Filter Results

7526 to 7550 of 13804
2012sebcintro
means (by way of exampleand not limitation, photocopying or recording by or in an information storage retrieval system). ...
0.00220325612 |
a/97125
seattledesigncommission2022.01.20_firestation31_presentationdraft ...
and welcoming as possible.BUILDING DESIGN2.Activate the southern edge of the site and create a visual bridge from Meridian eastward.SITE ...
0.00220325612 |
a/84836
directorsrule_02_2023_display - signed
on the adjoining property. Sales of the displayed goods or wares shall occur on the adjoining privately owned ...
0.00220325612 |
a/137835
2020_0223_tcb_30%designoutreachsummary_submit(0)
-in sessions, conducted community briefings, and gathered survey responses to get feedback throughout early design. Comments and suggestions ...
0.00220325612 |
a/101220
2020_0223_tcb_30%designoutreachsummary_submit
-in sessions, conducted community briefings, and gathered survey responses to get feedback throughout early design. Comments and suggestions ...
0.00220325612 |
a/101226
2020_0223_tcb_30%designoutreachsummary_submit(1)
-in sessions, conducted community briefings, and gathered survey responses to get feedback throughout early design. Comments and suggestions ...
0.00220325612 |
a/101222
sdot director's rule 4-2012
are proposed. The concept plan was prepared with the active participation of City departments and area property owners, ...
0.00220325612 |
a/99209
2021sbcchapter23
be assumed to be spruce-pine-fir stud grade and shall have struc-tural properties assigned in accordance with current ...
0.00220325612 |
a/162711
spu presentation_may_2023_dac meeting - 5.31.23_kh
MIO boundaries increase all MIO-50 to MIO-65. Impacts on properties adjacent tothe MIO boundary, specifically around the ...
0.00220325612 |
a/142859
fapreportchapter5
InfrastructureReview of national policies ensures that the FAP provides the information necessary to help the City and the ...
0.00220325612 |
a/101670
outsidecitywidesouthparkneighborhoodprofile
of the bridge. South Park, the only community in Seattle with Duwamish riverfront property, offers a unique opportunity for ...
0.00220325612 |
a/87317
chw2_boards_web_reduced
WorkshopA converstsation about Crown Hill with Labateyah residents & staff How information is organized today...Place a dot ...
0.00220325612 |
a/86644
lpb042823battelletalarisbp
COLOR CHESTNUTTALARIS MISCELLANEOUS SITE ELEMENTS - ARC / APRIL 28, 2023STREET SIGNAGEWAY FINDING SIGNAGEINFORMATIONAL SIGNAGESIGNAGE / ...
0.00220325612 |
a/141628
lpbcurrentnom_university_bank
BankBank4502 University Way NE 8816400105See 2. Property Data Wells Fargo University Branch University State ...
0.00220325612 |
a/74554
lpbcurrentnom_university_bank
BankBank4502 University Way NE 8816400105See 2. Property Data Wells Fargo University Branch University State ...
0.00220325612 |
a/75683
universitynationalbank_nom_application
State BankBank4502 University Way NE 8816400105See 2. Property Data Wells Fargo University Branch University ...
0.00220325612 |
a/75490
library_narrative
assumptions. Future schedules are to be confirmed as properties are acquired, architect contracts are signed, and project ...
0.0022032077 |
a/60907
library_narrative
library_narrative Library 2006-2011 Proposed Capital Improvement Program -209- Overview of Facilities and Programs Seattle’s libraries ...
0.0022032077 |
a/60957
spl_overview
spl_overview Library 2007-2012 Proposed Capital Improvement Program -239- Overview of Facilities and Programs Seattle’s libraries provide a ...
0.0022032077 |
a/61211
library_overview
library_overview Library 2007-2012 Adopted Capital Improvement Program -245- Overview of Facilities and Programs Seattle’s libraries provide ...
0.0022032077 |
a/61130
april28finalminutes
stated that a developer, who owns much of the site to the east of Northgate, is developing plans to redevelop their ...
0.0022032077 |
a/108411
05-10_spl_adopted_narrative_final
05-10_spl_adopted_narrative_final Library 2005-2010 Adopted Capital Improvement Program -201- Overview of Facilities and Programs Seattle’s ...
0.0022032077 |
a/60797
september11-2008approvedminutes
property, though none of their property would be affected by the proposed amendments. - Commissioner ...
0.0022032077 |
a/109161
05-10_proposed_cip_spl_narrative
05-10_proposed_cip_spl_narrative Library 2005-2006 Proposed Capital Improvement Program -197- Overview of Facilities and Programs Seattle’s ...
0.0022032077 |
a/60859
lpb9-2-15-minutes(0)
and concrete will replace concrete stairs; stairs will be shifted one tread westward to get the required handrail extensions within the ...
0.0022032077 |
a/74700