Filter Results

5501 to 5525 of 5663
alki_es_sr
in the building itself. The Coordinator recognizes the architectural character of the 1940s portions of the building, but ...
0.00219842652 |
a/126931
lpb082124fifthavecourtsr
of an architectural style, or period, or of a method of construction. E. It is an outstanding work of a designer or ...
0.00219842652 |
a/159380
lpb030525burwellhousesr
lpb030525burwellhousesr Administered by The Historic Preservation Program The Seattle Department of Neighborhoods LPB 60/25 STAFF REPORT ON ...
0.00219842652 |
a/166128
lpb040225wildestreatfieldsr
of an architectural style, or period, or of a method of construction. E. It is an outstanding work of a designer or ...
0.00219842652 |
a/167364
lpb030123cettolinhousesr
or nation. D. It embodies the distinctive visible characteristics of an architectural style, or period, or a method of ...
0.00219842652 |
a/139113
ccarchagenda_3-7-17
Ave. S. 4:00 PM Applicant: Jennifer DuHamel, DuHamel Architecture Briefing on storefront alterations and signage for a ...
0.00219842652 |
a/72806
accountability-audit-07-01-05-to-12-31-05
a full range of services including water, drainage and wastewater, solid waste, electric, police, Municipal Court, fire, emergency medical, ...
0.00219842652 |
a/58338
lpb110525americancansr
of an architectural style, or period, or a method of construction. F. Because of its prominence of spatial location, ...
0.00219842652 |
a/174810
lpb011525boylstonsr
lpb011525boylstonsr Administered by The Historic Preservation Program The Seattle Department of Neighborhoods “Printed on Recycled Paper” ...
0.00219842652 |
a/164221
idagenda_10-22-19
OF APPROVAL 102219.21 1253 S. Jackson St. – Little Saigon Housing 4:35 PM Applicant: Michele Wang, Runberg ...
0.00219842652 |
a/72975
ccrcagenda_2-6-18
Walters, atelier dome architecture Design: Proposed storefront remodel for new tenant (Bar Tapeo). Proposed work ...
0.00219842652 |
a/72842
ccarchagenda_4-4-17
Ave. S. 4:00 PM Applicant: Jennifer DuHamel, DuHamel Architecture Exterior alterations: Proposed storefront ...
0.00219842652 |
a/72807
lpb100224woodinhousesr
important in the history of the City, state, or nation. D. It embodies the distinctive visible characteristics of an ...
0.00219842652 |
a/160914
lpb101624stewarthousesr
of an architectural style, or period, or of a method of construction. E. It is an outstanding work of a designer or ...
0.00219842652 |
a/161389
lpb060524insbuildingsr
way with a significant aspect of the cultural, political, or economic heritage of the community, City, state or nation. D. It embodies the ...
0.00219842652 |
a/156828
idagenda_11-12-19
Presenters: An Huynh, SCIDpda, and Lisa Chun and Josh Brevoort, Zeroplus Briefing on early concept plans for ...
0.00219842652 |
a/72986
pspbagenda_8-19-15
to attending the Board meeting, all applicants with the exception of those seeking a change of use should appear before the ...
0.00219842652 |
a/74019
2020_spp_providerfacilitiesfund_appl_attach_2-4
2020_spp_providerfacilitiesfund_appl_attach_2-4 Attachment 4.-Funding Sources Attachment 3. - Budget Attachment 2. - Schedule Total ...
0.00219842652 |
a/55812
2021_spp_providerfacilitiesfund_appl_attach_2_4
2021_spp_providerfacilitiesfund_appl_attach_2_4 Attachment 4.-Funding Sources Attachment 3. - Budget Attachment 2. - Schedule Total ...
0.00219842652 |
a/55706
2020_spp_providerfacilitiesfund_appl_attach_2-4
2020_spp_providerfacilitiesfund_appl_attach_2-4 Attachment 4.-Funding Sources Attachment 3. - Budget Attachment 2. - Schedule Total ...
0.00219842652 |
a/55788
2023_spp_providerfacilitiesfund_appl_attach_2-4
2023_spp_providerfacilitiesfund_appl_attach_2-4 Attachment 4.-Funding Sources Attachment 3. - Budget Attachment 2. - Schedule Total ...
0.00219842652 |
a/142386
2022_spp_providerfacilitiesfund_appl_attach_2-4
2022_spp_providerfacilitiesfund_appl_attach_2-4 Attachment 4.-Funding Sources Attachment 3. - Budget Attachment 2. - Schedule Total ...
0.00219842652 |
a/127742
lpb060524terminalsalesannexsr
changes: Final Design for new construction, partial demolition and rehabilitation as described in the application submittal and submitted ...
0.00219842652 |
a/156831
isrdminutes_9-27-22
of Hong site plans have not been received yet for review so it will be some time that the mural will be visible at this ...
0.00219842652 |
a/139605
psb27724oct 2 2024
: The Board has previously approved signage and artwork for gates. At the time the applicant referred to future plans to ...
0.00219842652 |
a/173549