Filter Results

5701 to 5725 of 5731
crp-charter-proposedamendments-3-13-23
in accordance with the latest edition or revision of Robert's Rules of Order, except as otherwise provided in this Charter. ...
0.002186792 |
a/139900
q3_2019strategicbusinessplanupdatereport
Center: Permitting a temporary sewer grit transfer facility was postponed due to concerns that additional loading on the ...
0.002186792 |
a/112184
sbp_future_delivery_metrics_2020-09-14
service delivery across all SPU LOBs and branches:•15 metrics are being considered for the reporting.•We will continue reviewing and ...
0.002186792 |
a/112243
spu_sbp_appendixa_accountabilityandperformance_councilsubmittal
regulations Regulations met Meet National Pollutant Discharge Elimination System (NPDES) permit requirements for ...
0.002186792 |
a/112325
crp-presentations-05-10-21
Basis of Design Report was finalized in February of this year. Final design and permitting will go through 2022 with ...
0.002186792 |
a/112118
q1_2024_sbp_progress_report
components fit on the site.Cedar Falls:The revised site plan has been created and reviewed with end-users for operational ...
0.002186792 |
a/157137
20100707m
on revisions to findings if time permits. It was suggested that we contact NACOLE to see if they have ...
0.002186792 |
a/53612
seattle-annual-solid-waste-report-2024
recycling and composting. Several opportunities to improve the methodology have been identified and are being evaluated. The ...
0.002186792 |
a/174416
cip_cen
, lighting, landscaping, and furnishings. We plan to complete design and permitting in 2026 and then phase construction ...
0.002186792 |
a/178175
redliningaudiotranscripts
their policies, only as far as they will permit us to do so. And I think the city is in even deeper trouble than when we ...
0.002186792 |
a/50025
cheasty south trails_year1_q3_monitoring report
fencing, drainage modifications etc. SPR is installing new gravel along the Cheasty Boulevard trail. Rerouting of the Red Cedar trail is ...
0.002186792 |
a/164675
cheasty south trails_year1_q2_monitoring report
for South Loop was removed and a new North Loop construction sign installed along Cheasty Blvd.  Rerouting of the Red Cedar trail is ongoing ...
0.002186792 |
a/164676
northgateregionalcenterdraftplanappendix05_transportationreport
waivers are permitted along Major Pedestrian Streets. • Require protected bike parking • Establish a payment in lieu of ...
0.002186792 |
a/178279
cf-320274-fhdr5
cf-320274-fhdr5 City of Seattle Edward B. Murray, Mayor • Finance and Administrative Services . Fred Podesta, Director Page: 1 of 4 ...
0.002186792 |
a/136977
cf-320021-09.1-2016
Eligibility, Procedures and Awardee Requirements (Revised 10/17/2016) Type of Rule: Code Interpretation Ordinance ...
0.002186792 |
a/137026
mhc08132025min
; information about proposed co-owners. Additional relevant information: Zone 2, street 3 level, Food (a-e) and Retail (a-d) uses ...
0.002186792 |
a/178873
2004commercialandselfhaulwastestreamscompositionstudy
, the component categories were revised since the 2000 study (Appendix A). Substream Definition For any specific geographic ...
0.002186792 |
a/112513
2017-09 hate crimes ph2_final
• Marital Status • Political Ideology • Age • Parental Status Maximum: the maximum sentence allowed under the Revised Code ...
0.002186792 |
a/50559
psb20260304min
or substantially alter any existing sign or erect or place any new sign or change the principal use of any building, or any portion of a ...
0.002186792 |
a/179276
rfq_rfp_cwa_
into communities through Priority Hire Zip Codes.•Cost of construction of affordable housingoWages and benefits/fringes.oConstruction ...
0.002186792 |
a/176339
2023opa-0487ccs6-2-24_remediated
have asked further questions from CM#1, CM#2, or CM#3 to establish how recently CM#1 had driven and whether she was impaired. NE#1 did not ...
0.002186792 |
a/179622
lpb041526sunsethillcommunityhallagmt
that such alterations proposed in the Certificate of Approval application are not consistent with the purposes of SMC 25.12, the CHPO will ...
0.002186792 |
a/179664
council_forecast_presentation_9-27-07(0)
market•Impact of slower national economy•Boeing expected to continue hiring through 2008Recent changes to regional forecast•Very modest ...
0.002186792 |
a/63898
council_forecast_presentation_9-27-07
market•Impact of slower national economy•Boeing expected to continue hiring through 2008Recent changes to regional forecast•Very modest ...
0.002186792 |
a/63899
4-19-10_council_presentation
of Building Permits Issued by DPDNote: Data are six month moving averages of monthly values.Puget Sound Region Economic ...
0.002186792 |
a/63863