You just searched for:
Search
Filter Results
5876 to 5900 of 6125
4.2017-11-03_annexiv.incidentoperationsdocumentation-winterstorm( ...
http://www.seattle.gov/documents/departments/emergency/plansoem/4.2017-11-0 ...
to occupy; • Yellow = limited use of the structure permitted; • Green = structure is safe to use without limitations; and ...
0.00219842652 |
a/57017
4.2017-11-03_annexiv.incidentoperationsdocumentation-winterstorm
http://www.seattle.gov/documents/departments/emergency/plansoem/4.2017-11-0 ...
to occupy; • Yellow = limited use of the structure permitted; • Green = structure is safe to use without limitations; and ...
0.00219842652 |
a/57018
4.2017-11-03_annexiv.incidentoperationsdocumentation-winterstorm( ...
http://www.seattle.gov/documents/departments/emergency/4.2017-11-03_annexiv ...
to occupy; • Yellow = limited use of the structure permitted; • Green = structure is safe to use without limitations; and ...
0.00219842652 |
a/56707
general_government
http://www.seattle.gov/documents/departments/financedepartment/1217proposed ...
stations and design and permitting work on fourteen stations. In addition, nine interim fire station projects will be ...
0.00219842652 |
a/61919
5aenclosure2
http://www.seattle.gov/documents/departments/ethicselections/agendas and ...
as permitted by law” (Page 13, 2014 Campaign Finance Manual for the Public Financing of Campaigns, here: ...
0.00219842652 |
a/129985
south park home zone survey_spanish_final
http://www.seattle.gov/documents/departments/sdot/bridgestairsprogram/west ...
a continuación, basándonos en la colaboración con la comunidad de South Park a través de dos caminatas por el vecindario y tres reuniones ...
0.00219842652 |
a/101509
south park home zone survey_spanish_final
http://www.seattle.gov/documents/departments/sdot/projectsandprograms/home ...
a continuación, basándonos en la colaboración con la comunidad de South Park a través de dos caminatas por el vecindario y tres reuniones ...
0.00219842652 |
a/104034
appd_mha_deis_2017
http://www.seattle.gov/documents/departments/hala/policy/mha_eis/appd_mha_d ...
categories that allow greater lot coverage. The analysis will consider LiDAR data and past permit data. Measures to ...
0.00219842652 |
a/65015
appd_mha_feis_2017
http://www.seattle.gov/documents/departments/hala/policy/mha_feis/appd_mha_ ...
categories that allow greater lot coverage. The analysis will consider LiDAR data and past permit data. Measures to ...
0.00219842652 |
a/65055
seattledesigncommission-2006.06.20alaskanwayviaductandseawallminu ...
http://www.seattle.gov/documents/departments/opcd/designcommission/projecta ...
Avenue, 19th Floor Seattle, WA 98124-4019 phone 206/233-7911 fax 206/288-7883 printed on recycled paper Revised ...
0.00219842652 |
a/85384
arts
http://www.seattle.gov/documents/departments/financedepartment/22adoptedbud ...
in lower than projected, ARTS will have a sizeable operating reserve to rely on. The 2021 Adopted Budget included legislation to ...
0.00219842652 |
a/127213
oig_ 2026 work plan
http://www.seattle.gov/documents/departments/oig/annual/oig_ 2026 work ...
de-prioritized stopping individuals for the following violations:• Registration of vehicles;• Temporary registration ...
0.00219842652 |
a/176061
4169_preliminaryreport
http://www.seattle.gov/documents/departments/fas/realestateservices/propert ...
would be an apartment developer. The property is considered to be adequate to accommodate most permitted development ...
0.00219842652 |
a/59311
spl
http://www.seattle.gov/documents/departments/financedepartment/21adoptedbud ...
are eligible to serve two five-year terms. The Revised Code of Washington (RCW 27.12.240) and the City Charter (Article ...
0.00219842652 |
a/63487
sit
http://www.seattle.gov/documents/departments/financedepartment/19proposedbu ...
(CIP): • Criminal Justice Information System: Revises funding for replacement of the Municipal Court Information System to ...
0.00219842652 |
a/63227
seattledesigncommission-2008.12.04southeastseattletransportations ...
http://www.seattle.gov/documents/departments/opcd/designcommission/projecta ...
this design is. The Commission recommends revising the three-room concept because the middle room does not appear to be ...
0.00219842652 |
a/85460
2023opa-0256ccs11-6-23
http://www.seattle.gov/documents/departments/opa/closedcasesummaries/2023op ...
device. 1 SPD revised its policies to allow the use of stop sticks effective on the date of this incident, May 19, 2023. ...
0.00219842652 |
a/153719
spr_2530proposedcip
http://www.seattle.gov/documents/departments/financedepartment/2530proposed ...
is adjusted to align with the revised spending projections. Section 4: 2025-2030 CIP Highlights SPR’s 2025-2030 Proposed ...
0.00219842652 |
a/160789
transitservicefundingagreement
http://www.seattle.gov/documents/departments/transit/transitservicefundinga ...
that revisions to the reported data may be required each year through closeout based on direction to Metro Transit from the ...
0.00219842652 |
a/117530
transit service funding agreement
http://www.seattle.gov/documents/departments/stbd/transit service funding ...
that revisions to the reported data may be required each year through closeout based on direction to Metro Transit from the ...
0.00219842652 |
a/116658
lpb090325seattlecenterplayhouseexhallagmt
http://www.seattle.gov/documents/departments/neighborhoods/historicpreserva ...
. If the CHPO disapproves such alterations, the Owner may submit revised materials to the CHPO, or submit in accordance ...
0.00219842652 |
a/172520
seait
http://www.seattle.gov/documents/departments/financedepartment/19adoptedbud ...
Improvement Program (CIP): • Criminal Justice Information System: Revises funding for replacement of the Municipal Court ...
0.00219842652 |
a/63155
bgt_shilshole_parking_final
http://www.seattle.gov/documents/departments/sdot/bikeprogram/bgt/bgt_shils ...
. Now, upon remand by the King County Superior Court, SDOT has revised its description of the project to include Shilshole ...
0.00219842652 |
a/100473
11-22-17-report
http://www.seattle.gov/documents/departments/homelessness/11-22-17-report.p ...
for Tent City 5, which was required to relocate after its two-year permit expired at its previous site. • We are actively ...
0.00219842652 |
a/65867
indicators_report(0)
http://www.seattle.gov/documents/departments/tech/indicators_report(0).pdf
Officer, City of Seattleand measurement of these indicators will mature as they are applied and modified by others. Whileseeking as much ...
0.00219842652 |
a/117129