You just searched for:
Search
Filter Results
51 to 75 of 2653
Fort Lawton Landmark District
http://www.seattle.gov/neighborhoods/historic-preservation/historic-distric ...
Fort Lawton Landmark District Fort Lawton originally occupied much of Seattle's Magnolia Bluff, which offers a commanding view of the ...
0.004390263 | 20260116T22:03:45
x135910
Harvard-Belmont Landmark District
http://www.seattle.gov/neighborhoods/historic-preservation/historic-distric ...
Harvard-Belmont Landmark District Located on the west slope of Capitol Hill, the Harvard-Belmont Landmark District is significant to the ...
0.004390263 | 20260116T22:04:12
x135911
2024 Find of the Month Archive
http://www.seattle.gov/cityarchives/exhibits-and-education/find-of-the-mont ...
Finds of the Month from 2024, highlighting interesting, important, and odd items from our collection. Topics include atomic testing, goats, ...
0.004390263 | 20260116T22:04:17
x154853
Director's Rule 5-276
http://www.seattle.gov/city-finance/about-city-finance/directors-rules/dire ...
How the business license tax applies to constructing and repairing of new or existing buildings or other structures upon real property, ...
0.004390263 | 20260116T22:03:58
x144601
Director's Rule 5-481
http://www.seattle.gov/city-finance/about-city-finance/directors-rules/dire ...
This rule provides an overview of the taxation of motor carriers and trucking activities within the City of Seattle as of July 1, 2002. ...
0.004390263 | 20260116T22:04:23
x144662
Magnuson Park Play Area Renovation
http://www.seattle.gov/parks/about-us/projects/magnuson-park-play-area-reno ...
This improvement project consists of four elements. The play area improvements, restroom construction, and demolition of a damaged restroom ...
0.004390263 | 20260116T22:04:40
x144364
Green Building Standard - Applications
http://www.seattle.gov/sdci/permits/green-building/green-building-standard- ...
Gives additional development capacity in specific zones in exchange for meeting green building requirements. Applications In order to ...
0.004390263 | 20260116T22:04:07
x125686
2018_sfc_2021_01_15
http://www.seattle.gov/documents/departments/fire/business/fire code and ...
permit fees.))[S][A] 106.((4))3 Related fees. The payment of the fee for the construction, alteration, removal or ...
0.00241072429 |
a/64288
northlot_phase1_dwgs
http://www.seattle.gov/documents/departments/neighborhoods/historicpreserva ...
DURING DEMOLITION WORK.14. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PERMITS (EXCLUDING SDCI DEMO ...
0.00240096683 |
a/75373
sccmimpprelimdrafteisappendixgeologichazardsandecareviewreport202 ...
http://www.seattle.gov/documents/departments/neighborhoods/majorinstitution ...
been excavated and then placed in a new location, or imported soil that has typically been placed to regrade and shape the land. It may also ...
0.002398552 |
a/138073
2008electricalcodereplacementpages
http://www.seattle.gov/documents/departments/sdci/codes/2008electricalcoder ...
the Period of Construction. Temporary electric power and lighting installations shall be permitted during the period of ...
0.00238805 |
a/96412
oneseattleplancouncilbill120993signedlegislation
http://www.seattle.gov/documents/departments/opcd/seattleplan/oneseattlepla ...
, and how to request a 11 reconsideration of a Street Use permit decision. If the proposal is abutting a residentially ...
0.00236765179 |
a/176381
2014standardspecifications
http://www.seattle.gov/documents/departments/spu/construction-resources/sta ...
process. All water used in the Hydro-Demolition process shall be potable. Stream or lake water will not be ...
0.00236690743 |
a/113664
2023-standard-specifications
http://www.seattle.gov/documents/departments/spu/construction-resources/sta ...
is not permitted. All bridge drains and other outlets within 100 feet of the Hydro-Demolition machine must ...
0.00236067618 |
a/140217
proposed-city-of-seattle-2026-draft-standard-specifications
http://www.seattle.gov/documents/departments/spu/construction-resources/sta ...
All water used in the Hydro-Demolition process must be potable. Stream or lake water is not permitted. 14 ...
0.00235989 |
a/174962
2011_standard_specifications
http://www.seattle.gov/documents/departments/spu/construction-resources/sta ...
by private parties at their own expense under authority granted by ordinance of the City Council or by permit from the ...
0.00235763937 |
a/113660
treeregsconstitutentemailsthrough011320v2
http://www.seattle.gov/documents/departments/urbanforestrycommission/resour ...
’s time may have finally run out. They have their demolition and construction permits and "No Parking ...
0.00235714857 |
a/119478
2020_standard_specifications
http://www.seattle.gov/documents/departments/spu/construction-resources/sta ...
production rate of 250 square feet per hour during the deck scarifying process. All water used in the Hydro-Demolition ...
0.00235644123 |
a/113678
2017standardspecifications
http://www.seattle.gov/documents/departments/spu/construction-resources/sta ...
scarifying process. All water used in the Hydro-Demolition process must be potable. Stream or lake water is not ...
0.00235623121 |
a/113668
2008standardspecs
http://www.seattle.gov/documents/departments/spu/construction-resources/sta ...
in preparing for and aiding with the administration of the Contract. 1. A method of removal and/or demolition plan and ...
0.00235183164 |
a/113657
bgt_shilshole_hazmat_final
http://www.seattle.gov/documents/departments/sdot/bikeprogram/bgt/bgt_shils ...
and replaced should there be a need to conduct a cleanup beneath the site associated with adjacent or upgradient properties. Any structures ...
0.00235086749 |
a/100471
ordinance127375and127376
http://www.seattle.gov/documents/departments/sdci/codes/ordinance127375and1 ...
without a valid short-term rental operator license issued pursuant to this Chapter 6.600. A short-term rental operator license ...
0.0023496428 |
a/176921
adoptedufcmeetingnotes010820
http://www.seattle.gov/documents/departments/urbanforestrycommission/2020/2 ...
Hi, It looks like the Tulip Tree’s time may have finally run out. They have their demolition and construction ...
0.00234450167 |
a/119028
adopted100219meetingsummary
http://www.seattle.gov/documents/departments/urbanforestrycommission/2019/2 ...
on site, including at least two exceptional Western red cedar trees that are close to the existing building which has been given a ...
0.00234113564 |
a/118927
4213-dunn-phaseiesa
http://www.seattle.gov/documents/departments/fas/realestateservices/propert ...
:Description:Improvement of existing building, including tenant improvements, demolition of portion of existing buidling, ...
0.00233929977 |
a/59362
Previous
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
Next