Filter Results

5301 to 5325 of 5516
pspbagenda_8-29-18_arc
Paper” PSB 228/18 AGENDA – ARCHITECTURAL REVIEW COMMITTEE MEETING Date: Wednesday, August 29, 2018 Time: 9:00 a.m. ...
0.002186792 |
a/74024
isrd031224_engsr
of a Certificate of Approval for use and for exterior and site alterations as identified on the applicant’s site plan and ...
0.002186792 |
a/153580
pspbagenda_9-5-18
to attending the Board meeting, all applicants with the exception of those seeking a change of use should appear before the ...
0.002186792 |
a/74043
final - 2017.07.25 capitol hill guidelines update meeting ...
Office of Planning & Community Development (OPCD) and Department of Construction & Inspections (SDCI) and the Capitol Hill ...
0.002186792 |
a/86467
pioneersquare-01-21-15-agenda
: In addition to attending the Board meeting, all applicants with the exception of those seeking a change of use should appear before the ...
0.002186792 |
a/73722
pioneersquare-01-07-15-agenda
: In addition to attending the Board meeting, all applicants with the exception of those seeking a change of use should appear before the ...
0.002186792 |
a/73720
final-2018.01.25capitolhillguidelinesupdatemeetingminutes
, the fifth work group session was held at 12th Ave Arts (1620 12th Ave) in the Capitol Hill Neighborhood of Seattle. This meeting was ...
0.002186792 |
a/86471
pioneersquare-04-01-15-agenda
: In addition to attending the Board meeting, all applicants with the exception of those seeking a change of use should appear before the ...
0.002186792 |
a/73729
pspbagenda_7-1-15
to attending the Board meeting, all applicants with the exception of those seeking a change of use should appear before the ...
0.002186792 |
a/73996
pioneersquare-03-18-15-agenda
: In addition to attending the Board meeting, all applicants with the exception of those seeking a change of use should appear before the ...
0.002186792 |
a/73728
ballard-03-05-15-agenda
Jonathan Williams Update on plans to install pay kiosks within the Ballard Avenue Landmark District. 030515.22 C & C ...
0.002186792 |
a/72636
bordeaux_nom_sr
characteristics of an architectural style, or period, or a method of construction. E. It is an outstanding work of a ...
0.002186792 |
a/75180
pspbagenda_6-3-15
to attending the Board meeting, all applicants with the exception of those seeking a change of use should appear before the ...
0.002186792 |
a/73992
fs31-interim
: FS31@seattle.gov PROJECT TYPE New Interim Station STATION OPERATIONAL October 2021 SITE Leased DESIGN TEAM TCA ...
0.002186792 |
a/63984
isrd082724_515 s. main_sr
details: This is part of a pilot program where installation is planned for one- to two-years, after which time the ...
0.002186792 |
a/159512
isrd082724_670 s. weller_sr
: This is part of a pilot program where installation is planned for one- to two-years, after which time the structure would ...
0.002186792 |
a/159511
lpb11-16-16_minutes
in Seattle. Mr. Luoma said he was on the fringe. He said the merits of the Black Manufacturing building are larger because of ...
0.002186792 |
a/74635
seattledesigncommission-2003.12.042026emadisondesigncommissionmin ...
. Robertson Nic Rossouw Donald Royse Sharon E. Sutton Tory Laughlin Taylor John Rahaim, Executive Director Layne Cubell, Commission ...
0.002186792 |
a/85328
idagenda_1-22-19
, KMD Architecture (on behalf of Da-Li International) Final Design: Proposed final design for new construction of a ...
0.002186792 |
a/72965
lpb30624lakecourtapartmentssr
the distinctive visible characteristics of an architectural style, or period, or of a method of construction. E. It is an ...
0.002186792 |
a/162043
isrd112624_807 s. king_sr
isrd112624_807 s. king_sr 1 ISRD 202/24 Staff Report Address: ROW adjacent to 807 S. King St. Record #: DONH-COA-01471 Applicant ...
0.002186792 |
a/163021
lpb040324queenannepoolsr
the distinctive visible characteristics of an architectural style, or period, or of a method of construction. E. It is an ...
0.002186792 |
a/154498
lpb032024queenannepoolsr
the distinctive visible characteristics of an architectural style, or period, or of a method of construction. E. It is an ...
0.002186792 |
a/153923
20181016-hubbardpublicmeetingnotes
20181016-hubbardpublicmeetingnotes HUBBARD HOMESTEAD PLAY AREA PROJECT Seattle Parks and Recreation’s Planning & ...
0.002186792 |
a/93216
urban-forestry-commission_pos-6_landscape-architect
urban-forestry-commission_pos-6_landscape-architect Seattle Urban Forestry Commission, Position #6 – Landscape Architect SEATTLE – The ...
0.002186792 |
a/52162