Filter Results

5526 to 5550 of 5663
psb1125 jan 15 2025
and the Chief Seattle Club were stakeholders in the project planning. The Board has received several briefings about the ...
0.00219842652 |
a/173637
approved mm may 2 2024 meeting - transforming age final
Acevedo Office of Planning and Community Development 600 4th Avenue, Floor 5 PO Box 94788 Seattle, WA 98124-4019 TEL ...
0.00219842652 |
a/157110
lpb030525minutes
the Programmatic Agreement for the SR520 project. Architectural Review Committee reviewed and supported the proposal. ...
0.00219842652 |
a/167610
lpb072022sacajaweasr
. It embodies the distinctive visible characteristics of an architectural style, or period, or a method of construction. ...
0.00219842652 |
a/131384
lpb070622_elephant_sr
the distinctive visible characteristics of an architectural style, or period, or a method of construction. E. It is an ...
0.00219842652 |
a/130230
fas-priority-hire-arena-seattle-center-pre-job-letter-assent
for each assignment. List each piece of equipment planned for use by craft. Include all equipment and tools. If more ...
0.00219842652 |
a/58804
psb011525fortsonsr
the proposal. The Alliance for Pioneer Square and the Chief Seattle Club were stakeholders in the project planning. The ...
0.00219842652 |
a/164327
release-lpb-recruit-2016_historian_final
of landmark properties. The Board is composed of two architects; two historians; one structural engineer; one representative each from the ...
0.00219842652 |
a/52109
mm lake city september 4 2025 v2 final
:15 pm)Ben GistShirin MasoudiKevin O'NeillZubin RaoMolly SpetalnickCommissioners ExcusedBrian MarkhamStaff PresentMichael JenkinsValerie ...
0.00219842652 |
a/173520
cityofseattlelegislativebulletinweek7022414
to the Public Works Fund within two years rather than the planned six. The Senate companion bill did not advance before ...
0.00219842652 |
a/79961
psb25425oct15_1
Promenade Occidental, King St to Royal Brougham Briefing on planning for street improvements. AP Claudia Sackett Hennum of ...
0.00219842652 |
a/176557
isrd11924
to existing architecture, given the alley’s blank walls and said there are no appurtenances there. He proposed a Japanese ...
0.00219842652 |
a/165178
backtobusiness_applicationguide_english
. It provides an opportunity to discuss safety concerns and identify plans and resources to help enhance safety and ...
0.00219842652 |
a/171823
advancedplanningfordisaster
-revolutionary reality–Criticism is based on the pre-revolutionary perspective (and, therefore, often misplaced)–Not fully integrated into ...
0.00219842652 |
a/57103
psb100224lumenartsr
Staff report: The Board has previously approved signage and artwork for gates. At the time the applicant referred to future ...
0.00219842652 |
a/160949
id7617_1
CERTIFICATES OF APPROVAL 041117.21 706 S. King St. – Bing Kung 4:35 PM Applicant: Paul Wu, Wu Architecture ...
0.00219842652 |
a/72953
id7617
CERTIFICATES OF APPROVAL 041117.21 706 S. King St. – Bing Kung 4:35 PM Applicant: Paul Wu, Wu Architecture ...
0.00219842652 |
a/72952
survey1_resultssummary
engagement, will help shape the planning process and key issues that are addressed in a strategic community plan.SUMMARY OF ...
0.00219842652 |
a/86659
cityofseattlelegislativebulletinweek602182014
the planned six. The Senate version has not advanced. HB 2244 was placed on second reading by H Rules. Stormwater, flood ...
0.00219842652 |
a/79960
seattledesigncommission-2015.07.02udistrictminutes
CommissionMarj PressPlanning CommissionMartin ReggeDesign CommissionJohn SavoDesign CommissionRoss TilghmanDesign CommissionOffice of ...
0.00219842652 |
a/84931
pre-job-conference-package-and-waiver-request
assignment. List each piece of equipment planned for use by craft. Include all equipment and tools. If more space is ...
0.00219842652 |
a/58868
psb061825occparkartsr
. The ARC asked the application to be updated with the correct dimensions and identify which of the two locations on the site ...
0.00219842652 |
a/169848
psb101525occpromsr
: briefing on planning for street improvements Staff report: Code Citations: Seattle Municipal Code 23.66.030 Certificates ...
0.00219842652 |
a/174171
id3.10.15
in nine (9) storefront windows and installation of a display case for display of artwork on the north façade. Exhibits included photographs, ...
0.00219842652 |
a/72936
pspbagenda_7-28-21_arc
Paper” PSB 118/21 AGENDA – Architectural Review Committee Meeting Date: Wednesday, July 28, 2021 Time: 9:00 a.m. Place: ...
0.00219842652 |
a/74007