Filter Results

6576 to 6600 of 14263
2012seattlefirechapter10
andpedestrian traffic areas in parking garages in accor-dance with Section 406.4.1 of the InternationalBuilding ...
0.00308980537 |
a/97568
2018_0710_glp_n80thst_factsheet_final
. N 80th St is a high-traffic east-west throughway for people driving and accessing I-5 and Aurora Ave N. We want to keep ...
0.00308980537 |
a/102925
nsf_ballot_d7
# 2019-168Thorndyke Bus StopsProject Type: Sidewalk, ADA Ramps, and Bus Stop ImprovementsProject # 2019-97Park2Park GreenwayProject Type: ...
0.00308980537 |
a/103284
q3 2022 levy report
Ave S & CheastyBlvd SSafe Routes•Rebuiltthe traffic signal at 6th Ave and University St, installed a new ...
0.00308980537 |
a/136485
spd_2023adopted_2024endorsed
Expenditures $1,000,000 This CBA adds $1 million of School Safety Traffic and Pedestrian Improvement (SSTPI) Fund in ...
0.00308980537 |
a/138558
1stavenw_greenway_construction_folded_mailer
LakePlayfieldNEIGHBORHOOD GREENWAY DESIGN ELEMENTSNeighborhood greenways can include:• 20 mph speed limit signs• Speed humps to calm ...
0.00308980537 |
a/163127
1stavenw_greenway_construction_folded_mailer
LakePlayfieldNEIGHBORHOOD GREENWAY DESIGN ELEMENTSNeighborhood greenways can include:• 20 mph speed limit signs• Speed humps to calm ...
0.00308980537 |
a/163283
6 - q1 2023 report
Stevens Elementary School.•Made two traffic spot improvements including a new guard rail on Baker Ave NW south of NW 53rd ...
0.00308980537 |
a/143161
cos_drafteisreview_presentation
transit reroutes•Diversion traffic•Streetcar impacts•I-5 ramps•Garbage, recycling •Emergency servicesImpacts to regional ...
0.00308980537 |
a/127720
wsble_deisreview_slides
reroutes•Diversion traffic•Streetcar impacts•I-5 ramps•Garbage, recycling •Emergency servicesImpacts to regional facilities ...
0.00308980537 |
a/127328
donarmeni_20210621-spn-2021nwp-final16-regionalcond-rev3
zones or restricted areas designated in 33 CFR part 334, Federal navigation channels, shipping safety fairways or traffic ...
0.00308980537 |
a/92254
seattle 2020 bike share permit requirements 2.5
. on or blocking access to a moving bridge, active rail line, or rail crossing; 8. in a manner that hides from view or interferes with the ...
0.00308980537 |
a/103087
2020_q2_levyreport_0708_2020_final
9-12 3 2 5 3 Crosswalks Repainted 1,500 0 0 0 3 Arterial Lane-miles Repainted 560 0 0 0 4 New traffic signals 3-4 1 0 ...
0.00308980537 |
a/99568
2020_q2_levyreport_0708_2020_final(0)
projects 9-12 3 2 5 3 Crosswalks Repainted 1,500 0 0 0 3 Arterial Lane-miles Repainted 560 0 0 0 4 New traffic ...
0.00308980537 |
a/99567
rhctconceptdescriptionevaluation
Bridge is raised. Heavy southbound left turn traffic at Fuhrman with short turn lane and short green time. Insufficient ...
0.00308980537 |
a/106344
roosevelt hct targeted investment concept and evaluation summary
congestion when University Bridge is raised. Heavy southbound left turn traffic at Fuhrman with short turn lane and short ...
0.00308980537 |
a/117664
2005-2006_proposed_tab_1
-26- Figure 1. 2004-Revised General Subfund Revenue Forecast by Source - $665.8M Sales Taxes, 19%Property Tax, 30%B&O Tax, 17%Utility ...
0.00308980537 |
a/60745
seattle_bike_share_permit_requirements_2.3
crossing; 8. in a manner that hides from view or interferes with the effectiveness of an official traffic-control device or ...
0.00308980537 |
a/100222
mlkpbl_spring2021_outreachsummary_final
with a detectable strip between cyclists and pedestrians • This path will be separated from vehicle traffic by a concrete ...
0.00308980537 |
a/100612
presentation20180530_1
(significant setbacks, major arterials, topographic breaks, and similar features) which provide a transition in scale;3)Location and design ...
0.00308980537 |
a/76690
sdotwmbeannualreport _2015
Streetcar Extension and the Mercer West project.The small firm began in 2012 as a traffic analysis and ...
0.00308980537 |
a/99775
sdotwmbeannualreport_2015
Streetcar Extension and the Mercer West project.The small firm began in 2012 as a traffic analysis and ...
0.00308980537 |
a/99453
wmbe-annual-report-2015
Extension and the Mercer West project.The small firm began in 2012 as a traffic analysis and traffic ...
0.00308980537 |
a/99827
pikepineconservationdistrictreportandguidelines
the potential to provide a more intimate pedestrian experience; their narrowness discourages most vehicular traffic, and is ...
0.00308980537 |
a/87327
jpstationareaplanning_resultssummary_draft_2017-08
parking in the neighborhoods. (3, 1.2*)10. Relieve car traffic congestion on Massachusetts St. (3, n/a)May 3 workshop at ...
0.00308980537 |
a/103917