Filter Results

801 to 825 of 3061
finaldelridgeexistconditionsrpt(0)
▪ Shared lane markings from SW Kenyon Street SW Roxbury Street Where no dedicated bicycle facilities are provided, some people choose to ...
0.00218967139 |
a/106027
sdot
Seattle neighborhoods. In response to community feedback, SDOT will change the street from four lanes to three lanes ...
0.00218967139 |
a/62249
udistrictgreenstreetsconceptplan2015
Roosevelt Way NE and 15th Ave NE. The completed greenway on 12th Ave connects the neighborhood to the ...
0.00218961714 |
a/87838
lpb051822_fp_nom
to: Seattle Landmarks Preservation Board, Seattle Department of Neighborhoods Submitted by: Seattle Parks and ...
0.00218961714 |
a/128196
lpbcurrentnom_freeway_park
to: Seattle Landmarks Preservation Board, Seattle Department of Neighborhoods Submitted by: Seattle Parks and ...
0.00218961714 |
a/127374
skingst_greenway_factsheet_2019
skingst_greenway_factsheet_2019 S KING ST NEIGHBORHOOD GREENWAYJune 2019FACT SHEETThis project is funded ...
0.002189459 |
a/102188
spab minutes may 2020
on Neighborhood Greenways, which are anon-arterial streets that have 20 MPH signage, traffic calming, ...
0.002189346 |
a/99013
18thavebldg v4
buildings in this MIMP, this building most closely abuts neighborhood homes: along the eastern edge of the MIO, it shares a ...
0.00218912959 |
a/77353
childrens_sac_publiccomment_25
over 100 pages and 40 different letters that ALL OPPOSE aspects of the project. Our Laurelhurst neighborhood is under ...
0.00218912959 |
a/77098
ballarddraftudf1_18
and street furniture, public art, building design, neighboring uses, and other factors.Biking: Bicycle connections in the study area are a ...
0.00218912959 |
a/86267
2025_sdot_transportation_levy delivery_plan
, paths, and neighborhood greenways; and maintain and upgrade existing bike lanes Program Cumulative ...
0.00218899734 |
a/165161
sdot_2023adopted_2024endorsed
Spending Expenditures $1,915,000 This change will pay for safety projects on walking and biking routes to school including ...
0.00218899734 |
a/138598
sdot_birt_report_appendices_110220_b
locations approaching Ballard bridge from the south. Active Transportation Connections and Improvements: Investments are planned to connect ...
0.00218896335 |
a/103977
seattle_cctmp04draftfullreport
: • If facility tolling is needed to fund the bored tunnel, what types and levels of mitigation will be needed for Seattle streets and ...
0.00218883832 |
a/99458
adopted060519meetingsummary
(Position # 12 – Public Health) Shari Selch (Position # 13 – Community/Neighborhood) The Urban Forestry Commission was ...
0.00218871073 |
a/118920
23rdavenueactionplanphase3workshophandout
SDOTMetroWork with the community to update and implement Bicycle Master Plan recommendationsMedBike Master PlanPartner with organizations ...
0.00218851469 |
a/86199
2021_annual-levy-report-final
bicycle network continues to expand, with new protected bike lanes and neighborhood greenways opening ...
0.00218851469 |
a/126484
2021_annual-levy-report_revised august 2022
, and much more. Our bicycle network continues to expand, with new protected bike lanes and neighborhood ...
0.00218851469 |
a/132755
lakecity-final-strategicplan-20150331
Safety Corridor Project, Safe Routes to School, and neighborhood greenways. Given that Lake City’s “main ...
0.00218851469 |
a/56579
ballarddraftudflanduseandud
in the study area are a mix on-street bike lanes, and neighborhood greenways. The 2013 Bicycle Master Plan ...
0.00218851469 |
a/86268
reconnectsouthparkalternativesreviewpotentialfatalflaws
of Seattle’s bike network as a Neighborhood Greenway for traveling in both directions. However, while the ...
0.00218851469 |
a/171524
northgate_greenway_factsheet_v3
northgate_greenway_factsheet_v3 NORTHGATE NEIGHBORHOOD GREENWAYRoute OptionsApril 2017FACT SHEETTo learn ...
0.002188505 |
a/102112
olympichills_mailer
GREENWAY: OLYMPIC HILLSWhat’s a neighborhood greenway? Neighborhood ...
0.002188505 |
a/102147
n92ndst_mailer
: EAGLE STAFFWhat’s a neighborhood greenway? Neighborhood greenways are ...
0.002188505 |
a/102099
3-7transportationdeis
physically separated (raised or with an on-street barrier), 6 miles of neighborhood greenway, 78 miles of ...
0.00218824134 |
a/87477