Filter Results

6026 to 6050 of 11044
20160318notice
will continue to receive normal sewer services during the project. However, you can expect: • On 14th Avenue S, traffic ...
0.00302357 |
a/114356
2018opa-1065ccs042419
Employee (NE#1) in this case conducted a traffic stop. The driver was not able to produce valid proof of insurance and had ...
0.00302357 |
a/82696
highlandpark_speedhumps_postcard
and cushions to reduce speeds and calm traffic. This work is expected to start as early as 6/22/2020 and is scheduled to be ...
0.00302357 |
a/106856
parkletsandstreateriesfaq
hosts and nearby businesses have experienced an increase in foot traffic and an increase in sales due to the installation ...
0.00302357 |
a/104237
2012augustnewsletter
), governmental affairs, land use, environmental protection, labor and employment, and contracts/utilities. The Criminal Division ...
0.00302357 |
a/50239
15jan12_pr_rewritingprostitutionnarrative
torts (claims), governmental affairs, land use, environmental protection, labor and employment, and contracts/utilities. The Criminal ...
0.00302357 |
a/50434
2017opa-1151ccs03-31-18
On the date in question, Named Employee #1 (NE#1) conducted a traffic stop of the Complainant’s vehicle. The stop was ...
0.00302357 |
a/82114
psbminutes2-5-20
like in other areas. He said this is on Occidental Mall so there is no thru traffic so there are not the same weight ...
0.00302357 |
a/74229
2019opa-0119ccs073019
) was on routine patrol. NE#1 reported that he paced the Complainant driving his vehicle between the speed of 40-42 mph on a 30-mph roadway ...
0.00302357 |
a/82798
2019opa-0442ccs11-28-19
to step off of his bicycle for officer safety. He told the Complainant that, because this was a traffic stop, he did not ...
0.00302357 |
a/82929
aurora-lictonsprings_redesign postcard
aurora-lictonsprings_redesign postcard Traffic Diversion Planned for Fremont Ave N at N 105th St!SDOT has designed ...
0.00302357 |
a/153383
udistricteisscopingsummary
of increased traffic for all three alternatives  Conduct full level-of-service analysis for all alternatives  Base ...
0.00302357 |
a/87830
smc21_water_code_checklist
(for example: traffic, equipment, operation, other)? The proposed non-project action would not be affected by noise. ...
0.00302357 |
a/113159
desrpt_elephantcarwashsign
was its bypass routing, intended to move most of the highway traffic past rather than into the city center. This effort ...
0.00302357 |
a/165773
desrpt_woodin
Avenue South exit off Interstate 5 brought traffic from the elevated highway into Georgetown toward East Marginal Way S and ...
0.00302357 |
a/163374
secmeetingminutes111021
. Tom Heun SFD Seattle Police Department Lt. Daniel Nelson SPD Operations Lt. Bryan Clenna SPD Traffic Special Events ...
0.00302357 |
a/110211
2017_65thoverviewmap
buttons, crosswalks, and curb rampsPROJECT MAPVision Zero is our plan to end traffic deaths and serious injuries by 2030. ...
0.00302357 |
a/106672
65thdropinsessionsprojectoverviewdisplayboard
with bike and pedestrian push buttons, crosswalks, and curb rampsPROJECT MAPVision Zero is our plan to end traffic deaths ...
0.00302357 |
a/106702
seawallreports2015-08
% Traffic Control Stripers 0.0 700.0 700.0 0.0% 15% Trades with inactive or no state apprenticeship program Divers and ...
0.00302357 |
a/58910
seawallreports2014-07
% 15% 0.0 Traffic Control Stripers 0.0 700.0 700.0 0.0% 15% 105.0 Trades with inactive or no state apprenticeship program ...
0.00302357 |
a/58896
2a. 17-235, 4th ave s between east marginal way and michigan
approves project ☐ Yes ☒ Yes, with revisions ☐ No Comments: This block of 4th Ave S is an arterial street with a high volume of freight ...
0.00302357 |
a/78059
2018opa-1047ccs03-26-19
to have failed to stop at the red traffic light. His vehicle pulled into the intersection and in front of Driver 2. This ...
0.00302357 |
a/82689
capitolhilllightrailstationsitesdirectorsreport
vehicle traffic, while another spoke to including two-way traffic. Comments received reinforced ...
0.00302357 |
a/86488
desrptsandpoint
, which would be completed by June 1939, provided employment to 163 people over five months and cost $160,000.57 According to a WPA press ...
0.00302357 |
a/76228
sandpoint-designation-report
)." The project, which would be completed by June 1939, provided employment to 163 people over five months and cost $160,000.57 According ...
0.00302357 |
a/74277