the financialsystem, all the traffic lights ...
0.003019525 |
a/61190
nationalfreightdevelopmentsfall2015presentation
Marine Highway routes. These overlap the principal inland waterways (managed by USACE) on which moves the majority of commercial waterborne ...
0.003019525 |
a/107277
ffd_projects
computing operations, including the computers that run the financialsystem, all the traffic lights in the City, and public ...
0.003019525 |
a/61121
sprucestsecondonlinesurveyresults-october2020
equipment and putting them under shadewherever possible. Option B seems to do these things more.10/24/2020 12:53 PM9This seems like the best ...
0.003019525 |
a/93573
nsngw_construction_notice_100th.aurora_dec2018
nsngw_construction_notice_100th.aurora_dec2018 December 2018 Construction at N 100th St and Aurora Ave N will resume as early as January ...
0.003019525 |
a/102139
sbabannualreport2014(0)
Track Complete Streets SDOT Traffic Management Budget UpdateApril 2014 Director’s Introduction (Goran Sparman) Construction ...
0.003019525 |
a/107021
sbabannualreport2014(1)
Track Complete Streets SDOT Traffic Management Budget UpdateApril 2014 Director’s Introduction (Goran Sparman) Construction ...
0.003019525 |
a/107022
sbabannualreport2014
Complete Streets SDOT Traffic Management Budget UpdateApril 2014 Director’s Introduction (Goran Sparman) Construction ...
0.003019525 |
a/107023
2023opa-0015ccs090823
the details required by the department’s policy, like lighting, weather, traffic, and roadway conditions, the number of ...
0.003019525 |
a/149851
slis
constructing sidewalks at locations with high pedestrian traffic. SDOT's proposed program plan should include, at a ...
0.003019525 |
a/60632
may2017sbabagenda
may2017sbabagenda SBAB Monthly Meeting Wednesday, May 3, 2017 Seattle City Hall, Room 370 600 4th Avenue, Seattle 6:00 to 8:00 p.m. 6:00 ...
0.003019525 |
a/106939