Filter Results

8201 to 8225 of 11044
overview
, street drainage, watermain piping, traffic signal improvements, street lights, in-lane bus stops, urban design and art ...
0.003019525 |
a/60566
psb0605243rdmainartsr
attributes and consequently is an area of great historical and cultural significance. Further, the regional sports stadiums, constructed in ...
0.003019525 |
a/156807
mhc10924_aug24_final
warning, and the ramp slopes and landings are non-compliant. She proposed curb bulb, two standard double ramps 2 or a bisector ramp ...
0.003019525 |
a/154579
water_detail
, replacement, and protection of the water infrastructure affected by the replacement of the Alaskan Way Viaduct and Seawall. The Alaskan ...
0.003019525 |
a/61538
november2021_agenda
Meeting(see bottom of agenda for more information)6:00 PM6:05 PM6:10 PM6:15 PM6:20 PM6:50 PM7:20 PM7:45 PM7:50 PM7:55 PMIntroductionsRemarks ...
0.003019525 |
a/106422
2a_19-63
Construction Costs (include urban forestry, signs & markings, traffic control, layout or construction staking as necessary) ...
0.003019525 |
a/78232
pikeplace-03-11-15-minutes
nine spaces and asked if there was a way to get them inside. Mr. Dickinson said that they have tried overflow in other areas of the Market ...
0.003019525 |
a/73641
approvedsept10meetingminutes
planning staff. Ms. Pintak stated that she has been working with OPCD Equitable Development Initiative staff. • Commissioners recognized ...
0.003019525 |
a/108361
1f_19-43
% of Design Phase Subtotal) $2,100 Total Design Phase Costs $23,100 Construction Phase Construction Costs (include urban forestry, signs & ...
0.003019525 |
a/78226
feb 2023 jac meeting minutes
and will have a lot of hours. Hoffman is looking to higher traffic control laborers, they are prepping their subs to meet ...
0.003019525 |
a/149474
lpbminutes1-4-17
to the change in transportation. Ms. Lentz said the survey talks about changes over time to blocks on either side with the expansion of ...
0.003019525 |
a/74998
dag13_economic_execbriefing_handout
is the free-flow of product from the piers. They make many trips daily to bring product from the pier to their facility. If this ...
0.003019525 |
a/101067
2020opa-0420ccs120720
the freeway and traveling against traffic on one-way streets. At a certain point, SPD supervisors ordered NE#1, NE#2, and ...
0.003019525 |
a/83322
1h. 17-177 delridge community center_1
% of Design Phase Subtotal) incl Total Design Phase Costs $1,000 Construction Phase Construction Costs (include urban forestry, signs & ...
0.003019525 |
a/78045
2015-0188ccs08-21-15
2015-0188ccs08-21-15 Page 1 of 2 Complaint Number OPA#2015-0188 OFFICE OF PROFESSIONAL ACCOUNTABILITY Closed Case Summary Complaint ...
0.003019525 |
a/80924
20200814_freewaypark_ooh_toplinesummary_final
. Session duration | 4 minutes, 14 seconds The average time a user spent viewing the online open house during a session. Device use ...
0.003019525 |
a/93136
spab signal policy letter
signal priority. Counting cars instead of people has a detrimental impact on other modes of traffic. City of Seattle | 600 ...
0.003019525 |
a/103772
belltownsmalllotdevelopmentsepadetermination
future growth scenarios. The amount of additional growth that could result from this proposal would not change the results of these ...
0.003019525 |
a/86386
2014-0699ccs06-03-15
. FINDINGS Named Employee #1 Allegation #1 It is recommended that the named employee’s supervisor spend some time observing how the named ...
0.003019525 |
a/80869
seattledesigncommission-2009.03.05connerhomesminutes
is concerned about traffic, and businesses are concerned parking availability won’t be apparent. Locating the garage ...
0.003019525 |
a/85469
2015-0509ccs10-14-15
2015-0509ccs10-14-15 Page 1 of 2 Complaint Number OPA#2015-0509 OFFICE OF PROFESSIONAL ACCOUNTABILITY Closed Case Summary Complaint ...
0.003019525 |
a/80998
oig_2024consolidated_surveillance_review_1
-emergency telephone calls and police radio traffic for evidentiary and public disclosure purposes.4 Personnel from the ...
0.003019525 |
a/163606
83rdauroraletter_final
and the traffic signal. Please see project map on the back. To accommodate this movement, we’d make the lane connecting ...
0.003019525 |
a/104904
ballard_rpz_folded_mailerweb
traffic generators through signed time limits from which vehicles displaying a valid RPZ permit are exempt. What is the RPZ ...
0.003019525 |
a/103608
approvedoct14minutes
45th Street were eliminated because it would conflict with traffic. Mr. Lewis stated that there is always a delicate ...
0.003019525 |
a/108358