Filter Results

526 to 550 of 9052
treeregsconstituentemailsthrough100119
of 'peer review' especially useful if SDCI's arborists are already over stretched and not able to look at all building ...
0.002275242 |
a/119475
lb-ord
and 9 reorganize, consolidate, and update standards when meeting the green building standard 10 is a condition of a ...
0.00227491441 |
a/53447
entire_2008_proposed_budget
and analyzed each month. ISSUING CONSTRUCTION PERMITS The Department of Planning and Development (DPD) is responsible for ...
0.00227423571 |
a/61385
urmfinalrecommendations
to be abated or braced. This requirement is enforced when SDCI receives an application for a building ...
0.00227408623 |
a/96918
2012seattlefirechapter9
stories in height shall be permitted to beinstalled throughout in accordance with NFPA 13R.NFPA 13R sprinkler systems are ...
0.00227361149 |
a/97616
2018sbcchapter23
. The design of plank and beam flooring is permitted to be in accordance with the AWCWood Construction Data No. 4.WOOD2018 ...
0.00227333675 |
a/97436
treeregsconstitutentemailsthrough121719
one parcel into six – 11350, 11348, 11346, 11344 and 11342 23d Ave NE. Each newly created lot was approved for a single-family home. Anytime ...
0.00227333233 |
a/119502
ucuv_detail_permit_report(0)
in the permit application and not reported as individual units. Congregate residences include dormitory, group living and ...
0.00227328087 |
a/84308
dr2017.01ebrfinal
permit documenting that at least 50% of the building is classified under the Seattle ...
0.00227288972 |
a/90326
dr2017.01ebrdraftv1
or construction permit documenting that at least 50% of the building is classified under the Seattle ...
0.00227288972 |
a/88293
dr2017.01ebrdraftv1
or construction permit documenting that at least 50% of the building is classified under the Seattle ...
0.00227288972 |
a/57396
dr2017.01ebrdraftv1
or construction permit documenting that at least 50% of the building is classified under the Seattle ...
0.00227288972 |
a/90325
dr2017.01ebrfinal
or fewer occupants c) Buildings used primarily for manufacturing or industrial purposes, as demonstrated by submitting one ...
0.00227288972 |
a/57397
appendix_p_madison_traffic_ops_update_memo
implementation of the project. As part of the updates, a revised PM peak hour build conditions analysis was conducted and n ...
0.00227250648 |
a/106143
2006_entire_adopted_budget_document
; - Stormwater, Grading, and Drainage Control Ordinance; - Housing and Building Maintenance Code; and - Seattle Noise ...
0.00227173418 |
a/60998
4-3_written_comment_responses_mha_feis_2017
information not yet available, such as building footprints, heights, and locations. Evaluation of these impacts is best ...
0.00227074744 |
a/65044
ose director's report
Permitting fees tied to efficiency  Land use incentives for deep efficiency  Incentivize waste heat utilization  ...
0.00226991531 |
a/88450
sdot safe start ord d4_sepa
building premises. The permit program adapted from its existing permit structure to 26 ...
0.00226991531 |
a/131922
desrpt_1101epike
the freight elevator overrun space and an exit stairway. The building is listed on the City of Seattle’s list of ...
0.002269521 |
a/76323
2seattle2015swmp203272015011637.pdf
the project will require, and what the permit process will entail. If the project is a multifamily or commercial ...
0.00226900773 |
a/112736
2designforpermittingenvreviewfinalredacted
Agency RCW Revised Code of Washington RHA Rivers and Harbors Act ROW right-of-way RUP Revocable Use Permit SAC SEPA ...
0.0022685728 |
a/154258
2014stormwatermanagementprogram
will require, and what the permit process will entail. If the project is a multifamily or commercial ...
0.002268468 |
a/112680
2010_proposed_budget
commercial activity and efforts to conserve by residents. The Department of Planning and Development (DPD), which relies on ...
0.00226828037 |
a/61757
sdcirecommendationnov2017
% reviewed biannually. If the University does not achieve 18% SOV campus trips by 2022, 16% by 2024, 14% by 2026, and 12% by 2028, master ...
0.00226789713 |
a/77860
ose_directors_rule_2016-01
of Occupancy (C of O) – a certificate issued by the Seattle Department of Construction and Inspections (SDCI) after final inspection of ...
0.0022677565 |
a/57447