Filter Results

5576 to 5600 of 14308
dcpresentation1fire-station-9---fremontagendaid2821
Design CriteriaExternal Site CriteriaMinimize impacts on neighborhood(noise, traffic, view, scale, sunlight, pedestrain & ...
0.00309258723 |
a/85193
avalon_boards_final
crossing safely whenwalking, biking, and driving•Reduce speeding•Expand the citywide bike network•Add new crosswalksIncrease ...
0.00309258723 |
a/102891
nseattle_greenway_openhouse_folded_mailerprint
nseattle_greenway_openhouse_folded_mailerprint PO Box 34996Seattle, WA 98124-4996SEE MAP INSIDE!Mark your calendars and attend our open ...
0.00309258723 |
a/102129
fortlawton_homelesshousingsubmission_apph-1
• Offer diverse housing choices for incomes, ages and family sizes • Limit total development • Blend new development with existing ...
0.00309258723 |
a/151010
approvedudistrictrezone
. To approve a principal use parking garage as an administrative conditional use, the 7 Director shall, after consulting with the Director ...
0.00309258723 |
a/87761
btgannualreport2013
and maintained 1,024 traffic signals. These accomplishments, and others, are highlighted in the 2013 BTG Annual Report and ...
0.00309258723 |
a/99415
birt_iat_meeting 4_presentation_20200820_final
and projected travel timesand traffic volumesdiffer from bridge studies because of:−Horizon year−Analytical methods−Project ...
0.00309258723 |
a/103947
communitydriveneconomicdevelopmentstrategiesforrb
; however, many of the local businesses and large retailers have failed to capitalize on the traffic that these institution ...
0.00309258723 |
a/87343
2016100
as to the proper route. Drivers also feel uncomfortable when using the Street because there is no clear path for pedestrians. Drivers going ...
0.00309258723 |
a/103146
oneseattleplanfeis-chapter3.4-energynaturalresources
and regulations. Pursuant to the Act, the National Highway Traffic Safety Administration is responsible for establishing ...
0.00309258723 |
a/165720
rooseveltparkingworkshopsummary
locations, as best as is technically feasible. SDOT’s curbspace policy, in the Seattle Comprehensive Plan, includes priority to meet mobilit ...
0.00309258723 |
a/106351
btgannualreport2014
installed 46 pedestrian crossing improvements, replaced 3,144 regulatory signs, completed 366 bridge repair requests, installed 821 ...
0.00309258723 |
a/99416
2016115
Business core, Roosevelt High School, and the Light Rail Station coming in 2021. Weedin place is a one-way cut-through street that allows ...
0.00309258723 |
a/103153
draft swf design standards feb 13 2020 with exhibits
prohibits small wireless facilities attached to the following: i. Poles within medians or traffic circles or islands; ii. ...
0.00309258723 |
a/105793
roxbury_openhouse_displayboards
lanesProtected bike lanesSW 102ND ST12345CMYCMMYCYCMYKRoxbury_Board5.pdf 1 5/16/2017 2:39:57 PMMAY 2017PAVING & ...
0.00309258723 |
a/102650
mhc011123comcastpp
A CHANGE IN OPERATIONS AND MAY CAUSESLOUGHING OF THE TRENCH, ADDITIONAL TRAFFIC CONTROL, ADDITIONAL PAVEMENT AND BACKFILL ...
0.00309258723 |
a/137249
2016091
. They are scheduled to open in the fall of 2017 with approximately 1,700 students. N 90th St is a heavily traveled minor arterial. There is ...
0.00309258723 |
a/103140
southlakeunionguidelines
that have been identified as gateways for South Lake Union due to the level of traf-fic flow, general visibility and/or development ...
0.00309258723 |
a/87963
southlakeuniondg2013
that have been identified as gateways for South Lake Union due to the level of traf-fic flow, general visibility and/or development ...
0.00309258723 |
a/96364
reportonrecommendationsandrezoneanalysis
for Pike/Pine Overlay District 36 Is it surrounded by residential neighborhoods ...
0.00309258723 |
a/87342
141106rv-n-s-ngw-mtg1-sbab2
on the basics Build healthy communities Support a thriving economy Provide great service •City’s safety goals •Neighborhood greenway ...
0.00309258723 |
a/107103
dcpresentation1north-transfer-stationagendaid4271
stalls for commercial and self haul, goal = 25161723A.Offsite Traffic ImpactsMeets(achieves goal of onsite traffic ...
0.00309258723 |
a/85240
2020_rainier_mailer_11x17
as part of Seattle’s Vision Zero program to reach zero traffic fatalities and serious injuries by 2030. During Phase 1, we ...
0.00309258723 |
a/106685
mhc082725limitedvehiclepilotbp
mhc082725limitedvehiclepilotbp Pike Place Limited Vehicle Traffic Pilot Plan (Retroactive)June 23, 2025Pike Place the ...
0.00309258723 |
a/172231
finalcentralewngwtopdf
Avenue SW Delridge Greenway Vision Zero Zero traffic fatalities or serious injures by 2030 www.seattle.gov/visionzero ...
0.00309258723 |
a/102068