Filter Results

8451 to 8475 of 11044
23rdavecorridorsepadns
23rdavecorridorsepadns SEPA DETERMINATION OF NON-SIGNIFICANCE (DNS) SEATTLE DEPARTMENT OF TRANSPORTATION (SOOT) 23R0 A VENUE CORRIDOR ...
0.003019525 |
a/102743
adopted090716meetingsummary
mentioned that she has learned that Richmond, B.C. has been breaking grid streets to add plantable areas, increase open space and calm ...
0.003019525 |
a/118601
lpbminutes2-21-18
and Social Justice Initiative through design, construction and operations; and, keep it moving to mitigate impacts of ...
0.003019525 |
a/75015
2023opa-0520ccs5-27-24
orders. WS#1 categorized the incident as phase 5 under the crowd management, intervention, and control concepts strategies (CMIC) matrix ...
0.003019525 |
a/158798
capitolhilludfworkshop2greennotes
at E Denny (roadway redesign) there is concern that traffic would go faster as opposed to slower.  Consider a roof over ...
0.003019525 |
a/86512
2018_yvyc_district_7_postcards
Queen AnnePlayfieldNew marked crosswalkNew marked crosswalkUpgrade curb rampsNew curb bulbP.O. Box 34996Seattle, WA 98124-4996We’re calming ...
0.003019525 |
a/103674
fs22-report(0)
Jeremiah Combs Carpenter 178904 AIRFLOW MECHANICAL 373.0 1,399.0 1,772.0 21.1% 21.3% 63.4% Michelle Wilson Sheet Metal Worker 180257 ALTUS ...
0.003019525 |
a/58807
desrptjapaneselangschool
to the southwest and toward Rainer Avenue South, a major traffic arterial connecting the Rainier Valley, the International ...
0.003019525 |
a/76112
desrptjapanese language school
to the southwest and toward Rainer Avenue South, a major traffic arterial connecting the Rainier Valley, the International ...
0.003019525 |
a/76111
japanese-language-school-designation
downhill to the southwest and toward Rainer Avenue South, a major traffic arterial connecting the Rainier Valley, the ...
0.003019525 |
a/76431
edgpacketrequirements
stops, unusual traffic patterns, applicable SDOT Streetscape Concept Plan overlays and design standards, etc.  5.7: Site ...
0.003019525 |
a/98080
fs22-report
180257 ALTUS TRAFFIC MANAGEMENT 0.0 55.0 55.0 0.0% 0.0% 0.0% AMERICA DISASTER SERVICES 0.0 178.5 178.5 0.0% 0.0% 2.2% ...
0.003019525 |
a/58808
psb16620165w
Square area, and the traffic and activities that they generate have resulted in adverse impacts upon the social, cultural, ...
0.003019525 |
a/74200
2024_0611_beacon15th_generalconstructionnotice_english_businesses ...
, you can expect the following: • We will be working from Monday to Friday, starting at 7:00 A.M. and finishing at 5:00 P.M. • We may need ...
0.003019525 |
a/158192
pspbminutes10-3-18
sidewalk, yet but they want to accommodate existing conditions without changes to traffic; the 419 Occidental project can ...
0.003019525 |
a/74054
edgpacketrequirement
traffic patterns, applicable SDOT Streetscape Concept Plan overlays and design standards, etc.  5.7: Site photos.  5.2 ...
0.003019525 |
a/98079
pre-construction-notice
, and pavement excavation and removal • Dewatering and water treatment systems within right-of-way • Increased construction ...
0.003019525 |
a/113045
uptown-snapshot
housingTransportation• Sound Transit light rail stop in Uptown• Impacts on West Mercer Way from Expedia• Transportation, ...
0.003019525 |
a/72520
9-2015
’t be because of boat traffic, rocks, etc. Maryanne stresses the problem is not that the kids are swimming, but where they ...
0.003019525 |
a/92297
lpb121824walkway62ndavesr
lpb121824walkway62ndavesr Administered by The Historic Preservation Program The Seattle Department of Neighborhoods “Printed on Recycled ...
0.003019525 |
a/163502
appendix2urmoutreachsurveyreport
) Permits, time, and economy Closing of business during retrofit / Keeping business operations running during retrofit / Foot traffi ...
0.003019525 |
a/96853
spu-opportunities_cedareastsidesupplylinereplacement
spu-opportunities_cedareastsidesupplylinereplacement Cedar East Side Supply Line Replacement Project goal This project includes the ...
0.003019525 |
a/160163
spu-opportunities_cedareastsidesupplylinereplacement
spu-opportunities_cedareastsidesupplylinereplacement Cedar East Side Supply Line Replacement Project goal This project includes the ...
0.003019525 |
a/162274
portage_bay_gate_retrofit_dns_addendum
for delivery of the pumping equipment. The barge will exit the site by migrating east, then turning toward the northwest to reach Lake ...
0.003019525 |
a/115298
2022_0718_ballardaveworknotice_final
2022_0718_ballardaveworknotice_final Ballard Ave Mobility and Access Improvements Coming soon: improvements for businesses and people ...
0.003019525 |
a/131498