Filter Results

7676 to 7700 of 11044
0504_2021_loc_mayminutes
Ride H project progress. It's great to see this much construction progress while the car traffic in t the area is reduced ...
0.003019525 |
a/99677
seattledesigncommission-2011.03.17activevoicebuildingskybridgemin ...
alcohol there and incorporating anchors for temporary cording.  Think of the alley as a shared street. Refine the alley’s design ...
0.003019525 |
a/85606
notes20180206
and addressed some of the comments and feedback they heard at the last meeting. Ms. Branigan mentioned that SDOT will likely install a ...
0.003019525 |
a/77271
1006_2020_loc_octtminutes
of street closures at Golden Gardens and Lake Washington Blvd. It was very successful and we saw a lot of people using the street and very ...
0.003019525 |
a/99509
nsf_aurorasignal_notice2_081017
on Aurora Ave N at N 92nd St for people walking and biking ■Modify curb ramps as needed at Aurora Ave N and N 92nd St ■Add a median island ...
0.003019525 |
a/103206
add_s_trafficcontrolsigns
”R7 - T3836” x 24”R9 - 3XC36” x 24”R9 - 1124” x 36”R11 - 4D60” x 48”R11 - 2060” x 48”Traffic Control Manual for In-Street ...
0.003019525 |
a/110073
checklistfordeveloperorowner
outside the City). ☐ Submits traffic control plans and obtains approval from SDOT Street Use or other jurisdiction with ...
0.003019525 |
a/113794
summary and key terms
statement (EIS) analyzing the impacts of the OVG proposed project and identified alternatives, including a comprehensive ...
0.003019525 |
a/56451
2017opa-0820ccs02-05-18
OPA’s perspective is the fact that the ticket that was printed from the BAC machine indicating the refusal of the Complainant to provide a ...
0.003019525 |
a/81969
pdoc_board_2019 4-16 minutes
? People are finding SPR through the website mostly; although people are starting to get the information they need directly from Google so ...
0.003019525 |
a/92512
stsc-agenda_2023-7-21
stsc-agenda_2023-7-21 Seattle School Traffic Safety Committee July 21, 2023 In-person location: City Hall, 600 4th ...
0.003019525 |
a/144633
pclia for group 2 911 logging recorder 071019
received by SPD’s 9-1-1 Center as well as all radio traffic between dispatchers and SPD patrol officers. These 2 ...
0.003019525 |
a/117335
may82014approvedminutes
the activation of the space. Commissioner Khouri stated that he would like the Commission to have a discussion regarding the eight lanes ...
0.003019525 |
a/108987
18-2019 columbia park
, traffic control, layout or construction staking as necessary) $ Drainage Costs $ Estimating Contingency (10-20%) $ ...
0.003019525 |
a/78030
desrpt334borenave
, although housing grew denser as blocks were developed.9 Westlake was paved for wagon and auto traffic in 1906, and ...
0.003019525 |
a/75867
psb5-6-15_minutes
: District Rules XIII. SIDEWALK CAFES Sidewalk cafes may not impede the flow of pedestrian traffic. Movable structural ...
0.003019525 |
a/73774
2024-4-29 cpc dkt 795 seattle ntc re tentative agreement w spog
now has flexibility to assign to civilians rather than sworn officers. The areas include low-risk wellness checks, traffic ...
0.003019525 |
a/155843
2017opa-0909ccs030218
“severe” injuries. Moreover, the force used did, in fact, cause more than minor injuries. Further, the argument that the subject may have ...
0.003019525 |
a/82008
february142013approvedminutes
and that they want technology to count the riders as well. Commissioner Borrero noted that bicycle traffic lights are ...
0.003019525 |
a/108580
npsf_2016_fact_sheet
renovations, and minor playground improvements. Examples of street projects include: crossing improvements, such as rapid flashing ...
0.003019525 |
a/78017
2017opa-1309ccs05-05-20
occurred around one month before. The arresting officers conducted a high-risk traffic stop and took the Complainant into ...
0.003019525 |
a/82184
2018opa-1032ccs041019
, and behaved in a concerning manner. The Named Employees memorialized their investigation in a General Offense Report. They also generated ...
0.003019525 |
a/82680
1c. 18-149, near concord elementary
Costs (include urban forestry, signs & markings, traffic control, layout or construction staking as necessary) $ 0 Drainage ...
0.003019525 |
a/78039
2012may10_approvedminutes
of the community center. Commissioner Leighton asked how the Thomas Green Street would be different. Mr. Holmes replied that it would have ...
0.003019525 |
a/108274
2016 student travel survey report
schools send us results, as well as the number of students that participated at each school. The Seattle School Traffic ...
0.003019525 |
a/104883