Filter Results

6701 to 6725 of 15204
ovg seattle center - part 2 of responses to city follow-up ...
historic tax credits into $50M of capital funds, the anticipated timing of the funds, and alternative funding plan if less  ...
0.002215416 |
a/56269
meetingsummary5pioneersquare
meetingsummary5pioneersquare ...
0.002215416 |
a/56503
seattledesigncommission-2003.11.20southwestlibraryadditionminutes ...
seattledesigncommission-2003.11.20southwestlibraryadditionminutes APPROVED MINUTES OF THE MEETING 20 November 2003 Projects ...
0.002215416 |
a/85327
desrptwayne apartments
Landmark based upon satisfaction of the following standards for designation of SMC 25.12.350: C. It is associated in a ...
0.002215416 |
a/76308
faqs - 5g and small wireless facililties (swf) on seattle poles ...
? .................................................... 3 Why did the City adopt design standards for wireless technology? ...
0.002215416 |
a/149330
11.19.2021_sbtboard_meeting_notes_final
to cancel the December meeting and extend the January meeting to hold a planning retreat. FOLLOW-UP ACTION ITEMS # ITEM ...
0.002215416 |
a/116940
secmeetingminutes010820
side since organizers plan on it with a safety plan o SPD – Ice will completely eliminate motors; ...
0.002215416 |
a/110187
inroduction
of the Capital Facilities Element of Seattle’s Comprehensive Plan by providing detailed information on the capacity impact ...
0.002215416 |
a/61088
seattledesigncommission-2007.05.03bikemasterplanminutes
seattledesigncommission-2007.05.03bikemasterplanminutes ff MINUTES OF THE MEETING May 3, 2007 Projects Reviewed ...
0.002215416 |
a/85397
annexiv.esf01.2018-final
............................................................................................... 3-1 Planning Assumptions ...
0.002215416 |
a/57028
madison_corridor_brt_existingconditionsmultimodal_dec2014
(a standard bike lane) on 12th Avenue, which crosses through the intersection of East Madison Street, East Union Street, ...
0.002215416 |
a/106184
front_end
by other jurisdictions or institutions. The CIP fulfills the budgeting and financing requirements of the Capital Facilities Element of ...
0.002215416 |
a/61060
lgbt-workplan-2015
implementation of accepted recommendations Work Plan Item: Communications Plan Work First Quarter Work ...
0.002215416 |
a/71939
lgbt-2015-work_plan
implementation of accepted recommendations Work Plan Item: Communications Plan Work First Quarter Work ...
0.002215416 |
a/107764
ic_minutesjannov2023
was pleased with the results of the evaluation, especially the scores from the investment advisory committee. Annual Investment Review and ...
0.002215416 |
a/153178
spc-comp-plan-amendmets-comment-letter-finaldraft-formatted-for-l ...
affordability. Of particular concern are those amendments that add bureaucratic hurdles to the production of more homes such as: ▪ design ...
0.002215416 |
a/172576
appxa_existingbridgecondition
– Bicycles Eric Tweit - Planning HNTB PROJECT TEAM HNTB Corporation – Management, Structure Engineering and Traffic ...
0.002215416 |
a/101036
lander_socialej
, and traffic detours in an effort to minimize impacts on the surrounding community. Specific measures would be established as part of the ...
0.002215416 |
a/100930
2021sebcintroduction
principles of openness, transparency, balance, due pro-cess and consensus, the principles embodied in OMB Circular A-119, which governs the ...
0.002215416 |
a/162615
question102-actionstakenpursuanttos4f
Permit (Permit), including Appendix 13 – Adaptive Management Requirements. Appendix 13 of the Permit requires adaptive management response ...
0.002215416 |
a/168184
upcoming_opps_2019_1
utility verification and potholing • Plans per City of Seattle Standards • WSDOT Channelization ...
0.002215416 |
a/99796
oneseattleplanzoningupdatepresentation_10.24.24
oneseattleplanzoningupdatepresentation_10.24.24 ONE SEATTLE PLAN ANTI-DISPLACEMENT FRAMEWORK ENGAGEMENT1ZONING UPDATEWhat ...
0.002215416 |
a/162842
rdhctpurposeandneed11-12-2015final
................................................................................................................... 2-3 Figure 3. Bicycle ...
0.002215416 |
a/106338
seattle design commission - 2013.06.20 4755 fauntleroy ...
Fauntleroy Way SWTHIS PAGE LEFT INTENTIONALLY BLANKContents Project Overview 4 Triangle Plan Goals 5 Response to ...
0.002215416 |
a/85281
seattledesigncommission-2013.06.204755fauntleroypresentation
Way SWTHIS PAGE LEFT INTENTIONALLY BLANKContents Project Overview 4 Triangle Plan Goals 5 Response to Design ...
0.002215416 |
a/84711